You are on page 1of 56
GOVERNMENT OF DUBAL MATERIAL TRANSMITTAL SHEET eels sm saien [Contractor GE GRID SOLUTIONS CONTRACTOR REF. facress. JALSTOM, Floor-38 U-Bora Tower, Bay, P.0.80X.48957, Dubai, UAE Date: S-Aug-17 ‘Al Abraj Stoel, Business [CONTRACTOR PREVIOUS REF. |Phone: +971 4 4209 520 | FAX: +971 4 4294170, [Date: ho Dui city & Water Auhonty 0, Box see Diba tenon Project Manager Dewa JGonTRACTNO RFP 0612016 DESIGN, SUPPLY, CONSTRUCTION, NSTALLATION, TESTING & COUNISSIONNG OF OTTAT CONTRACT DERCRIETION: SUBSTATION IN AVIATION DISTRICT AT DUBAI SOUTH SUBSTATION SCADANANE AVIATION Motel Code: 8 ToucofSounty ot Specumber | Re. are of Matera wcarecany Supper |. ode Number 152.1004Re9 sagged, | 5 iu Jsw- NOW Ws Hojzon/ Ua | ciDuet/owiae Location of Usago| Material Used for Basement, Ground Floor, First Floor & Root ‘Supply! Return/ Extract & Fresh airfor AC System “Technical Catalogues Test Report Representative Samples Standards Applicator as Required Compliance of DEWA Spec. / Required lWe undertaken tha the work wil be done as per specifications and manufactures instruction, and we understand this approval does not releve us of Jour unresticted responsiblities for any discrepancies, errors, mistakes, omissions or deficiencies inthe document or the materia [Romarks: Jon Behalf of Main Contractor Jorginator Project Manager Iam: SEENIMOHAVED Name: BASSAM EL RAWAS [Gontaci No WEFT lEmaa io: REF! ‘TRANSMISSION ENGINEERING DEPARTMENT. L (i) | PROJECT : DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 132/11KV SUBSTATION IN AVIATION DISTRICT AT DUBAI SOUTH ~U.A.E CLIENT : DUBAI ELECTRICITY AND WATER AUTHORITY. CONSULTANT + POYRY SWITZERLAND. LTD MAIN CONTRACTOR : GRID SOLUTIONS HVAC & LSP CONTRACTOR: JAMAHEER CONSTRUCTIONS L.L.C SUBJECT : MATERIAL SUBMITTAL FOR GI DUCT REV-A TABLE OF CONTENTS 1, SPECIFICATION & COMPLIANCE STATEMENT 2, SCHEDULE OF GI DUCT 3. PRODUCT CATALOGUE 4, CERTIFICATES 5, COUNTRY OF ORIGIN 6. COMPANY PROFILE 7. TRADE LICENSE 8, PREVIOUS PROJECT APPROVALS 9. PREVIOUS PROJECT REFERENCE. SPECIFICATION & COMPLIANCE STATEMENT substation Package Type Air 1S J> 132kV_ Substation Package Type Ai Oo 153.1.004-Rev9 Conditioning end Ventilation 39 Para 39) Para (40) Para (41) 30 Para (42) Pora (43) Para (44) Para (45) Para (46) 3a Para (47) a2 Para ($8) Para (49) Refrigerant Piping Liquid fines shall be insulated where they are in direct sunlight or where they pass through non-air conditioned areas. ‘ction lines shall be insulated over ther entire length (insulation thickness 19 mm. All insulation to reftigeraton pipe work shall be Hexibe closed cell foam phenolic rubber type with a temperature range of -40°C to +105°C and having a thermal conductivity of (0.0375 wim"C a 21°C and a water vapor transmission of less than 6.0 ngs. Reffigerant pipes should be properly supported, insulated and duly finished with canvas cloth and two coals of Foster seal, The same shal be ran through GI trunking Duct Work All ducting carrying air-conditioned cit shall bo insulated with rigid fiberglass insulation {il faced having a density of 48kp/n? and. thickness SOmm for duets on roof and 251mm thick for internal duc duly finished with Soz canvas cloth and two coats of Foster seal 10 the approval of DEWA's Engineer. All hese ducts installed inthe roof and ducts exposed within substation building shell have aluminum cladding. Aluminom cladding joins should be properly sealed. Supply and Return air duct plenums on roof should be provided with 25mm thick, 24 kg fm? density rigid Mberlass acoustic insulation with perforated sheet finish. ‘Aluminum cladding work to be done forthe duets which is running on the sprinkler protected rooms. ‘Smoke extract ducts shall be Fire rated comply with BS 476 -24 having DCD approval. ‘The duct work shall be designed on the basis ofthe equal fiction method for a maximum Sietion oF4 palm of duct length (or 0.05 inch ftetion per 100 f). Condensate Drain Provision shall be made for condensate to be passed into the rainwater drainage system. Condensate drains sbould be properly supported, insulated and éuly finished with canvas cloth and two coats of Fostor seal, Aluminum cladding should be provided on top of faster seal. Condensate drains must be routed directly into the drainage system or individual soak ways as per approved drainage drawings. Air Filters All filter media shall be properly Bonded and protected against filer fiber or particle migration. The direction of airlow shall be leatly marked on all filter panels and on installation frames. All fresh air filters shall be SO mm thick combination aluminum synthetic pane! filters. All fesh air filters including that for fire pump room shall be with handle for easy ‘removal for fature cleaning and maintenane. Dubai Electricity & Water Authority Page 7 of 2 All Rights ae reserved i | Jamaheer jghlaa SPECIFICATION COMPLIANCE SHEET roncraoe [SEU AMATI, ET, aS oF TT CLIENT M/s. DUBAI ELECTRICITY AND WATER AUTHORITY | MAIN CONTRACTOR | M/s. GRID SOLUTIONS HVACELSP | ws Manse coNsTRUCTONS Lc MATERIAL GIDUCT- REV-A SPECIFICATION REF. | 1.5.3..0.04- REV-9 (Clause 3.10, Para 42) SECTION Er. ‘SPECIFIED COMPLIANCE ‘All sheet metal ducting shall be manufactured and installed in accordance with the Institution of Heating and Ventilation Engineers Guide to Current Pra Section B16, the American Society of Heating, Refrigeration and Air Conditioning Engineers, or the Heating and Ventilating Contractors Association of the United Kingdom Specification DW/144 or equivalent international standards (SMACNA) for sheet metal ductwork for low velocity low pressure air system with air velocity of up to 7 m/s on the main roof ducts. Minimum duct thickness should be 0.8 mm. 3.10 Para 42 Complied with DW144. Please refer | attached Duct Construction Schedule. DEITIES ———— Specification Compliance Sheet Page 1of 1 SCHEDULE OF GI DUCT Horizon HORIZON VENTILATION EQUIPMENT MANUFACTURING L.L.C (0, Baw: 282786 © Dubay #inited Arai Emiean Tel, MUTT A HUBUTE eas QUIT LITTON eT mall: hyeund T | RuetLonger | rhickness | Longitudinal yeet | | Sizeinmm (mm) Joints Length (mm) ou | ‘Transverse Joints. = Grooved | Stifened | T6 Opposite sides fat hemmed s Gate and 72 oastnm | osonm Pawar | 1200 Seed ‘6 Opone ses thom | | t 30m Flange Excl /Equvalentalide om | Grooved / 220 —-‘Stlfened_—_“Flanges, 1201S on all our sides with 225 | | 381-1000eum 080mm | Pittsburgh . Steel Corners and 1 pc of ArtNo. 124/125 Cleat per | | | sem oe se. f T 1220(4') mm a ivalent slide on I eer 230mm Flange Excel / Equivalent hi Grooved/ | sqpurpesci/ suitenea __ Flanges, 1301S on allfour sides with 233 1001-1600mm) 100mm | Pitsbureh | “Etta | sect open pot Arh 194/235 Ceatper | Flange at at lage at 610mm Center. | 610mm Center) | ____Fauivatenlangeat 610mm center 4220 (4) ‘40mm Flange ~ Excel / Equivalent slide on omreay | SOE | ay | ‘Mampi Etre de 1601-2500mm | 100mm | Pitsburgh | MOmmmESCe/ Silene | corerrand2 peo artNo-S0S Ceatperside, | i | a | eee | | eiccceemar | | sgmmtbeter) |___fauivaletange at hdmi Center. HO) |_| demmiange-teea/ egress | Grooved; | lStiffener Flanges, 16115 on all our sides with 243 mm Excel / | Stiffene 25012000mm | 120mm | Presargn | SORMEREI/ Steed ce ae N25 | seam | Reinforcement Stifener 40m Excel / ' laine |___Suvatent Mange at 6tomm Center. ‘Above materiale are made of galvanized steel. “Transverse duct connectors are based on max. 220mm spacing Pane stiffening shal be done by means of beading at 300m distance. Companion angle and duct intermediate reinforcement are mae o 312 ‘Above duct work ae supplied in mil finished only. neil PRODUCT CATALOGUE Galvanised Steel Product Handbook JEW Stee Limited — sw YSW isa part of $4 billion OP Jindal Group with interests in mining, carbon steel, power. industrial gases andport facites JSW under ine leadership af Mr Sayan Jindal is $ 2 billor JSW spread its wings across vanous sectors as under JSW Stee! Limited India's 3rd largest steelmaker JSW Steel Limited consists of the most modern, eco-friendly steel plants with the latest technologies for both upstream and downstream processes with facilies from tron ore ‘mining to production of pre-painted ste! Jindal Praxair Oxygen Co. Ltd. Ajoint venture between JVSL and Praxair Ine USA JPOCL manufacturers oxygen. nitrogen and argon, and has the world's largest air-separation plant JSW Energy Limited STPCL is a 2 x 130 MW power plant supplying Power to JVSL and Kamataka state OUR VALUES ‘Young thinking is crystal clear Openness and transparency above ail e'se Be it in our transactions. our operations or our interactions with our stakeholders, Young thinking is unique No two problems can benelit from the same solution Iie our job. therefore. to aiferentiate the benelit cf our actions so as 10 be able to provide customers and the community al large, supenor products ompany today Over just a few decades Vijayanagar Mineral Pvt. Lt YMPL is a4 millon ton per annum iron ore mining company situated 25 km from the integrated ste! plant, JSW Stee! Limited ‘South West Port Ltd. Handles 5 milion ton per annum of cargo from two 450 meter berths SWPL helps JSW to impor raw materias and export finished Goods Southern fron & Steel Company Lid. SISCOL is an integrated stee! plant manufactuxing pig iron, bilets, bars and rogs for construction and engineering applications ‘Young thinking fosters leadership Every man is his own master Every man has the ability 10 make vital decisions at every level. Its the quality, the speed, the resilience and the coherence with which those decisions are made that determines true leadership, ‘Young thinking is for winners To innovate. to benchmark value beyond expectavons to sinve and to deter imei ‘Widest thickness range from 0 10 to 2.50 mm & width upto 1250 mm, ‘Sophisticated moveable auto coating gauge control system supported by X-ray measurement device Fully equipped testing laboratory consisting of Universal Tensile Testing Machine, Vickers & Rockwell Hardness Testing Machine, Erichson Cupoing Testing Machine, Salt Spray Testing, Atomic Absorption Spectrometer. Emission Spectrometer, Image Analyser. Aico Meter and Roughness Tester Non reversible on line and offline skin pass mill having thickness range 0.30 - 2.50 mm and width range 760 - 1250 mm. Ceramic pothaving 165tcapaciy Digital control system SCADAandiogging facility for effective process control I Maree Awards & recognitions: ‘Highest Export of Engineering Products’ for FY 1995.97 by Directorate of Industries Government of Manarashira ‘Niryat Shree’ an award for export performance FY 1997-88 by Federation of Indian Export Organization (FIEO) @ set up by Ministry of Commerce-Goveriment of Incia ‘Award of Excellence’ by Crompton Greaves in the years 1999 & 2000, “Top Exporters’ award by Engineering Exports promotion Council, Mumbai for its export performance in FY 1999-2000 “Bost Export Performance’ award -2001 by Tarapur Management Associaton “Innovative HR Practices” by Ail India HRD Congress in the FY 2001-2002 “Best Suppliers’ award by Honda Scooters & Motorcycles india Ltd in the FY 2002-03, “National Quality’ award by the Indian Institute of Metals supported by the Ministiy of Steel, Government of Inia for he year 2002, amongst the pig ron plant! OR uni major re-oling unit category Listed among the top 25 companies in India Survey entitled ‘Great Places to Work’ conducted by Great Piaces to Work Institute, US and Business World “IMC Rambkrishna Bajaj National Quality Commendation Certificate-2003" mn the manufacturing category Certification & approvals : 180 9001 : 2000 accredited by IROS, Mumbai Bureau of Indian Standards (BIS) certification for 1S 277 - 2003. Galvanised steel is inspected and certified by reputed national agencies like PDIL, RITES. SGS Tata projects and IRS (in case of specific customer requirement) Primary producer of steel by Joint Plan! Committee Ballot boxes for elections Delhi metro rail project Galvar 1d coils & plain sheets ‘Thickness | Thickness tlerarce = 010 628mm 5028-0 50 mm 2080-1 0mm > 10mm merness watn ge condi dye conation tolerance Edge wavy cos ie wavy sheets canter “Other tolerances Bucking Bow Diagonal dtecence sw 010-250 mm Matenalin< 0 89 mim; thickness car also be supplied in hard tempe 18 microns (soread of 30 microns) 1 microns (epteas of €C microns) 0. meron (soread of 60 merons) £25 % ofthicxnese oF 190 ms whichever shane) 760-1259 mm + 8-Cnm 50-1240. +0501 -0 50 mm (spread of 10 mm) 500 - $000 mem + 10-0 em (spread of 19 em) + Tr (sprea of 2 me) 90-275 gsm Tomes! mileage mm 3 waves! meter Simm 2waves mater 2mm mar in2 mtr ength 5mm 2 nos per meter sommmax Soll hans Streicn leveled nen setchlevellec! shin passes 0.23. 2.50 mm tckness (0.30.2 50 mm hchness (sot only) (0180-200 microns (afer skin passed) Bight mate (reqular’smai/ bg suppressed spangles) Chromated’un-chromated & ed 100 mg/m te 1000 mg/m each sete ‘On tine ioge can be gives 506 me Cardboard ID & OD Steel strap & seal 314") Description | HRID ring Wooden palet GP sheet Cover, Wax paper { optional) HDPE paper laminated VCI Coils [seaworthy | Yes | ves | ves] | +1 ves Hetaic Yes | Yes | Yes || Yes Non metalic Yes_| Yes. a Sheet packets Sea worthy [ves] Yes [J | ves | Metalic [ij Yes | [ves | ves Me | Steep ee Non metic (Tes fart ves Yer | Identification & marking Ber code and printed paper sticker containing details of manufacturer name, customer name, coll number, grade, 2e, langth of coil, number of sheets and net & gross weight. ‘SEA WORTHY COILPACKING ‘SEA WORTHY SHEET PACKING. Technical delivery conditions : GP-J1 yew EEL Cee onthe eee) (max) | (max) eyes] sal =e oro | ee |e | on | ee | en Tease [oss 38 yaoe 37 25) 38 ga 46275) 030 | s0ppM ‘00s | 030 | soPpu | “030 | 306 030 | 9061 030 ELAS grad HSLAS grade 50 (340) | HSLAS grade 601810) | The sum of copper rule, chromium and molybedenum shall net excoed 0 50% on heat analysand india ints ef Cu-0 20. NH120, Cr-0 15 and Cb-0 008% max steel naving a carbon content of 9.02% or less the limit for columbsum is 0 048% maximum 1 The its G6 ot apply when HSLAS is spectes sions tolerances (WOM mm) ae ‘AI 25 mum dislance fom edge ‘Ai 10 mm distance fom edt nae i 10 mm distance from edge Technical delivery conditions : GP-J1 raw Reference specification: ASTM A 653/A 653M 2003) (Commer Paton structural qualities > 1500-3000 | > 3000-4877 220-9 238 Yad srengtn | Tensie srengh | % Elongaten tanimoa) | minima) | at Socemn= | — AePieaton 170-380 | 20 [205-360 90 Commerc ste! as si ee ‘To-ai0 ; 15 270-310 2 Forming steel | 230 | 310, 20 | | ariass: 236 360 78 10075) 775 380 16 | ss } 2 8} suet stee! . | 013s0) cass 1 Suncor gh strength on oe coe noe Hoh strength on Sarele shouldbe cul tom the product logtuain!t ‘a - The typical mechanica’ property values presented here are non mandatory b= Forthicknass 0.71 mm ar thinner na tension test is required the hardness result in Rockwell B 85 or higher c d ‘oling direction = Where an ellipsis (-) appears in this table. there is no requrement, but the analysis shail be reported, ~ HSLAS grades wil be supplied for 1.20 mm & above thickness only @ Cres (Commerci Pheheeter tens fnge of | Matena grade CS FSior diferent ckness mmm | Matenal grade SS bend =400 [> 100-2200 0 | 255 | 28 i ir | at [ ast | 2t or | 1st 2t [ise [ar 410 zs | 340 | 410 | 480 | 550 ee re [on [ssi [ast 3t ue [oa [ase [ast fae wo a Past Past [cat a [on [oe Fase [ast + 8S grade 340 and 550 and HSLAS type A ayados 480 and $50 are nol subjected to bend test requiements, Prost moeness fass of coating * (WOM - gsmi ‘rade of | _Mrimum average eaatng Minimum eoaing cating (St) | __massin inp spot test mass snge pts um maida vale obtained tole spo test + Totaimass including horn surfaces ditional requirements agreement between the purchaser and the manufacturer and this shall be regarded as the nominal thickness Coils and sheets snail be supplied in regular spangles, small spangles and suppressed spangies. Sheets for other sizes (thickness, width and length) may also be supplied subjected to the mutual The thickness of coils! sheets shall be expressed as finial thickness after galvanising in milimeters Microalioying element addition optional at SW Steel Limited's discretion oras per mutual agreement {231 CERTIFICATES re ceteg = —— \ 3s : \ 33% z Bae aE oe SET maa | aos =, |e o.oo fosox.0 —Jocoe 91¢_| Ox wuozeT Seeuoraer | —twamowo ot BS | fusoo nnn —aceoo wae |S wuz ruseoraa | —opoosevio tS Sh fio —esoo9Towooe jane —tae Fiiscro9. | ~easosB¥5 $35 o faa 09 icone Fusorass | “eseosvioAT TS (em eG tee rinacras: | —reamevion fm = TD ase |S xwuNZEL viisorie: | —seOEVIONT RS |S snr sco maa | sie|- Sewanee Siasorast | —nemewrony F< |S i jaa00 3 —oe000 [eve [~5 x wares sresoros. | —oreowwisatl {== |O fosoC 0 ue ox wwozZE ‘SpesorcoL SIEONOVLOA] 3° 5 bon sz_| axe sera | peoavont| Se \m i peu Taze|o xaoezs | asesorget | “SosonmvtOA LIC % apse oss0 0 Tear [9 xamozer ‘esescrosi | saeoxsvion 1]° ‘soo a0 a [aie }a wore esescreat_| “yasosevi9A amoeaL50 x Cae oyraune Secaare: | EreDNevION 8009 2590 2 azo xcatoret eeesoroni | “ero savIOR 0. 7 Scan, i esevares |“ sortrevion ao 5 Sywnez arezaror | ~sovtrovion axe = Seance Spezayat | —s0.Ara¥LOR Fane > ~Sactropest wea | “isscret | —aeosaWieA ax wugezs “sive0rcsk | o08d9¥L5A. Somaya Suragraat | —essor¥IDR Srewanest stysarcat | “aBrosvTR Sewn Sirs0rGst | —IBONEVISA Cowannes BSOEION Sawer i SBDDOVIOA pre SEUDIGVION Siam Sea WION ‘pxiunezs TesmnxeviSA [Sx waoee Se80N8¥1SA Sxwaee { SEOEVIOA poe preubas i SEOODEVION, Sycawreet t TeEDSvION ie SywuoeZt CEBEWIOT pe Semaseet eescIGs | BeeOVIOR ‘vty ‘ws| %s| ww UF S8zIS_ | ON 12H] 4aqUiNN 1oD| Trea evanraveon | rae re [aims ANIoIN COUNTRY OF ORIGIN ot ee 1382 38206 CERTIFICATE OF ORIGIN (NON PREFERENTIAL) Q q {COMBINED DECLARATION & CERTIFICATE ISSUED IN INDIA) tev = He cove nol HOH INDIGN MERCHANTS’ CHEMBER ca some, 168 Ens ucts al Se eat See Set ate ay Pehb cow scutes cat 4sW STHEL COAND PRODUCTS LIMeT=D SSW CENTRE, BANDRA KUALA COMPLIK © BANDRA (BAS1) 4URBA 40005) MABARASHT, INDIA [PHONENO :9122¢2861000 FAX NO: 91224286000 REFERENCENO rar ereaiee sas } TOTHORDRR OF [BMIRATES NBD BANK PSC ‘acne cana Ti inci Bao sper orner FROM NAVA SHEVA PORT ININDIA SE Soe hea en Rie Oe hee Ra age ay Hele BF Eat Ne adtongatcne TO JBBEL ALI FORT, VALE Sooty sueme } 76-COLS Ivo No boa] ans: aL COUS PRIM! HOT DIPPED GALVANISED STEEL COU: sani | Dubai | ISSUING BANK'S NAME: EMIRATES NBD BANK Fasc si.es Datos [maT RET Posner i ENeDLCA60n2026 DATE OF ISSUE 20160310 1935 YOKE, NAMAE AND ADDRESS OP MANUFACTURIR Toro: oF Ti Goons. 418W STEEL, COATRD PRODUCTS LIMITED IS CENT, BANDRA KUR}A COMPLEX ANDRA (LAST) MUMBA! 400051 MAHARASHTRA, INDIA 76 | PHONENO: 17242861000 FAX NO : 912042863 cous WeIHREDY CERNPYSHAT THE GOODS AREOF INDIAN OWUGIN i aye or mz axroxn Tow 5B COATED RODLCTS LTD [NAME OF THM EXPORTING COUNTRY : INDIA 1 GERTRICATION (nc; "2 ORRLAWATION BY THE EXPORTER . ‘tenders Nr es tne aon at ones LSCarrRG a gh remeron ceemereee t | COMPANY PROFILE Horizow HORIZON VENTILATION FQUIPMENT MANUFACTURING Horizow Bp eS all Sled FSU HORIZON VENTIL ATION EQUIPMENT MANUFACTURING Greetings! We take this Occasion in Introducing "HORIZON VENTILATION EQUIPMENT MANUFACTURING (HVEM), emerging from Ahmed Ramadhan Jura Group (AR) Group) engoged in manufacturing of High Quality Gi Ducts. HVEM factory i tuted sn Al Quoa Industral Ares a heart of Dubai, equipped with atest high end technology ‘machines from world clase manufacturers with strong and professionel team, The above features were planned and installed keeping in view the customer, their satisfaction, market requirements and growth. Ducts manufuctured by HVEM are designed fo meet the standards of SMACNA and DW, The ducts are manufactured by using atest CNC Contralled Auto Coil ine and Plasina Machine to meet high production/castomer requirements and delivery of best ‘quality duets to our customers. The machineries deployed were made with latest tech- nology from the repated manufacturers comprising Firmac UK, SPIRO Swiss, Hydro- power USA which are designed to meet and deliver high quality product at very fast rth the production eam of HLVEM comprises technically competent and qualified personnel with international experience being capable of producing high quality sheet ‘etal ducting of any sie and meeting industry standards and customer requirements “The unit is houred in a modem, ell ventilated shed and is capable of producing 15000 sf offinihed duct per day. ‘With the brie of above infrastructure plans and our vision we are commited to produce and deliver quality ouiputs besides sharing the advantages of efficiency, ‘economy. quality and sevice to our customers. ‘We are pleased to be associated with you in providing our services/products to meet your business requirements and continued business patronage with mutual support and grav, 7 LISTOFMACHINERIES: POO Ma rain Orcs fines Cr it PE EO CO NCI Dive ad Cie ies Cea ee eet Cpe eee er eae eee cea Ce eee eee ce ew ee ema Meee aed a eet at Horizon FMee rts Ucatr arid Rat oon eee eerie) eae er ronan ee ane ae econ) See ena ee neas So Zea. Pee Tally ns erie Seen ee eas ee eed er ae eee en a De ee ee en yt ee eee ey eee ee een es Withthe brief of above infresuciuto we are capable ee ee ere Pim Yc MARE Baez) icin fie eee ce aac eee es Soe ors erat oes Rak ey eee Ce ee Panna onan ioe Balko ccc eT CeCe e ee es? Cerra ncny Horizon TRADE LICENSE 4 BSRSS ip a ES 7 DEPARTMENT OF ECONOMIC DEVELOPMENT GOVERNMENT OF DUBAI Pee) Industrial License License Details / Uaij2 dest canes No, sossez Laks ‘CompanyName Geb BYR inate wae HORIZON VENTALTION EQUIPMENT MANUFATURINGL LC 39 Aeetoteeieta sant Fede Nave NORZEN VENTILATION EGUPHENT MANUFACTURING LLC Lopal Type Lied Uabty Company.) Symetie cls eames [esi oate vous eeongs sve ae canine? sen DIB DUNS ON. = 8 MalnLeanee to seam pha RepiterNo. sosose7 5k deagly 9 nena ate Licence Members / Uai.9 UUs Manager =| United Arab Emirates 186423 MOHAMMAD AHMAD RAMADHAN JUMA ane sen sae diy! Manager Unites Arab Emirates / 198379 ‘Shohab ahmed ramadan ma fsa aan fon aes Lcense Aetivitioe / %J5a1 ak a uaas \entaton Equpmer Wantecuero a sy ll ee ‘Adéress/ ous ‘Totphone ersasoaoeza st POBox 20 se aoe Fax rv 00008 eat Pareto ° assy Wot No apna (ete sa) i 968-221 UA sh Esse ipl Remarks / iat Prone ono 1422 oct Ho. sssseos an ety wade omer: aaa (tpn dubsided gov.ne 21s) ay ak hh an ap AY th Sahay 8) (Goteoet elector docu isied whut sneire by the Doparnert of Eccnans Devecpmet. Te ety the oes ny st ‘nan tae 2 38 7 yal a_i ___la = DEPARTMENT OF ECONOMIC DEVELOPMENT GOVERNMENT OF DUBAI peeouns © Ak ears No, ‘saate aks fig sore ‘ono000 % | STE725| ‘oJ United Arab Emirates Gseyetn se ‘0000000 ato ‘214201 Une Arab Emirates poh he ped he pontoate — cabanes? 42 la ect No. asso an sey eet Owner ae (ops baie gov ae ol gy 9) anal, eg an ad HS) strove ceri docunant eed witout etre byte Ozparment af Econ Developm To ty ta hr dy ik ito nw diced ou. PREVIOUS PROJECT APPROVALS M/s. Poyry Energy, Dubai_ inet [SMTECAEM/MS/SRK/14773/201]|Conwact_[DMS 145141 ][Date: (Mat, Submittal Ref: [MTS-0044 substation: | Third Nad Al Shiba 6/ 88 Name of Material Source Sample [ApprevalCode 1.5.3,1.0.04~ [Pre Fabricated Gt Air Conditioning] Sheets: JSW- India. | cE Rev-08. Duets. Fabricator: M/s Horizon ~ UAE. Location for usage: Multiple location as per approved drawing. Material used for: Supply and Distribution of Conditioned Air. ment 1) Refer duct construction schedule, contractor is requested to provide 30 mm flange(Traverse Joint) for sizes 750mm and above for better construction. ‘AL DHEBAJEL [Approved es per sample submited. [Approved subject to full compliance with manufacuurers instructions ‘Approved subject to full compliance with comments. Resubmit for record = Representative sample to be prepared at ste for final approval [Comments as indicated in the material comments sheet. Not approved. Revise the submittal as per comments and resubmit for approval (Contracor’s responsibiltis for compliance with the requirements of the specication. “: VP-T.Proj / Ahmed Alallah /Syed Rafi _ 8 bb Rlolnle> a er Dusbo teary § Water huthonty in cet og. Ae 9801566, UAE, Te «STIARDNAAEA {NH ITED Mae Efe OF aa ‘eveidnregocoe | mode g20 ‘GOVERNMENT OF DUBAL MATERIAL SUBMITTAL COMMENTS SHEET. [Fromd Senior Manager-Trans Eng Civil & Electomechanical [To: | M/s. Poyry Energy, Dubai iRef.: [SMTEC&EM/MS/SRK/14775/201]| Contract (04-6095501 12isunj17 a [Mat, Submittal Ref_[ MTS-0042 O6/sunsi7_] substation: [Jumeirah South oe 07 /Jun/17_ Material Code: DMS-145151/ JUMSOUTH/ MS/ M/ 16/ 88 Rev: 0 ToSpec Ref Name of Material Source Sample [ApprovalCode 1.5.3.1.0.04-| Prefabricated GIAC Ducts Sheet -]SW— a cE Rev-08 Fabricator ~ M/s jorizon ~ UAE, Location for usage: Multiple location as per approved drawing. Material used for: Supply and Distribution of Conditioned Air. Comments: = 1) Refer duct construction schedule, contractor is requested to provide 30 mm flange(Traverse Joint) for sizes 750mm and above for better construction. ‘AL DHEBAIEI Reprod a pa cape said, Approved subject to full compliance with manufacturer’ s instructions Aoproved subject to fll eompbance with comments. Resobrit fr cd Repreercatve sample to be prepared at he for nal approval (Comments at indleated athe material comments shet. Not approved eve the sbtel s pe: comments and rexubm Tor approval Contraco spore for complance ot the regulrement of te specicion : VP-T.Proj / Amit Chauhan / Pathak 18 fale! Page 1 of | 2K Sata tectcny tate Atay esos dy oh Ae POBoe SE, Dual UAE Tet HBA RAAAKG | BEL 2PM aah dens@cens.goue | emseeogoray geo open Lp a 5 eine ENERGOPROJEKT fafieuerae oe | ENTEL Barr aaase764 4 APPROVED APPROVED WITH COMMENTS AS BELOW REJECTED SEE COMMENTS BELOW MATERIAL STATUS: by Co COMMENTS BY EPE / DEWA ‘Name of the material: GI Duct (90-2276) ‘Source : Mis. JSW - India, Supplier - M/s. Horizon Ventiation Equipment Manufacturing LLC, UAE Location of usage : Multiple location as per approved drawings. Material used for :Air conditioning ducts. ‘Approved Subject to full compliance with manufacturer's instructions, Contract No. Msb1v418/01026 DEWA MSCMS Code msDimsiMne/ies LAT Reference MTS/COMNAWI6/213, EPE Reference MTS/2004-oods/MSOMN6213 Revision 1 Date Received ‘August 6, 2016 NEW SUBMISSION REQUIRED Yes no ON BEHALF OF DEWA/EPE: MTS-MSDI-LAT-HVAC-0213 NAME : SIGN POSITION: Project Manager DATE: August 27, 2016 ef erctinp apm soe f PARE ENEESORROJEKT iwapeenec PENTEL oo Besos MATERIAL STATUS ‘APPROVED bal APPROVED WITH COMMENTS AS BELOW ta REJECTED SEE COWMENTS BELOW oO COMMENTS BY EPE /DEWA: ‘The proposed GI manufactured from Mis. Horizon Veniation Equipment Manufacturing - LLC - Dubot with GL ‘sheet manutacturer M/s. Nippon - Japan sre approved. Contract No. 7 PorsTes400075 & 8761600037 DEWAMSCMS Code: MBRSOLARMSAU/6"166 ABB Reference : P0376 M40007bMS-4AEP-0174 EPE Reference POPS7E1400076MERSOLARNETSIO“ Bote Reooivet dune 21, 2018 NEW SUBMISSION REQUIRED : ON BEHALF OF DEWA/EPE: NAME: POSITION. Project Manger sion LLORoDAg — ome + sme a6 OITA AK 5137216 - Al Hubtoor Polo Club Project Client Al Habtoor Group Contractor :PIC Submittal Reference 1: MS-PIC-134-MEP-Mech-004 Rev 01 Subject of Submittal : Material submittal for G.l. DUCTS No objection for the proposed {JINDAL} make for G sheet Contractor shall comply wih Atkins Engineer's review comments noted below, HS Honzon eapabutty not sufficient to cover all project requirements. contractor thall propose another Duct fatiicator to assocrate with MVS Honzon for Gl ducts tebsication tequrements + WiNfest certiicate for sheot/cous shall be submated prior to dispatct om the factory and vntnessed by Enginoer for approval + Gontracio: shall be demonstrated that the shee! thickness and Zinc coating thickness ax specified in DW1é standards according fo duct pressure rating. Page 4 To! ENERGOPROJEKT-EWTEL, ‘CONSULTING ENGINEERS Attention: 1... Andrews Project Manager CONTRACT: CNEV0389/2010 Becerra “alatin,Tesiing and Cofnilestoning Of Slate VAR Compinsalon PROJECT: Stations at Nahda (WHDA) and Car Complex (CAR) 400/132KV Substations oo 7 “Associated Worke na ot MATERIAL APPROVAL TRANSMITTAL SHEET Materiel Code Tspeeret. | Rov. ev 4 cist gr Vota i 0 | asin Saree ast KSAT or 1831006 Guay ame eatng shite 227 woe Heise eee ‘meni 77apem, 8 ate 19) Technical Submtat (test Report [2] Represontatve Sampies [2] Previous Approvat [3] Comptence of DEWA Spec moquireme! Co Heal, is | Wo. of Copiez : Reriarkae itako that ie Wark Wil BS Gone ee pe selicpn aa ‘that this approval does not rolieve us of out unr mivtokes, omicsh icloncies In face Wnsteiclion, and we understand | nsibilties for any discrepancies, error, ‘Biecplines LJ CraiSructral () Aehacual Hechoniat (2) punting Gy Vendors Technka! erature Ml Complionce Satement Clcamparson snes (Previous Test Resuits Ban 7 ofthe Rested Specs 8 ‘thes Contact Documents i Samples US af Projects Done (secure P SVC-008 [Package Code — Tod ie | cis Dees Budi Gait tach Tine FGimeulant | Trofesional Arabian Consulang Engiveas | {PACES Contractor | | [Contactor | Salt Valley General Contrueting = Geese ee [Deserpiin : Teebueal OUP) J Single Tectia WOOT Re “Application Losin] Sub- Struct = eae | “EBay Ret Misia) Sul Comply wh Sp [Deaitirahenatve ‘oved with Comments 1 ED Approves few ne | ED Rejected tau. xt | i a | Neto: (ry py) oy PR oMrcm IS yecarmo: | (moe Pecan Sie SRR RAE Re atv oo | | wWeases frac Te Gromnm, /sr ans Prminayie OF | | Dura, Fee Pree Pt Ae Petre | A ilper Cte © Tene | bee Pr Tie Pteee PTE ems | Dee = enue | { Swere Bia Recess. Sewee Mic Mecins al of mata deveope alte aed ds at et penn to pct des come cotatl eis eld Be gly at ie waben ih Ces ae pot — Lanpuem: Saetincer Mer Comme fem, Eleomene- ND Comruce® As oer Bam Prctmn Maweinery OTe teny s Stes Wer Sverre Docues ty Wrereve Rem island “Abu = TREE | oT pocuwenrecct | pxt | MBUB costey 18 Description oftfatofnis’ SHEET WETAL DUCT & ACCEBSORIES ae as == 7} allocation of Use External 7 Sapa MATERIA, AS PER SPECIFICATION: si B. Description Manufacturer sorintion: Wenufasborer \ 1 fat________- soe. = sue Linda - nas oe core: Fras, Yin oan usta ic UGC A __ Js. atrieg leaned ‘Bs Sous Jooreman sme Eectenomare | Deatpaer he Ot a‘ pre [oer lus oan saeh tome te be — rete aioome bs O70 See senna, Tr ee ln ls, tceaa Lm abt ad : hi to [country of erigin: JAderoae: Ei eusisssene __ — sent Ne hanpesnye ke foe ORY BR ‘Form # DD0-MSUB, Rev 1, Nove iets: ie YousutAKnaja 7 es, ie LAGAS A | Sino: pS chteets & Enghwonneg Cocsistants Peace mane Proposed B+G+2 Commercial / Residential Building on Plot No. 128-4402 at AkMuteena, Dut MATERIAL APPROVAL SUBMITTAL Reloronce, Mech /S0e. 3 — 1.0MSACO REV. 1 tbat, UAE, Davo: 07/2014 Hotel Bescripbon: GI Sheet. Supplier Deis = e "Name: is Hoon Vania Euan msiwactuing LLC. ~~ ‘County & Cy :UAE & DUBAI ‘Address: PO. BOX 262760 Exar Cavan Specconn Seton Poss tench ne mie 4 Atahoo moe spre tv by tn Cec ans te cwe Bao 4 Sugents mene omter obo mled ent oho Date 19/7 fzel Be manufacturing of dived shat he ay pan sei dvs, [2 Teiaty Seating Mativlal shat be 95 Specflch A ema omvibinyl, © Fiaihes * Bach shot be ss fer SAcatiohin oh ePreval poles ) Dua Siar shee es Pre effort shu dite ee ae es pee SS )e 0 eee pernomto — Chrevovtasnonty reves so RESUINT SAUPLLS AXDORADEMIONL —_KOT APMIGWED wih DATA OVENED (ben Arcade) Forthe Fmployer | Services 4071 apse: ON i EuidingContacg 4.2) eo Plot No: £99-547 | Focatom Jebel All Tne. Arce | Engineer * Nation: Attn, aain eo contractor: Mzoon Building Contracting Co. “Department Same As Specified | Alternative Proposed Material cS Horizen venp badion Eup tend Paar ety lonare take degun (2 tats > 7 Cd | Reason For Ak Orieinnar Said i AEE 7 none Sooo Oe” Date 0/0" | Siznauce- Cetmyoly ant [ Received By NEB ‘Signature: Dae 7 Below portion for NEB use. ‘only’ D Approved {Approved as noted 0 Rejected O Re submited QE BOA. ctud Fi Ship will ld Bhuasd Bcd Bhat. Co is: © : ae 4 9 Te Comty ltcth HVA Ste cata gned by: . £aFtyR ___Signatwet Dito: ve Beng | Gients x ZS Comments : —— za Signed by = Signature: Date: [sHonded over to Mzcon: Signature : Date: PEFAAT MUSTAIA 7 ie ‘Consulting Arebiteet Material Submittal | eS_| Contractor :8E1.HASA ENGINEERING & CONTRACTING COMPANY (LLG) ‘Sul-Gontractar : AR ENGINEERING LLC Project HES.CON.BLDG (061G+MEZZ +3TYP.FLOORE+ROOF) Project :276/2011 PLOTNO.1330268 , HOR ALANZ , DUBAI ‘Date Submiital Prepared 111,08.11 ‘Subsaivtal Rel. ARUIPITIOACTMNIOS Revo 0 Materia Description + GI SHEETS Waoulectrer HADEED ‘Soppler HVEW (ARS group] ‘Adder :DUBAt Production Pelod Wooks C[ gecmr avery x Vier wis am [esteeey ies wo] Detlery Method 1 por Ceruutad Speck h Agreed by ARJ ww ave baby Suiting he HADEED mabe ‘Contractors Comments: Tiavhnapi Elona eae gia Eq omwnes OD tories 1 om omerenaenestomn: | Cat re Nn fe LL. “Engineers Commoanie RA 88-98 PRESOFN [ee Eee PATEENS rojrat CBP OEIRE ARI Fomarwr Pot SPEER, BEDE. Bier 7 bal Hind ROTEAT | | Materia! Submittal _ riphato oF Submits: BRJENGIEFRING SERVICES Patrte Bion C oe ay ‘Matdris] Detail 1 ] ltiem Description GIBUSTWORK pe Reternine 4880, Riee | = Cone es | Glu etree trates Boas exe ge rene esses arnt way eran nae pon noe hac HODES EF ROIS [etcetera er eoutomacstanmo Ee Dove; [ [8 ORO [Goareetor Sioa {aE No. 6070248 R11 PREVIOUS PROJECT REFERENCE Horizon LIST OF PROJECTS EXECUTED MBRAMC 2 NOS OF 132/11KV [ENERGOPROJEKT-ENTEL CONSULTING | SUPPLY OF G1. RECTANGULAR DUCTS SUBSTATION @ DUBAL ENGINEERS, G+ROOF, IMMEGRATION [ENGINEERING CONSORTIUM DETENTION BUILDING @ AL, ROWAIVAH THIRD. ‘CONSULTANT ENGINEERS, ‘SUPPLY OF GL RECTANGULAR DUCTS G+1 DM BRANCH OFFICE PALACE ENGINEERING CONSULTANT SUPPLY OF G1, RECTANGULAR DUCTS VILLA DEVELOPMENT FOR TECOM. KHATIB& ALAMI SUPPLY OF G1. RECTANGULAR DUCTS ‘AL HABTOOR POLO CLUB [ATKINS ENGINEERING CONSULTANTS | SUPPLY OF GI, RECTANGULAR DUCTS (CAPEX AT MALL OF THE EMIRATES DSAARCHITECTS INTERNATIONAL —_| SUPPLY OF Gi. RECTANGULAR DUCTS CONSTRUCTION OF 1050 Nox. ‘TOWNHOUSES (320 Nos. ZAHRA ‘ARIF & BINTOAK CONSULTING ARCHITECTS ‘SUPPLY OF G1. RECTANGULAR DUCTS ‘TOWNHOUSES FLUS & 730 Nos. HAYAT ‘AND ENGINEERS ‘TOWNHOUSES, CONSTRUCTION OF ADNOCSERVICES | ALTORATH PROJECT MANAGEMENT —_| SUPPLY OF G1. RECTANGULAR DUCTS ‘STATION AT MADINAT AL MAFRAQ ‘CONSULTANT. CONSTRUCTION OF ADNOCSERVICES STATION AT OLD BANIVAS. ALTORATH PROJECT MANAGEMENT (CONSULTANT. SUPPLY OF G.l RECTANGULAR DUCTS CONSTRUCTION OF 3 ADNOC SERVICES STATION AT UAQ 8 SHARIA ApNoc SUPPLY OF Gi. RECTANGULAR DUCTS 'B+G#1 COMMERCIAL BUILDING AT AL. ‘BEL YOAHAH ARCHITECTURAL. SUPPLY OF Gi. RECTANGULAR DUCTS WARQAA [ENG.CONSULTANTS ‘BrGvSeR COMMERCIAL & RESIDENTIAL BUILDING AT ART CONSULTANTS SUPPLY OF GL. RECTANGULAR DUCTS MUHAISNAK [ALRAYVAN COMPLEX, AL NADHA, Bell ARCHITECTS MIDDLE EAST SUPPLY OF G1. RECTANGULAR DUCTS SHARJAR 2B+G+6+R RESIDENTIAL BUILDING AT. AL WARQAA FIRST. AL AJMI ENGINEERING CONSULTANT SUPPLY OF Gi. RECTANGULAR DUCTS [MBR SOLAR 400/132 Kv SUBSTATION [ENERGOPROJEKT-ENTEL CONSULTING ENGINEERS ‘SUPPLY OF G1, RECTANGULAR DUCTS 18+G¢7 RESIDENTIAL BUILDING @ AL ARIF & BINTOAK CONSULTING ARCHITECTS SUPPLY OF Gi RECTANGULAR DUCTS RAFEA AND ENGINEERS "avCs7 FARE ROOP TOP ROOF ORTHOPEDIC SPECIALTY HOSPITAL @ (OV TECH CONSULTING ENGINEERS | SUPPLY OF G1. RECTANGULAR DUCTS HEALTH CARE CITY. [ADNOC DISTRIBUTION @ MOTOR ADNoc SUPPLY OF G1. RECTANGULAR DUCTS WORLD & NEW MADINAT ZAYED Horizon LIST OF PROJECTS EXECUTED G+4 LABOUR ACCOMODATION @ ‘AL HASHEMI PLANERS, ARCHITECTS, SUPPLY OF GI. RECTANGULAR DUCTS JEBELALL ENGINBERS/GEC CONSULTANTS. 2B+G+2 COMMERCIAL BUILDING @ BEL YOAHAH ARCHITECTURAL ‘SUPPLY OF Gi. RECTANGULAR DUCTS ‘UMM AL SARAF ENG.CONSULTANTS, BsGe1 COMMERCIAL BUILDING @ | ALSARAYAENGINEERING CONSULTANTS | SUPPLY OF GI. RECTANGULAR DUCTS ‘UMM AL SHEIF BeGe9 STOREY & HEALTH CLUB MZOUN MECHANICAL SERVICES SUPPLY OF G1. RECTANGULAR DUCTS RESIDENTIAL BUILDING @ DSO 1B+G+6+R RESIDENTIAL BUILDING @ ‘AL AJMI ENGINEERING CONSULTANTS ‘SUPPLY OF Gl. RECTANGULAR DUCTS AL WARQA'A FIRST. Get CAMEL HOSPITAL, Meccon ‘SUPPLY OF G1, RECTANGULAR DUCTS CONSTRUCTION OF NEW VVIPLOUNGE | | DARALHANDASAHNAZHTALEB& | SUPPLY OF G1. RECTANGULAR DUCTS ‘AT AL BATEEN EXECUTIVE AIRPORT. ‘PARTNERS SARL BeGe3 FLR RESI, COMPLEX AT. NATIONAL ENGINEERING BUREAU | SUPPLY OF G1. RECTANGULAR DUCTS KARAMA ‘CONSTRUCTION OF MAVER AL [MEHYAN SERVICE STATION FOR HC ARCHITECTS & ENGINEERS SUPPLY OF G. RECTANGULAR DUCTS ADNOCIN SHARJAH KHALIFA CITY ADNOC FILLING KEYSTONE AECHITECTURE & ENGINEERING SUPPLY OF GJ. RECTANGULAR DUCTS STATION AT ABU DHABI CONSULTANT. FUN WORK @ YASMALL ARCHITECTURAL CONSULTING GROUP | SUPPLY OF Gi. RECTANGULAR DUCTS GEANT HYPERMARKETS AT YASMALL, [BA & ASSOCIATE ENGINEERS. SUPPLY OF G.L RECTANGULAR DUCTS ‘ABU DEABL ASTER HOSPITAL @ ALRAFA | ARIF & BINTOAK CONSULTING ARCHITECTS | SUPPLY OFG. RECTANGULAR DUCTS ‘AND ENGINEERS. ‘VEHICLE BODY & PAINT WORKSHOP | ARIF & BINTOAK CONSULTING ARCHITECTS | SUPPLY OF GiL RECTANGULAR DUCTS [AND ENGINEERS, EXTENSION OF ACCIDENT.EMERGENCY ‘AL HASHEMI ‘& TRAUMA CENTRE -RASHID PLANERS ARCHITECTS ENGINEERS GREEN SUPPLY OF G1. RECTANGULAR DUCTS HOSPITAL ‘CONCEPT ENGENEBRING CONSULTANTS, "Yasar SATELLITE GROUND STATION | ALTURATHENGIEERING CONSULTANTS | spp op, RECTANGULARDUCTS YAHSAT SATELLITE GORUND STATION ‘ATABU DHABI ALTURATH ENGINEERING CONSULTANTS SUPPLY OF GJ. RECTANGULAR DUCTS MUDON COMMUNITY CENTER MBA ENGINEERING CONSULTANCY SUPPLY OF Gi RECTANGULAR DUCTS Horizon BsG+2P+27+RENI SHAMS TOWER @ LIST OF PROJECTS EXECUTED ‘AL SUWEIDI ENGINEERING CONSULTANTS. ‘SUPPLY OF G1. RECTANGULAR DUCTS ‘ABU DHABI BUREAU LLC G+0 RESIDENTIAL & COMMERCIAL ‘SKY LINE CONSULTING ENGINEERS | SUPPLY OF Gi, RECTANGULAR DUCTS BUILDING @ DSO [RELOCATION OF SAMACOM TELEPORT. ‘SHANKLAND COX CONSULTANTS SUPPLY OF G1. RECTANGULAR DUCTS STATION(DU) @ AL QUDRA. B+G+3P+16TYPICAL+ROOF,ENI | ALSUWEIDIENGINEERING CONSULTANTS, Tee ees SUPPLY OF G1, RECTANGULAR DUCTS ‘STATIC VAR COMPENSATION STATIONS @ NHDA& CARX 400/132 KV | BNERGOPROJEKT-ENTEL CONSULTING | SUPPLY OF G1. RECTANGULAR DUCTS SUBSTATIONS ENGINEERS “SHARJAH GRAND HOTEL [REFURBISHMENT JOB @ SHARJAH AVENUE ENGINEERING CONSULTANTS | SUPPLY OF GI, RECTANGULAR DUCTS ‘33/AIRV SUBSTATIONS IN RASAL 'KHAIMAH & DHAID AREA & 33/11kV SUBSTATIONS IN EAST & WEST AREA Mott MacDonald SUPPLY OF GI. RECTANGULAR DUCTS. TCAFE ( GRAND CAFE , PROMENADE ‘CAFE & KIOSK RESTAURENT ) @ DUBAL MALL. ‘AR ENGINEERING SERVICES ‘SUPPLY OF G1. RECTANGULAR DUCTS 'B+G+1 PRIMARYKINDERGATEN ‘SCHOOL @ SPORTS CITY ‘AL SARAYA ENGINEERING CONSULTANTS ‘SUPPLY OF G1. RECTANGULAR DUCTS EPC SUBSTATION JAMAHEER CONSTRUCTIONS LC. ‘SUPPLY OF G1 RECTANGULAR DUCTS UNIVERSITY OF SHARJAH ~ DENTAL, ‘BLOCK (GECO ELECTRICAL AND MECHANICAL ‘SUPPLY OF G1. RECTANGULAR DUCTS. ‘COMMERCIAL & RESIDENTIAL BUILDING (Hil SHEIKHA WADIMA ) 4B+GeM+20TYP.oReTRL¢TRZAT ABU DHABL HANNOVER CONSULTING ENGINEERS SUPPLY OF i. RECTANGULAR DUCTS ‘COMMERCIAL & RESIDENTIAL. BUILDING (HH SHEIK SULTHAN ) 4BsG+M+20TYP.+R+TRI+TR2 AT ABU HANNOVER CONSULTING ENGINEERS SUPPLY OF G1, RECTANGULAR DUCTS DHABI DUBAI MALL (GALLERIEVA OUTLET) AR] ENGINEERING SERVICES SUPPLY OF Gl. RECTANGULAR DUCTS MAKATEB BUILDING ATIMPZ | ARAB EXPERTS ENGINEERING CONSULTANT | SUPPLY OF GJ. RECTANGULAR DUCTS 1L0G0 ISLAND DAR CONSULTANTS SUPPLY OF Gi. RECTANGULAR DUCTS NOOR ISLAMIC BANK SHARJAH HAMILTON DESIGN INTERNATIONAL SUPPLY OF Gi. RECTANGULAR DUCTS NOOR ISLAMIC BANK SHEIKH ZAYED ROAD HAMILTON DESIGN INTERNATIONAL SUPPLY OF GI. RECTANGULAR DUCTS Horizon LIST OF PROJECTS EXECUTED AMON ARCHITECTURAL & ENGINEERING READY MED CONCRETE PLANT AT coer SUPPLY OF G1, RECTANGULAR DUCTS G+2 POLICE STATION AT AL QUSAIS AR) ENGINEERING SERVICES SUPPLY OF GL RECTANGULAR DUCTS DUBAI HEALTH CARE CENTRE HAMILTON DESIGN INTERNATIONAL | SUPPLY OF GL. RECTANGULAR DUCTS EAST HOTEL AT MALLOF THE NOR CONSULTANT SUPPLY OF Gi RECTANGULAR DUCTS EMIRATES CUSTOMS FACILITY AT CPS JEBEL ALI (QHC ARCHITECTS & ENGINEERING ‘SUPPLY OF GI. RECTANGULAR DUCTS ENOC FILLING STATION [BHLNS CONSULTANT, SUPPLY OF G1. RECTANGULAR DUCTS ZABEEL KITCHEN EXTENSION | KHANSHAHEBRUILDING SERVICE DIVISION. | SUPPLY OF GI. RECTANGULAR DUCTS 1B+1P4G+26 AR] TOWER AT DUEAT ATKINS / AL GURG SUPPLY OF GJ. RECTANGULAR DUCTS MARINA G22, 4 BULDING AT ALNADHA ALFAHIDIENGINEERING CONSULTANTS | SUPPLY OF GL RECTANGULAR DUCTS (G+4P+25) RESIDENTIAL TOWER (MZQUN MECHANICAL SERVICES LLC. | SUPPLY OF Gl RECTANGULAR DUCTS MINA AL ARAB AT RAK SHANKLAND COX SUPPLY OF G.L RECTANGULAR DUCTS (G+3 &Ge4 (31 BUILDING) AT ‘ACE INTERNATIONAL SUPPLY OF G1. RECTANGULAR DUCTS INTERNATIONAL CITY PACKAGE 7 [EMIRATES BANK (2B+G+24) DESIGN & ARCHITECTURE BUREAU (DAR) ‘SUPPLY OF G.L RECTANGULAR DUCTS ‘CONDOR BUILDING CONT. LLC / LAGAS ARCH. B+Gr3P+18 FAIRVEIW RESIDENCY @ SUPPLY OF G.L RECTANGULAR DUCTS BUSINESS BAY BB.AO6.052 Ca AMAYA TOWERS AT ABU DEABI [ARCHITECTURAL CONSULTING GROUP | SUPPLY OF GJ. RECTANGULAR DUCTS SEASONS COMMUNITY AUTUMN | DIMENSIONS ENGINEERING CONSULTANTS | SUPPLY OF G.L RECTANGULAR DUCTS (CLUSTER (28+G+4/G+2 & 28+G+4) STEP INTLTECHCONTRACTING SUPPLY OF Gi. RECTANGULAR DUCTS [NBW SBHA HEADQUATERS 4B+G+16 COMERCIAL/RESL BUILDING [NARESCO CONTRACTING SUPPLY OF G1. RECTANGULAR DUCTS ESIDANTAL BUILDINGS ON PLOT [NO:R-001,8-002.R-004,R-005, NATIONAL ENGINEERING BUREAU SUPPLY OF G1. RECTANGULAR DUCTS Horizon G+3 LABOUR/STAFF ACCOMMODATION BUILDING LIST OF PROJECTS EXECUTED [NATIONAL ENGINEERING BUREAU ‘SUPPLY OF Gi. RECTANGULAR DUCTS 'B+G#12 STOREY COMM, BUILDING AT ‘AL NADHA, DAR CONSULTANTS SUPPLY OF Gi. RECTANGULAR DUCTS BsG+8 @ TECOM [NARESCO CONTRACTING ‘SUPPLY OF GL RECTANGULAR DUCTS GrBes ALMINA JAMAHEER CONSTRUCTIONS LLC. SUPPLY OF GL RECTANGULAR DUCTS (CLUSTER M1 (38-639) [NATIONAL ENGINEERING BUREAU SUPPLY OF Gi, RECTANGULAR DUCTS '3B+G+33¢ROOF AL WALEED PARADISE ATILT ‘ADNAN SAPFARANI SUPPLY OF GI. RECTANGULAR DUCTS DANZAS WARE HOUSE AT JEBEL ALI JAMAHEER CONSTRUCTIONS LLC SUPPLY OF GI. RECTANGULAR DUCTS G+4 RESIDENTIAL TOWER ‘BULDING(LT) ALSABHA BLECTROMECHANICAL ‘SUPPLY OF G1 RECTANGULAR DUCTS G+8 DUBAIINVESTMENT PARK ‘AL FAHIDI ENGINEERING CONSULTANTS ‘SUPPLY OF G1. RECTANGULAR DUCTS G+B RESIDENTIAL BLD (GULF ENGINEERING SERVICES SUPPLY OF Gi. RECTANGULAR DUCTS ‘2B+G+12 BUILDING AT ALNADHA BELNS CONSULTANTS ‘SUPPLY OF Gi. RECTANGULAR DUCTS (GREEN COMMUNITY WEST VILLAS & BUILDINGS [ALPHANOOR FLECTROMECHANICAL WOKS SUPPLY OF Gi. RECTANGULAR DUCTS G+ RESLBLD AT DSO AR) ENGINEERING SERVICES SUPPLY OF G1 RECTANGULAR DUCTS G+4 ATALNADHA2 [NEW ARCH ENGINEERING CONSULTANTS SUPPLY OF G1, RECTANGULAR DUCTS (G+3 LABOUR ACCOMADATION [NATIONAL ENGINEERING BUREAU SUPPLY OF Gi. RECTANGULAR DUCTS +2 STOREY OFFICE BUILDING AT DSO CONDOR BUILDING CONTRACTING ART. & ‘CONSULTANTS ‘SUPPLY OF Gi. RECTANGULAR DUCTS NMC CENTRAL STORAGE FACILITY [NAGA ARCHITECTS DESIGNERS & PLANNERS. SUPPLY OF Gi. RECTANGULAR DUCTS ‘3B+G+MEZZ+3TYPICAL FLOORS+ROOP [ATHOR ALANZ [REFAAT MUSTAFA CONSULTING ARCHITECT SUPPLY OF Gi. RECTANGULAR DUCTS Horizon LIST OF PROJECTS EXECUTED 1B+G+P413 TYP. FLOORS + GYM + DYNAMIC ENGINEERING CONSULTANT SUPPLY OF G1. RECTANGULAR DUCTS ‘Sree oe racon mxpanson pnoecrat | coNDoRsUILING coNTRACTINGCO.LAc | SUPPLY OFGL RECTANGWLARDUGTS BA MARI S0Nos{G+1)CONMLRESIDENTIAL | CONDORBUILDINGcONTRACTINGCO Lc | SUPPLY OF GH RECTANGULAR DUCTS ‘eas Cr LABOUR ACCONMATATION as ENGINEERING SUPPLY OF GL RECTANGULAR DUCTS OCEANA A aL UMAR sanwan ecneeunc coupany | supevY oF RECTANGULAR DUCTS ARM Use S Nos ARIOTERNIKWTRENATIONAL CONSULTING | syppuy op G1 RECTANGULARDUCTS sescewsseioonsornicea | weo nrensxriona.consuitavrs — | surpuv oF Gx RecrANGULAR DUCTS SHOWOOM BUILDING TENT MAIS vouustanes Buunine seRnce DIsiOn | SUPPL OF GL RECTANGULARDUCTS INDUSTRIAL KITCHEN TTKAL F000 STUFF SurPLy orc. necraNcuLaR DUCTS maDINa MAL 084 ELECTROMECHANICALINSTALLATION | opm or, RECTANGULARDUCTS +1 (VILLA) @ ALBARSHA SOUTH ‘a cuRG consuutass surety orci, RecraNGuLaR DUCTS 2 Ge (6 VILLA) @ JUMEIRAM 390 ‘Al BAHA ENGINEERING CONSULTANTS SUPPLY OF G1. RECTANGULAR DUCTS +1 KINGS SCHOOL 2 UMM SEQUIM 38° DUBAI CONSULTANTS ‘SUPPLY OF G1 RECTANGULAR DUCTS

You might also like