You are on page 1of 5

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/306754090

WELL DRILLING, COMPLETION AND INTERVENTION OPERATIONS OF


OFFSHORE AND ONSHORE HIGH PRESSURE CONTROL SYSTEM DESIGN

Book · August 2016

CITATIONS READS

0 3,175

1 author:

Prakash Bahadur Thapa


Memorial University of Newfoundland
137 PUBLICATIONS   1,081 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Dropped Object Study View project

Oil Gas Offshore Safety Case (Risk Assessment) View project

All content following this page was uploaded by Prakash Bahadur Thapa on 26 August 2016.

The user has requested enhancement of the downloaded file.


WELL DRILLING, COMPLETION AND INTERVENTION
OPERATIONS OF OFFSHORE AND ONSHORE HIGH
PRESSURE CONTROL SYSTEM DESIGN

Oil Gas Industry High pressure Control


operations Book

Author: -
Prakash Bahadur Thapa
Memorial University
St. Johns Newfoundland Canada
Pressure Control Manual For Drilling, Completion And Well Intervention Operations

Table of Contents

1 Introduction
1.1 Scope
1.2 Distribution, Intended Use And Regulatory Considerations
1.3 Requirement Statements
1.4 Definitions
1.5 Abbreviations
1.6 Cross-References Between Global Wells Manuals
1.7 Summary Of Main Changes
2 Subsurface Documents
3 Shall[Wells] Statements Summary
4 Organization Of Well Control Operations
4.1 Personnel Responsibilities
4.2 Well Control Training And Assessment
4.3 Well Control Drills
4.4 Well Control Readiness Self-Assessment And Audits
4.5 Well Planning For Well Control
5 Well Control Principles And Procedures
5.1 Formation Pressure
5.2 Formation Strength
5.3 Barriers
5.4 Primary Well Control
5.5 Secondary Well Control
5.6 Tertiary Control
6 Generic Well Control Equipment
6.1 Equipment Standards
6.2 Industry Standards
6.3 Maintenance, Inspection And Certification
6.4 General Requirements
6.5 Blind Shear Ram Requirements
Pressure Control Manual For Drilling, Completion And Well Intervention Operations

6.6 Pipe Shearing And Sealing


6.7 Diverter Equipment
6.8 The Well Kill System
6.9 Mud Gas Separator
6.10 Pressure Test Acceptance Criteria
6.11 Maintenance And Inspection Of Well Control Equipment
7 Surface Well Control Equipment
7.1 Classification Of Surface Bop Well Control Equipment
7.2 Choke Manifold And Kill Line Manifold
7.3 Control System Requirements For Surface Bop Stacks
7.4 Tests For Surface Wellheads And Bop Equipment
8 Subsea Well Control Equipment
8.1 Basic Components Of The Subsea System
8.2 Subsea Bop Stack-Up
8.3 Subsea Bop System Components
8.4 Integrated C&K Manifold
8.5 Operating And Control Systems For Subsea Bops
8.6 Testing Subsea Wellheads And Bop Equipment
8.7 Operations Related To Subsea Bop Systems
8.8 Subsea Well Control
9 Completion Well Intervention Operations
9.1 Running A Completion
9.2 Cemented Completions
9.3 Wireline Operations
9.4 Subsea And Well Intervention Systems
9.5 Coiled Tubing Intervention
9.6 Snubbing/Hydraulic Workover Units
9.7 Minimum Cwi Surface Stack Rig-Up Requirements
9.8 Well Testing
9.9 Cwi Well Control Equipment Test Requirement Overview
10 Special Topics
Pressure Control Manual For Drilling, Completion And Well Intervention Operations

10.1 Hydrogen Sulfide (H2s)


10.2 Advanced Well Control
10.3 Hpht Well Control
10.4 Managed Pressure Drilling
10.5 Dynamic Annular Pressure Control
10.6 Coring
10.7 Seabed Shut-In Device
11 Well Control Contingency Plan
11.1 Introduction
11.2 Content And Structure
11.3 Well Control Contingency Planning
11.4 Well Control Contingency Plan Response
11.5 Cap And Contain Plan Error! Bookmark not defined.
11.6 Well Control Contingency Plan Assurance

View publication stats

You might also like