CERTIFICATE

Certificate of Acceptance Page


1(1)

Equipment:
Contract number:

Customer: Seller:
Avure Technologies Inc.
1830 Airport Exchange Boulevard
Erlanger, KY 41018

Customer’s PO#: Seller’s PJ#:

The undersigning Parties hereby agree that the equipment as above, supplied by Avure
Technologies Inc. under contract number referenced above, is successfully commissioned and has
passed all inspections and tests required to the specifications and the contract.

Site Acceptance Test (SAT) was performed successfully and acceptance or alternative cycles were
imparted to a third party nor be used for any unauthorized

demonstrated and performed according the system specification.


This document must not be copied without our written
permission, and the contents thereof must not be

The operators and maintenance personnel have been trained as per delivered manuals covering the
purpose. Contravention will be prosecuted.

equipment.

The equipment is ready for operation and the warranty period will start from the date below.
The buyer understands that the warranty will be null and void if maintenance procedures are not
Avure Technologies, Inc.

followed according the Avure maintenance manuals and as stated in the contract.

The buyer hereby authorizes final payments/lease payments to Avure Technologies Inc.

Date:

Customer representative: Avure representative:


2017-04-10
production 2017-03-23

Comments:
AT01093/001 Released for Production
AT01093/001 Released 2017-03-23