FIELD SURVEY

Topographic Geological - geotechnical Hydrological Environmental

Basic Studies

Topographic
] Geological-Geotechnical Hydrological Environmental Energetic

Arrangement of alternative structures

Design of Civil Works and Electromechanical equipment

Design of Civil Works

Dam Water intake Load chamber Powerhouse

Spillway Channel/tunnel pipeline Penstock

Determine of Net Head and installed Power

Design of Electromechanical Equipment

Mechanical equipment Electrical equipment and installations

Design final arrangement

Construction Maintenance and Cost


planning and Environment studies
operation
Assemble

Final Evaluation of the project