You are on page 1of 38
ARAHAN TEKNIK (JALAN) 6/85 (PINDAAN 1/88) JABATAN KERJA RAYA GUIDELINES FOR PRESENTATION OF ENGINEERING DRAWINGS CAWANGAN JALAN IBU PEJABAT J.K.R., JALAN SULTAN SALAHUDDIN, 50582 KUALA LUMPUR. HARGA: RM 8.00 PREFACE, ‘This is the first revision of Arahan Teknik (Jalan) 6/85 on ‘Guidelines for Presentation of Engineering Drawings’. Although it is basically similar in essence and format to the one published in 1985, various modifications have been made to suit current JKR requirements. ‘These guidelines should be followed for the presentation of engineering drawings for all road projects under Cawangan Jalan, Ibu Pejabat J.K.R. ‘This Arahan Teknik will continue to be updated from time to time and in this respect, any feedback regarding these guidelines will be most welcome. All comments should be sent to Cawangan Jalan, Ibu Pejabat JKR, Malaysia. INTRODUCTION DRAWING REQUIREMENT SEQUENCE OF DRAWINGS SCALES OF DRAWINGS SEQUENCE AND SCALES OF DRAWING CONTENTS OF DRAWINGS 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 Cover or Title Page Drawing Index Key Plan Location Plan Abbreviation, Symbol and Legend Plan Elements of Curve Plan Superelevation Detail Plan Typical Road Cross section and Pavement Details Plan Alignment Control Plan Plan and Longitudinal Profile Plan Cross Section Plan Junction Detail Plans Road Marking Plans (iy PAGE Fr ee wo ea 7 6.14 6.15 6.16 6.17 6.18 Traffic, Guide and Temporary Sign Plans Drainage Plans Structure Plan Relocation of Services Plans Miscellaneous Plans DRAWING NUMBERING SYSTEM (ia) 10 10 10 14 14 14 INTRODUCTION The following guidelines have been prepared in order to standardise the presentation of engineering design drawings for road projects undertaken by JKR. The objectives of setting these guidelines are :- (a) to maintain a consistent standard in the production of engineering drawings that will clearly and concisely describe the works to be carried out; (b) to simplify the draughting process, the checking of drawings and where possible reduce the draughting requirements without detracting from the completeness of the works; (c) to produce drawings that can be readily modified with a minimum of redrafting to provide complete “as constructed" records for the project. These guidelines have been compiled by incorporating the good features of design drawings prepared by JKR and those submitted by Consultants. DRAWINGS REQUIREMENT All drawings (master tracings) are to be Al size, 594mm, by 841mm with a 10mm, 12mm and 21mm border, The title block as shown in Model Drawings No.1A should be used for all drawings. No deviation from this is allowed. General notes and legends are to be located on the right hand side of the title block. Drawings should be arranged so that the Northing Arrow is at the top right hand corner of the drawings. The Northing Arrow to be used is as shown in Model Drawing No, 1A. No other type of Northing Arrow is allowed. All drawings submitted (including draft copies) must have a Professional Engineer's chop and signature of at least a director of the consulting engineer's firm. SEQUENCE OF DRAWINGS Engineering data should be prepared in a logical method starting from general information and scope of work to increasingly specific details or items and method of work. ‘The recommended sequence for the Drawings is set out in Section 5. SCALES OF DRAWING The scales of drawings should be selected to clearly illustrate the information that is to be relayed. Generally, to show more details, larger scale of drawing and greater number of drawings are required. However, the smaller the scale, the more limited the designer is in relaying the complete information on one drawing. Accordingly, informations may have to be disaggregated so that one drawing may be limited to one subject at a time. All scales are to be in metric system except for Land Acquisiton Plans which have to be in accordance to the respective Land Office's requirement, SEQUENCE AND SCALES OF DRAWINGS The ' following illustrates the sequence of Tender Drawings and scales that are to be used in a typical road project:- DRAWING TITLE (a) cover or title page not applicable (b) drawing index not applicable (c) key plan 122,000,000 to 1:3,000,000 (d) location plan 1:25,000 to 1:250,000 (e) abbreviation, symbol and legend pian not applicable (£) elements of curve plan not applicable (g) superelevation details plan not applicable (h) typical road cross sections and pavement details plan suitable scale (i) alignment control plan 133,000 to 1:6,000 (3) plan and longitudinal horizontal 1:1,000 profile plans vertical 1:100 (k) cross section plans 13100 or 1:200 (recommended } (1) junction details plans 12250 or 1:500 ({m) road marking plans suitable scale (n) traffic, guide and and temporary sign plans suitable scale 5.2 6.2 6.3 (0) drainage plans suitable scale (p) structures plans stated in Section 6.16 (q) relocation of services suitable scale plans (r) miscellaneous plans suitable scale Land Acquisition plans will not form part of the Tender Drawings but have to be prepared for the purposes of land Acquisition, The scale will be as that required by the Land Office, usually 1 inch to 4 chains or 8 chains. The details are given in JKR publication "GARIS PANDUAN UNTUK PENYEDIAAN PELAN PENGAMBILAN BALIK TANAH BAGI PROJEK JALAN PERSEKUTUAN - ARAHAN TEKNIK (JALAN) 7/85", CONTENTS OF DRAWINGS Cover or Title Page The cover or title page shall follow Model Drawing No. 2A, Drawing Index This drawing lists all the titles and number of each drawing within the contract set. Please see Model Drawing No. 3A for guidance. A Drawing Numbering System has been drawn up and all drawings must follow this system. For all projects, whether designed Departmentally or by Consultants, the project number must be obtained from the Documentation Unit. Please refer to Section 7 for full explanation of the system. Key Plan This drawing should indicate :- (a) project location with respect to other states in the country; (b) state boundaries; {c) name of states and main towns where the project is located; (4) all the major Federal Routes; (e) northing arrow; (£) suitable scales ~ 1:2,000,000 to 1:3,000,000 The key plan can be combined with the location plan. Location Plan This drawing shows:- (a) specific location of the project with respect to the surrounding areas, limit of project and kilometre post. (b) the proposed alignment; ({c) other projects in the vicinity if any; (a) local towns, villages, rivers, reservoirs, roads, railway tracks and other physical features etc; (e) boxes encompassing a particular stretch of alignment, details of which are shown in the Plan ‘and Profile plans whose reference numbers are indicated next to the boxes; (£) trigonometrical stations with heights; (g) route number; (h) northing arrow; (4) suitable scales - 1:25,000 tO 1:250,000. Please see Model Drawing No.4 for guidance. Abbreviation, Symbol and Legend Pla: This drawing shall contain :- (a) abbreviations, symbols and legends and their corresponding full words, details and representations. The abbreviations, symbols and legends are standardised and should not be changed. Please see Model Drawing No.5A for guidance. 6.6 6.7 Elements of Curve Plan This plan shall indicated the following : (a) typical horizontal curves with or without transition; (b) typical vertical curve - parabolic curve; (c) clothoid formulae or other formulae used and their notations. Please see Model Drawing No. 6A for guidance. Superelevation Details Plan This plan shall contain the following :- (a) superelevation for curves with or without transition; (b) superelevation for the single carriageway and where applicable, dual carriageway too; (c) typical shoulder treatment on superelevation. Please see Model Drawing No.7A for guidance. Typical Road Cross Section and Pavement Details Plan This drawing shall indicate the following (a) typical road cross section in embankment and cutting (for both flat and rolling terrain where applicable) showing width of carriageway, shoulders, camber, drainage features etcs (b) superelevated typical cross sections where applicable; (c) typical cross sections for urban and rural carriageways with drainage details and access road, if applicable; (a) typical section for ground treatment (where applicable); (e) section details of pavement including details for the construction of new pavement over the existing pavement (where applicable); 6.9 (£) pavement design details such as design period, cummulative total equivalent standard axles, base year, and design subgrade CBR; Please see Model Drawing No.8A for guidance, Alignment Control Plan This drawing is to indicate the bearings and distances of the various Intersection Points (I.P.'s) together with the details of the horizontal curves and I.P. points. The details shall include the following :- (a) points of limit of project and horizontal alignment indicated by all the 1.P. points; (b) co-ordinates of all the I.P. points including the starting and finishing points; : (c) distances and bearings between all I.P. points; (a) horizontal curve data (as shown) for all 1.P. points; (e) reference mark information for all 1.P. points; (£) locations and chainages of all sv and 1S points; (g) location and chainages of all sc and CS points; (h) temporary bench marks with their levels; (1) all relevant survey Department's bench marks with their levels; (3) all relevant references to boundary stone in setting out the first intersection point shall be indicated; (k) northing arrow; (1) suitable scales - 1:3,000 to 1:6,000. More than one section of the horizontal alignment can be shown on the same plan using separator lines but the northing arrow should be indicated for each section. Please see Model Drawing No. 9A for guidance. 6.10 6.10.1 Plan and Longitudinal Profile Plan Plan Profile The details shall include the following :- (a) (b) (ce) (a) (e) (£) (g) qh) qa) qg) (s) q) (m) (ny (o) (p) horizontal alignment of centreline together with the limits of carriageway and shoulder; extend of R.0.W. to be acquired; running chainages along centreline; extend of cut and £il1 areas and carriageways in distinct shades; location of any proposed culverts and its details (including catchment and discharge figures) and any proposed stream deviation; location of all structures such as bridges and box culverts and their levels; locations of boreholes, temporary bench marks and bench marks and their levels; direction of flow of all proposed side drains and their levels; physical features such as existing roads, paths, tracks, public utilities etc. and contour lines; vegetation of the area passed through, such as rubber estate, padi fields, swamps etc.; existing buildings, property lines and types of buildings; match lines; existing stream, rivers (with names), culverts, sumps, side drains etc., their flow directions and levels and bridges and other structures; lot numbers and boundaries the alignment passes through; northing arrow; scale - 1:1,000. 6.10.2 6.11 Longitudinal Profile The presentation shall be on graphical format and shall include the following details:- (a) xunning chainages as per the horizontal alignment; (b) existing ground and proposed finished levels; (c) profile of existing ground and the proposed vertical alignment with the gradients; (a) details of vertical intersection points, including the chainage and data on the vertical curve. Locations of the BVC and EVC are to be indicated too; (e) locations of all proposed culverts, sidedrains (with flow directions), guardrails and structures; (£) above the finished levels, details of the superelevation and the horizontal alignment along a linear scale is to be provided; (g) scale - 1:100 Please see Model Drawing No. 10A for guidance. Cross Section Plan This plan shall show the cross sections of the proposed road at various chainages along the horizontal alignment, The details shall include:- (a) the existing ground's sectional profile; (b) the proposed finished cross section indicating the extent and shape of cut and fill required; (c) the proposed finished road level at the centreline; (a) the cross fall or superelevation of the carriageway; (e) any other details deemed useful for clarity; (£) suitable scales - 1:100 or 1:200 (recommended). Plans from computer printouts can be used, but must be presented in Al size drawings. 6.12 6.12.1 6.12.2 6.13 Junction Details Plans Junction details shall include the following:~ (a) general layout plan showing details of carriageway widths, islands, limit of R.0.W., property lots, dwellings and its type, limit of project on minor roads etc. The shoulder should be shaded for better visual impact. (b) setting out plan with the sufficient details so as to enable the setting out of the junction; (c) drainage and kerb. details of the junction showing proposed type and position of drain and kerbs, culverts etc. Proposed superelevations of various pavement and longitudinal section can also be indicated; (a) xoad marking and traffic sign plan showing the type and positions of the proposed road markings, traffic signs and signals (if applicable). (e) suitable scales - 1:250 or 1:500. Please see Model Drawing No. 11A, 12A, 13A and 14A for guidance. Traffic signal details shall include the location of the traffic signal posts, the type of lantern and the proposed cycle times. Schematic plans showing the various phases should also be included. Road Marking Plan The plan shall show all details of the proposed lanes ana pavement markings for the centreline, edge line, continuity line, chevron, give way marking, stop line, pavement direction arrows etc. All dimensions and details shall follow those given in JKR publication "MANUAL ON TRAFFIC CONTROL DEVICES - ROAD MARKINGS - ARAHAN TEKNIK (JALAN) 2D/85", 6.14 6.15 6.16 6.16.1 Traffic, Guide and Temporary Sign Plans Adequate traffic, guide and temporary signs shall be proposed and shall follow those approved for use by the Department. The details are given in JKR publication “MANUAL ON TRAFFIC CONTROL DEVICES - STANDARD TRAFFIC SIGNS ~ ARAHAN TEKNIK (JALAN) 2A/85 AND 28/85", “MANUAL ON TRAFFIC CONTROL DEVICES - TEMPORARY SIGNS AND WORK ZONES CONTROL - ARAHAN TEKNIK (JALAN) 2C/85" AND “GUIDE sien, DESIGN AND APPLICATION - ARAHAN TEKNIK (JALAN) 28/87", Drainage Plans The drainage plans shall be sufficient enough to depict all detail pertaining to drainage matters and should include the following :- (a) details of interceptor drain, bench drain, roadside drain, shoulder drain, berm drain, toe drain, outfall drain, subsoil drain etc; (b) details of precast concrete slab, kerb, kerb inlet, catchpit, sump, stream deviation, bakau piling etc; (c) details of culverts (whether reinforced concrete pipe, corrugated metal pipe or box) with details of headwall and wingwalls. A culvert schedule with the relevant particulars should also be prepared. Please see Model Drawing No.15A for guidance. Structure Plans ‘ This drawing shall normally be applied to bridges with following requirements:- Bridge Structural Plans (a) The general arrangement and layout should include the following :- (4) Location plan indicating the specific lecation of the bridge project with the proposed alignment, local town, villages, rivers, roads, railway tracks and other physical features. This should include the latitude and longitude bearings (b) (ce) (a) and the northing arrow (scale 1:10,000). (44) Plan showing horizontal alignment of the centreline complete with limits of carriageway, oreholes locations, direction of flow, bench marks, physical features such as public utilities, slope’ protection, drainage behind abutment etc. Pile layout can also be included here. Longitudinal profile showing running chainage as per horizontal alignment, existing ground and the proposed levels, extent of cut and fill and limits of bridge construction. (iL) Detailed cross section showing arrangement of beams and girders in typical section and other deck details, (4v)_ Notes, legends etc., which should include the design criteria, relevant codes used and other useful information, The list of other related drawings should also be inserted. Soil Profile This should include the borehole details at various depths till end of boring. Other laboratory test results such as plasticity index, plastic Limit and liquid limit should be incorporated if available. This should include pile details and joints, The numbers and types of piles for abutment and piers and their capacities and estimated lengths should be tabulated. The notes should include the materials, type of piles, (e.g. frictional or end bearing), working loads, test loads and other relevant’ information. Abutment and Wingwall Details These should include typical cross section and elevation showing details for bearings and pile layout showing principal dimensions —and description of all structural component. The notes should normally include the concrete strength, cover etc. A. separate drawing showing reinforcement details shall be prepared with proper legends and notes. " (e) (f) (g) (nh) (a) ie) Similar requirements as for abutments, Beams These should include sectional, longitudinal and plan details indicating all dimensions and cable profiles. The reinforcement and end block details may be on the same or different drawings. The notes should include among other things the design criteria, ultimate bending = moment resistance and shear capacity, brief material specifications etc. Diaphragms These may be included in the drawings for beams or together with details of deck slab. Deck Slabs These should include plan and sectional details and reinforcement detail complete with relevant notes. Handrails/Parapet and Expansion Joints These should include plan, elevation and sectional details complete with relevant notes on material properties and installation requirements. Water Main Brackets And Other Miscellaneous Details Similar requirement as for item (1). i 6.16.2 6.16.3 Sequence and Scales for Bridge Structures The following illustrates the sequence of tender drawings and scales that are to be used for a typical bridge structure :~ DRAWING TITLE SCALE (a) general layout 1:50, 1:100, 12150, 12200 (b) soil profile suitable scale (c) pile details 1:5, 1:10, 1:20, 1:50 (d) abutment - concrete details 1:20, 1:25, 1:30, 1:40 abutment-reinforcement : details seeees Gitto cee. (e) pier-concrete details seeees ALtto veeee pier - reinforcement details . ditto . (£) beams and diaphragms 1:5, 1210, 1:20, 1:25 (g) deck slab details 1:20, 1:25, 1350 (h) handrails/parapet and expansion joints 1:2.5, 1:5, 1:20 (i) water main brackets etc, 1:1, 127.5, 1:25 Requirement for Dimension A typical requirement for dimension is shown belo (a) All dimensions shall be expressed in metres or millimetres. (b) Units abbreviation shall be 'm' for metre and 'mm' for millimetres. Abbreviation should always be given in description notes but not for normal dimensioning. (ce) Normal dimensions of more than one metre shall be written to three decimal places but with the decimal point omitted. ‘Thus, four metres three hundred and fifty millimetres shall be written as 4350. (d) Descriptive dimensions of more than one metre shall be written to three decimal places and unit 13 6.17 6.18 6.18.1 6.18.2 abbreviation 'm' included. Thus, for normal water level is written as such :- NWL 37,128m, (e) Dimensions expressed in millimetre shall be whole numbers, (£) Dimension shall be written to be read from the bottom or right handside of the drawing. Please see Model Drawing No. 16 for guidance. Relocation of Services Plans This plans shall show detail for the relocation of:- (a) water mains; (b) LLN posts and cables; (c) Telecom posts and cables. The drawings shall be in sufficient details to properly define the scope of work. They shall show the locations of the existing services and their proposed relocations. Miscellaneous Plan Miscellaneous plans are for those details not described above and may consist of the following :- (a) streetlighting details; (b) general subsoil profile. Please see Model Drawing No. 17A for guidance. The streetlight detail should include :~ (a) locations of all proposed lamp posts, crossings and feeders pillar boxes; (b) types of lanterns together with details of columns. mw DRAWING NUMBERING SYSTEM The system used is as follows :~ KPKR/J/R/ - - fa) (b) PES ei a 123 45 67 8 9 10 11 (4) KPKR stands for Ketua Pengarah Kerja Raya; (41) J stands for Jalan; (iii) R stands for Rekabentuk, 4B for rural roads by Unit Rekabentuk Jalan Luar Bandar, JP for bridges on Federal Routes and JN for bridges on state roads designed by Unit Jambatan. The first six spaces is to be filled by six digits. (1) The first two digits (1st and 2nd spaces) indicate the State Code which shall be the same as those used by the JKR Headquarters Computer Centre. They are as follows :- 01 Johor Darul Takzim 02 Kedah Darul aman 03 Kelantan Darul Naim 04 Melaka 05 Negeri Sembilan 06 Pahang Darul Makmur 07 Perak Darul Ridzuan 08 Perlis 09 = Pulau Pinang 10 Sabah 11 Sarawak 12 Selangor Darul Ehsan 13 Terengganu Darul Iman 14 Wilayah Persekutuan 5 (c) (a) fe) (i1) The second two digits (3rd and 4th spaces) indicate the year the project is approved for design. (4441) The third two digits (5th and 6th spaces) indicate the series of the projects. The seventh space is to be filled up by a numeral which represents section component of a project. To standardise, numeral in the form of 1, 2, 3, etc. is used. Each numeral will represent a section of the project or package in a package deal project etc. This space will be zero if there is no component within the project. The eigth space is to be filled up by capital alphabets A, B, C, D etc if there are components within the package. The nineth space is to be filled up by two giphabets represent each categories of detail as ‘oLlow: ~ (4) AM - represents general include list of drawings, key and location plan, general layout, abbreviation symbol and legend, element of curve, superelevation, | guardrail, slope protection, site office, all typical drawings etc. (41) PT - pengambilan balik tanah represents land acquisition plan. (414) KB - keratan membujur represents alignment control plan, plan and longitudinal profile plan. (iv) KL - keratan melintang represents cross section plan. (v) LP - leant persimpangan represents junction layout plan, junction setting out plan, junction @rainage and pavement superelevation details plan, junction road markings, traffic signs, traffic light etc. (vi) KY - kawalan lalulintas represents traffic control plans include road markings, traffic signs, guide signs, temporary signs etc. 16 (vii) PP - perparitan represents drainage plans including subsoil drain, drains, culverts etc. (vidi)st - struktur represents structural plans including bridges, flyovers, grade-separated interchange, retaining walls etc. (ix) KA - kemudahan awam represents public utilities plans. (x) Lb = lain-lain represents miscellaneous plans include soil investigation subsoil profile, street lighting etc. (£) The tenth space is for the series of drawings for the particular detail as described in 7.1 (e). This space will be changed if there are more than one number of intersections or structures in a project. For example, ST 1/1, ST 1 stands for structure No.1 and 1 for the series of drawings for structure No. 1. For the first time of correction, it will be ST1/1A, (g) The eleventh space with capital alphabets in sequence shall be used for the amendments of drawings, for example; 10C for third time of correction of the same drawing. The system shall be used for all projects including all departmental and consultant designs. The recording of serial numbers of projects will be registered by the Documentation section, Unit Rekabentuk Jalan, Cawangan Jalan, Ibu Pejabat JKR, Kuala Lumpur. 7 THEATAN KERUA RATA MALAYSIA CAWANGAY JALAN MODEL DRAWING o.24 JABATAN KERJA RAYA MALAYSIA BIR (CAWANGAN ALAN PEMBAIKAN DAN PENEMPATAN SEMULA JALAN MELAKA - KENDONG KILOMETER 7-25 KE KILOMETER 9-50 MELAKA JILID M1 \easd/ Satan rr) AT TU PeLABAT BATA une RAVA MALAYSIA JULAI 1988 ea JALAN SULTAN SALAHU 50562 KUALA ik Rs. PRRRSeSCR/ me GENERAL cath ce aH es loupe agg er rae aecvanig SB. a LEBEHE eens OF” cue SRPEELEWTON ETS yma cas secon avast aea8s| waa sot etaks 61 ani S105 HreciOw wom iP cHOSIG, SETEMONT AER ad MASREMERT MARES ND MEASUREMENT FL, sire aFIce ALIGNMENT CONTROL, PLAN AND_LONGITUOWMAL PROFLE tna CoML Lan HOM Ch 1003930) 10 CH wok (200009 suoen coMno. fuk ibe a Feo om Fiat Py a rat rar raw ras raw rat ge m(30000) Th Ok 78338 mao ‘40 wor stc08 SUA 008) Te Ck 85z6m i000 0 cruamal sec ebro Toke ecu 7152 2000 0 oxnaae sc100 (GE Tem onaDy To CX HEAL 30009, ‘yo tora, screw ee 20 PIFLE OF ose (3307 wok HALEY (NO MERLE OF H2LO0m Som) OK 174 mAD0') PROFLE 0% D97UL m TAO} We se mpmAE') ‘PRFLE CH sd w HN) To 47576 TE, ua PORLE CASTE ON} To cH 7 mz 0 mE OH 7% mt} TO S576 mE (We MPL. OF 876m TO} WO SLL TIOD'S 180 LE OL 43128 ze) OL mAZBHA CENA! 3H PRFUE CF TLAABMZ30 TO OL TALIS) ‘cROSS_SECTION cass ‘Che — OL 0.38 4325" Ok 51816 m7") OF S486 mqBE!) To OF IGA Oy ie wi 10 PM LTS") Pat eta | 01 60 msHe} To aL Taso m5, 4 a8 5 Foe ASOD = O« maesn stn) so ot 120 me 04 mse ste 1m zz6o0m 7500" ce 238 mt ok esc HSNO} 0 e128 on) 0 oF 29580—850') 1 260n-s60} 10. sI0aUOMISO¢) 04 98 mina 10 cx 520m 50) —~ 1 i556 mio} 1 oH OLE TREO OF e708 mir} OF ws zEmcase0) 04 756 m0 10 Oso 04 aan ee 10H ABEND) 2 63601570 10 cH HETAMUHLNOY oh samo maar} Ww ox sass SHEET W0, ® a a n a % 6 B 2 0 a a et RG. a. PAYA me SHEET HL ass StcTN — Ov Sa TI w OF EFA MUAROND U5 On S77 mH OL SAI LED US OH Sener 10 OF 8686 mvzBNC) 7 ee zm 0 OH TECTED 4 ene) Dv erg oe cao} GH MLO MEOH 50 ox mua abe 2104 10 oH 0520 ize) 5 14 rusmc! 0 OF RATED RSH) 52 uneTiOn_LavouT DMERSECHON¥0 1 (ALN cBHER» WAFPC SEAMS MIRSETON AL LAN CARER) IMEESECTON 982 HAAN EBD) AFF Scns TERSECTON HD 2UAR IMESECTON no. 3 Mk AESMG SOEME) "WAFFE CUMS WERSECTON Me 31K MSW SHEE) Ineseenea 04 Stn INEESECnGL m0 Sat CH 20608496007 WMFFC SEAMS MEASECTON HL § EESECHON m0 GALAN PAUKG 9 MESECNON 0.7 aT BERLIN WIT) marr Se4als—wtteseeron 0.7 HICH W) 8 AT OLIE6240m (0.0 MERSECTON H0. (SEMAN IPAS) TERSEEHOA 40M. AY 154579 min) MAFF SQULS — MTERSECTON M0 INERSCTON HE AT S8ORT mB OERSECHON WAT 574050) IMERSECON 10 AL OF BL3L 38 mtTO') IMTEESECION 0K AT G¥BR 48 2600) {106 wT aeons. FoR MACHON Bs. 1 AMG acess fo" atad etm ue ‘TRAEFIC CONTROL suo vanes tS WaDtKs AND REGLAIG READ StS STIMOARO LETTERING FOR HS eNO MARK 18) SS weve HURL ‘esta stas UESIMAION SIRS AND ROAD sO MPRA REWUNIN AAD. KS auscrncnT 0) acaTon oF Tema stXs teu a “oc SO FT ett Re, NOLKPRRUURVOSEBCOOY RATE aca, oxanuct ots Damace ume, Tas met rns octaus Ew TER eS DeIAMS BLO OMAN ANCHE teas oF UES a0 2 AMO 0 2 EAIMAKL CHEE PC CEM (1) IMAL, MO OKETE PRE HEI (2) SoC CUERT OF Keo @ba(318) GENER, aneaHEN oF zenro caveer ocaKs F z000 m8) AER OSPHTOR TAL, oF G90 mes") seve. seman OF zhao tic) DeEALS OF CER! 4 EMAL (1) De CERLGU mics) OETALS OF CREAT 2 WHORL (2, 4 ust 056) GERAKAN Ast tO") OeTALS OF CUE & WHHL, ‘cyt SEOUL AMO BDO ETERS RAINACE PAM CH 053m 300) TCX 28.00 (SEY (4 2400500) oH TIT 7004 (8 7h mt 70} TCH TA CBD (SERN Ha) TO 05.5 70 (USP eNH7OOY WOH 3776 mY ( GST7 mR TH OH $8876 (HPO (S76 04700) TOK aL mY (Ce zB camed) mck TLONd (3107) (1 racnne (2100) Cm A mY me or one ‘STRUCTURE ST U/1 BOGE. 10. ROE $1 —cveRAL_ auc sit = sa oak sr ne semas ste Deus oF AoE 8 8 sis ee SLAG TRMRIN uae ORTAKS sts = 27 ETRE PRESTRESSED BEAM BETALS S127) GRNGE M017 WuTe $1) — CNERALaRRENENT stan ~ so sia = rive otras seu = BEULS OF ABUTHENT A sta — pets OF Pek 22 stys = 8 METRE PRESTRESSED aa DECALS stat — V5 WETRE PuESIESSED BEAM BETALS sts —OUEK - SLAB & HURSTON SLAB DETALS ST 971 sHUGe vo 5. ROUTE $1 — GevehAL ARREKGNEAT sian = son ara sia LE OETA sry OETA OF ABTHEAT A Bars — DEK SLAN ATEANITN SLAB DETALS sts 27 MeTHE PResraesseD Bea HETALS STE RETANG WALL 10 CHARDON JOM METALS SHEET. “ 5 % a o 6 0 ” 2 ° % 5 ™ m w a a 5 15 m ™ ny ry m a 1m mw oa 1% 2 me w m ‘RE. NPAV/ROSE203/0/ (MODEL ORAWING 1034, me PUBLIC UTITLES SRVEES — WAR SwRLY SuADARD cEIMLS 11), SOEES — WEL SIRT SHNOARD EEK 17) SERUCES — WATER SUF AND LOK SANMHO ceIBKS TELECOMS stayaARD OES 1) TELECOMS. staueRautBLs 2) eLECtNS SUMOAHO eIaKS (3) ELECOMS SreuneRD OeTALS ey TeLecons.sanoaRy eran 15) SERS MAR — OH CH 0.00 1m Of 380% mans OM OH IEE 1954 TO CH 725 6 wt 260) FROM CH 725.2 BBO TD CH 100581330") FON ch UWL s300) TO CH 124.08 L500) = FOM LOD (SOE) TD CH 22774 C7400) MOF 1746 TM TO CR TAK mo — ow ca e184 mye Ok 7576 700) HOM ca 4596 mBMOY To Oe 482% SEN FON ch «8376 m(6200) 1D cH 548875 41700 OM OL S87 mCH7E0) TO CL BLRT2BmczVON" FROM 6280} TO CH OKO C100 MISCELLANEOUS LOWY oa kaw — ER RGN — 9 w w uw uw u u uw uw uw uw uw uw w wus si on wi wa. us 6 Ww wm m wa us os us " SGA PsHOI— AVE OVERSOK = 2 Gal PaO — Aer VERSO - 3 ss See OF ER eksON USS SECDOL OF AER IERSION SS SECON OF fER_ERSION ess StcTOR AER O¥ESION STREET UCATNG LAM FROM C104 22005 TO CR 237.64 76004 FROM GL NAL HOO) cH U5 161037004) FROM C4 7576 m (10) TD CH 569076 meO0) ROH CH S57 1700 TCH 70.0.8 m 2200" ROM TaD MB HON TCH 77766 m5 SIREET UGKTNG SOHEMATE LAE HEEAK C1) STREET UGEING SCHEMMTE UNE OURO (2) 6 UGHTWG SOEMETE. URE Ob (3) TABATAN KERIA RATA MALAYSIA MANGAN JALAN ORAWING.1NDEK SHEET 0 » me 1m ne 15 i or hy is ua Pt 1 0 rH us we I i 3 % 5 18 "7 ca ws we 8 18 ft — [oe MODEL ORWNG Hob, v NEGERI PAHANG DARUL MAKMUR PACKAGE 1 Gh 98700 ~ YR ROAD Fram Gh Om To ChEGom) (BV FISS-Fiem Chom To PACKAGE 2 Trea $870 To Ch THESwT TABATAW KERN RAVA MALAYSIA soe un rvs a = CAWARGAN JALAN LOCATION PLA ABBREVIATION FLL woRDs eviATON MEA OF cur T FEA OF FL 1 AccELERATON LE Me werron ip ct extn ane uae ‘eae 0 cemie comaeutt comet cust a aA D METAL tvove mace coatere ‘eeeeucaaron Lane ‘nw sincAM unereR fc ace ein ct wy oor FAR ACE MSE LEVEL aman LEVEL Ke eo LeveL, wy Task eins ew. ven LeveL, AS cE au uaa vanrens ue uence. FT Ha SE ETRE MME ash mar stece wan tea cen woes OT stKe, Pa aecast mec Oa PaesTacsen concn PASSING SENT ASTAZE PERMANENT SURVEY ARK, ant io ste. acrorar Bue AINUACED coHETE cnrncen conaeTE iE GAT MAD SDE emcee EVEL ference wane iT wa SHPERATERDGAFFCE SHOPG GH HISTAEE sta soma ww Tennant Ma wee ect vesttews Hg un tee, ‘evonmet es Mak ace LEGEND DETAILS RALWAY_ UNE VERS 02 STREAM oxty Pov Pao ‘srmicr oon ‘tase scunaaer cevereer Fence (OASTING) swine ‘ex ROAD oR TRACK som ~ Pesmanent suti0ms PesMANENT URES ‘BONG To DEMOLISHED Lot sowie ‘sromar station DETAILS Savery Fence FENCE (RELOCATED OR NED Gare (exsive ‘GATE teaoeareD oF Wow) RIGHT OF War LINE (ROW) EXISTING HASTONE ouerae Fost uaronan S104 Post DIRECTIONAL ION TRAFIC SIGNAL POLE ‘OVERHEAD TRAFFIC: SIONAL POLE PROPOSED SINGLE LANTERN STREET UGHTING PROPOSED TWIN LANTERN STREET LIGHTING PrOPCSEO UAL AGES MAY PROPOSED SINGLE CRVCEARY GHNY FAL store ore Is AUGER BORE st Pit eccnTost Pee ‘are oma eso oa ADSI RA ou oA oe aman cna ote ‘SHOUNER BAIN erst oe TABATAN ERA RATA MALAVSTA CAWANGAN JALAN ABBREVIATION SYMBOL AND LEGEND a EERSECIR FO OF NEE eat pt tein PORT GF ENANDE. FROM EREIRAR CURVE. TD TANGENT 1 Comat ANGLE OF SPRAL_ ARC Le (Seal ae) (8 DErLEcTon anoLE ATS FROM erat Tae Yo SC OR AT St PROM WeTIAGcANCENT TO 6 TR tne, eet \ / Ri Sia ak oo scenes rat Fs Entel OBtANCE (at om Pi mel of he se FOR MERETOMAL CURVE WPICAL HoRIZOWTAL_cuRvE_{ WAH TRANSIT WPICAL ORZOWTAL CRCULAR CURVE oonuae then tenor ew cove Ee (dans) ‘a4 AOEERAIC DIFFERENCE mM ORADES (Pecan) cr TE GRACES leks Ho MO-ORDMATE {Yara tat tam VIP othe ie of care) 1 SPIRAL ame OM TS. OR ST TO ANY PONT ON SPRAL ‘me aNceNt at THE SERAL AND TANGENT CITANCE TWeICAL_VERTICAL cunVE a oes mame Hs exc yy ennanen oF A feu ne ep hn a nn ee a TABATAN TERIA RA MALAYSIA ns ra CANINGAN ILA ar od z i ELEMENTS OF cuavE Yen, ‘SHOULDER TREATMENT. SUPERELEVATION FOR SINGLE CARRIAGEWAY MODEL ORAWIG Ho, 6A Uigeta smu i se? — = Ser Sint tit TYPLCAL uaa css sect ee eae ese ewer secn08 TABATAN NERA RAR MALAYSIA CAWANGAN JALAN ce) TYPICAL ROAD CROSS SECTION AND PWEMENT DETALS uc mas yee was on ee unets Ta, 3 WA? 038m W 9512.13. weau9 611 m a a5 ]_39.995 ys ys | 0488 m tr 60-m_[tt | 40.039 Peres [St —ew 18.962 te 3583 P 31 am aa W 449 6t1 oe Buen i BL bee poem [ok i tc rm 19.906 m_ ye jk: TT {20.000m [[59-3390m_|se] Tom Steere (srt one oe a PT 0.15 m | fs Eh 8 le st [Es ie 39m ta Bo wa Suiszr2arm 5 12408-6855 m SRA, ERCOLAR IPS SPRAL W7587 661m w 5303-231 m 10r 7 39995 mn 12.00.m [ys | 06890m FREES eae 80m, xaG0m ‘6Om Z0.039" = zasyg [S| 19 962m, 3 ts trp éoooom fr ass7 [tc | 239:105m Del msrss"| sr [20.000 ‘0.176 ‘@s| OTsI'34r | Lc | 303 209m, ep ona] pt o. 3 [eta 8" [k| “30- 000m, oR Tm te a 2.26% | 30.997 m freee] 160 emir Es Base un [82m (ict ~$.990 joo kms TABATAN KERIA RATA MALAYSIA CAWARGAN AL ALIGRMENT COMTROL FLAK pol ne on i { 44 q 3 | coma t sat wot 15 mee ae Si 7 “a ne ee EEE eee eee eee eae fain) a “ Law [om | et Wingeah wm eae [e=} JABATAM KERJA RAYA MALAYSIA — - a CAWANSAN ALAN cer sai “ LNW aNd LonGTUONAL paorUE ‘MODEL ORAWDS Ho 1h Eee uF ba triad as @Q TABATAN KERIA A MALAYSIE ge ena mans CAWANGAN JALAN aT JICTION DETALS ~ GENERAL LAYOUT eT LMT C9 18900 TAT TE Oe aS TABATAN TERIA RATA MALAYSIA CAWANGAN JALAN SUNCTION DETAILS SETTING CUT Boon os SUSHED Lev. shore — 920 section N 597.400 scerion Ack (TYPICAL TABATAN KERIA AVA MALAYSIA CAWARGAN IMLAY aap JUNCTION DETAILS PAVEMENT SUPERELEVATION “SHG Kee autenerh Seg “Becrmans © © a OFT chee on) Ee wen OO @ © aa CoD Tp A OST Bas os rows a ty Bs Ndi roa re 1 ro ae en A ASE e 5008 eeesoeceseazel a Wa ane “a2 aT ens THBATAN TERIA RAR MALANSTA CAWANGAN JALAN sore XID CS-MARS HS CULVERT iE (im) Da FL HEAT ABIVE CROWN (a) ume WERT LeveL in) DSOHARSE (0) (m3/see) m0 1 00 oe 20 22 090 os 078 Nor Yo scate TABATAN CERIA BAYA MALAYSIA ‘CAWANGAN JALAN esata = oe MODEL ORANG No.164 ers | = / went) | nome] \\ Vee L | endo —_ 4d ads i Lowpiiy seciioe son cuaniny se suncal |Pesoe PLAN Witnour oECK TYPICAL caus. section PALER srt pias eel aru mene ace eee) a a E® a7 5 NETSB TABATAW KERUA RAYA MALAYSIA CANANGAN JALAN a ere aa ee iz Farvastan ie on BRIDGE DETAILS i i i i i yn ean tf aay acy es ey nnd oe lw, a a 00 tits TABATEN KERDA RATA WATAVSIA CAWANGAN JALAN SOIL PROFILE on

You might also like