You are on page 1of 1

WELDING PARAMETERS INSPECTION REPORT

CLIENT SOUTH ASIA PAKISTAN TERMINAL DOC NO.


PROJECT PAKISTAN DEEP WATER CONTAINER PORT PHASE -1 POWER HOUSE REV: 1

COURSE # QIP ITEM NO._6.9___________________ APPLICABLE WPS :WPS/PC/AR-02 PAGE:


TANK NO. DRAWING NO. DATE:

S.# INSPECTION ITEM

WELDING DATE

1 BEFORE WELDING

1.1 PLATE THICKNESS

1.2 FIT UP

1.3 PROTECTION AGAINST ADVERSE WEATHER

2 DURING WELDING

2.1 ROOT

2.2 WELDING PARAMETERS HOT

2.3 FILLING

2.4 CAPING

BACKPASS

2.5 WELDER STAMP NO

3 AFTER WELDING

3.1 CLEANING

QA / QC PETROCON QA/QC AEROROYCE JV WELDING INSPECTOR HALCROW

NAME
DATE

SIGNATURE

You might also like