You are on page 1of 1

WELDING PARAMETERS INSPECTION REPORT FOR TANK

HAND RAILLING
CLIENT SOUTH ASIA PAKISTAN TERMINAL DOC NO.

PROJECT PAKISTAN DEEP WATER CONTAINER PORT PHASE -1 POWER HOUSE REV: 0

REF QIP NO._______________________________ APPLICABLE WPS :WPS/PC/AR-1,2 PAGE:


TANK NO. DRAWING NO. DATE:

S.# INSPECTION ITEM

1 BEFORE WELDING

1.1 FIT UP/ ROOT GAP/ BEVEL

1.2 PROTECTION AGAINST ADVERSE WEATHER

2 DURING WELDING

2.1
Welding Parameters 1st Pass

2.2 2nd Pass

2.3 WELDER STAMP NO

3 AFTER WELDING

3.1 CLEANING

QA / QC PETROCON QA/QC AEROROYCE JV WELDING INSPECTOR HALCROW

NAME
DATE

SIGNATURE

You might also like