You are on page 1of 31

SUMMARY TEST KEPADATAN LAPANGAN DENGAN SAND CONE

Lokasi : LPA akses SANEO ALAT PEMADATAN : Vibro MC : 6 PERIODE :


Perbandingan Kepadatan Lapangan dan
Kadar Air
No Tanggal Sta Elevasi Layer Kepadatan Laboratorium Keterangan
Kepadatan Lab Kepadatan Lap Derajat Kepadatan Omc. Di Lap
1 10/22/2019 0+000 1 2.070 2.109 101.88 7.1 5.5

2 10/22/2019 0+125 1 2.070 2.279 110.10 7.1 6.9

3 10/22/2019 0+250 1 2.070 2.113 102.08 7.1 5.6

4 10/22/2019 0+350 1 2.070 2.244 108.41 7.1 6.4

5 10/22/2019 0+450 1 2.070 2.259 109.13 7.1 6.7

6 10/22/2019 0+550 1 2.070 2.083 100.63 7.1 7.0

7 10/22/2019 0+670 1 2.070 2.241 108.26 7.1 6.8


8 10/22/2019 0+770 1 2.070 2.232 107.83 7.1 7.8

9 10/22/2019 0+875 1 2.070 2.275 109.90 7.1 5.9

10 10/22/2019 0+975 1 2.070 2.187 105.65 7.1 7.2

11 10/22/2019 1+025 1 2.070 2.177 105.17 7.1 7.1

12 10/22/2019 1+150 1 2.070 2.228 107.63 7.1 7.1

13 10/22/2019 1+325 1 2.070 2.144 103.57 7.1 7.1

14 10/22/2019 1+475 1 2.070 2.229 107.68 7.1 5.8

15 10/22/2019 1+575 1 2.070 2.249 108.65 7.1 7.0


16 10/22/2019 1+675 1 2.070 2.252 108.79 7.1 7.3

17 10/30/2019 1+775 1 2.070 2.098 101.35 7.1 6.7

18 10/30/2019 1+875 1 2.070 2.247 108.55 7.1 6.0

19 10/30/2019 1+975 1 2.070 2.223 107.39 7.1 6.5

20 10/30/2019 2+075 1 2.070 2.120 102.42 7.1 6.2

21 10/30/2019 2+175 1 2.070 2.094 101.16 7.1 6.1

22 10/30/2019 2+275 1 2.070 2.132 103.00 7.1 7.4


23 10/30/2019 2+425 1 2.070 2.155 104.11 7.1 6.2

24 10/30/2019 2+525 1 2.070 2.104 101.64 7.1 5.3

25 10/30/2019 2+675 1 2.070 2.256 108.99 7.1 5.5

26 10/30/2019 2+800 1 2.070 2.246 108.50 7.1 6.4

27 10/30/2019 2+925 1 2.070 2.157 104.20 7.1 6.8

28 10/30/2019 3+025 1 2.070 2.119 102.37 7.1 7.3

29 11/2/2019 3+125 1 2.070 2.188 105.70 7.1 5.6

30 11/2/2019 3+225 1 2.070 2.157 104.20 7.1 6.7


31 11/2/2019 3+400 1 2.070 2.125 102.66 7.1 7.4

32 11/2/2019 3+500 1 2.070 2.239 108.16 7.1 7.7

33 11/2/2019 3+625 1 2.070 2.193 105.94 7.1 6.5

34 11/2/2019 3+725 1 2.070 2.257 109.03 7.1 7.6

35 11/2/2019 3+800 1 2.070 2.199 106.23 7.1 7.9

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT.Nindya Karya (Persero)

( JUS ARJULA ) ( ) ( M. FAUZI )


SUMMARY TEST KEPADATAN LAPANGAN DENGAN SAND CONE
Lokasi : LPA akses PELITA ALAT PEMADATAN : Vibro MC : 6 PERIODE :
Perbandingan Kepadatan Lapangan dan
Kadar Air
No Tanggal Sta Elevasi Layer Kepadatan Laboratorium Keterangan
Kepadatan Lab Kepadatan Lap Derajat Kepadatan Omc. Di Lap
1 10/2/2019 0+200 1 1.980 2.055 103.79 10 8.5

2 10/2/2019 0+275 1 1.980 2.139 108.03 10 7.8

3 10/2/2019 0+350 1 1.980 2.091 105.61 10 10.0

4 10/2/2019 0+425 1 1.980 2.167 109.44 10 7.2

5 10/2/2019 0+500 1 1.980 2.084 105.25 10 7.3

6 10/2/2019 0+575 1 1.980 2.189 110.56 10 9.9

7 10/2/2019 0+675 1 1.980 2.012 101.62 10 7.6


8 10/2/2019 0+750 1 1.980 2.042 103.13 10 7.6

9 10/2/2019 0+825 1 1.980 2.121 107.12 10 8.9

10 10/2/2019 0+925 1 1.980 2.087 105.40 10 7.7

11 10/2/2019 1+000 1 1.980 2.045 103.28 10 7.0

12 10/2/2019 1+062.5 1 1.980 2.178 110.00 10 7.3

13 10/2/2019 1+125 1 1.980 2.177 109.95 10 7.4

14 10/2/2019 1+225 1 1.980 2.115 106.82 10 8.0

15 10/2/2019 1+287.5 1 1.980 1.990 100.51 10 7.5


16 10/2/2019 1+375 1 1.980 2.162 109.19 10 7.1

17 10/2/2019 1+450 1 1.980 2.050 103.54 10 10.5

18 10/2/2019 1+525 1 1.980 2.188 110.51 10 7.8

19 10/2/2019 1+650 1 1.980 1.986 100.30 10 7.1

20 10/2/2019 1+725 1 1.980 2.021 102.07 10 8.2

21 10/2/2019 1+775 1 1.980 2.087 105.40 10 9.5

22 10/2/2019 1+850 1 1.980 2.185 110.35 10 8.1


23 10/2/2019 1+950 1 1.980 2.009 101.46 10 7.5

24 10/2/2019 2+000 1 1.980 2.180 110.10 10 9.3

25 10/3/2019 2+075 1 1.980 2.007 101.36 10 7.2

26 10/3/2019 2+175 1 1.980 2.137 107.93 10 8.4

27 10/3/2019 2+275 1 1.980 2.107 106.41 10 7.9

28 10/3/2019 2+375 1 1.980 1.988 100.40 10 7.5

29 10/4/2019 2+475 1 1.980 2.153 108.74 10 8.1

30 10/4/2019 2+600 1 1.980 2.080 105.05 10 7.7


31 10/4/2019 2+700 1 1.980 2.009 101.46 10 8.8

32 10/4/2019 2+775 1 1.980 2.064 104.24 10 8.0

33 10/4/2019 2+875 1 1.980 1.993 100.66 10 8.2

34 10/4/2019 2+975 1 1.980 2.016 101.82 10 10.5

35 10/4/2019 3+050 1 1.980 2.158 108.99 10 9.8

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT.Nindya Karya (Persero)

( JUS ARJULA ) ( ) ( M. FAUZI )


SUMMARY TEST KEPADATAN LAPANGAN DENGAN SAND CONE
Lokasi : Zona 3 akses ALAT PEMADATAN : Vibro MC : PERIODE :
Perbandingan Kepadatan Lapangan dan
Kadar Air
No Tanggal Sta Elevasi Layer Kepadatan Laboratorium Keterangan
Kepadatan Lab Kepadatan Lap Derajat Kepadatan Omc. Di Lap
1 9/12/2019 T.100 1 2.020 2.213 109.55 8.5 7.7

2 9/12/2019 T.103 1 2.020 2.099 103.91 8.5 6.9

3 9/12/2019 T.106 1 2.020 2.047 101.34 8.5 6.1

4 9/12/2019 T.108 1 2.020 2.173 107.57 8.5 6.4

5 9/12/2019 T.112 1 2.020 2.209 109.36 8.5 5.9

6 9/12/2019 T.115 1 2.020 2.180 107.92 8.5 7.4

7 9/12/2019 T.117 1 2.020 2.070 102.48 8.5 5.5


8 9/11/2019 T.120 1 2.020 2.213 109.55 8.5 6.2

9 9/11/2019 T.123 1 2.020 2.219 109.85 8.5 7.2

10 9/11/2019 T.125 1 2.020 2.190 108.42 8.5 7.7

11 9/11/2019 T.128 1 2.020 2.143 106.09 8.5 5.9

12 9/11/2019 T.130 1 2.020 2.127 105.30 8.5 7.6

13 9/11/2019 T.133 1 2.020 2.155 106.68 8.5 6.9

14 9/11/2019 T.136 1 2.020 2.111 104.50 8.5 7.1

15 9/11/2019 T.139 1 2.020 2.089 103.42 8.5 6.5


16 9/10/2019 T.142 1 2.020 2.166 107.23 8.5 5.7

17 9/10/2019 T.146 1 2.020 2.189 108.37 8.5 8.7

18 9/10/2019 T.149 1 2.020 2.076 102.77 8.5 5.9

19 9/10/2019 T.151 1 2.020 2.195 108.66 8.5 8.0

20 9/10/2019 T.155 1 2.020 2.127 105.30 8.5 7.1

21 9/10/2019 T.158 1 2.020 2.177 107.77 8.5 5.5

22 9/10/2019 T.161 1 2.020 2.211 109.46 8.5 7.1


23 9/10/2019 T.163 1 2.020 2.208 109.31 8.5 6.1

24 9/10/2019 T.165 1 2.020 2.047 101.34 8.5 5.9

25 9/10/2019 T.167 1 2.020 2.180 107.92 8.5 6.6

26 9/10/2019 T.169 1 2.020 2.209 109.36 8.5 6.4

27 9/10/2019 T.172 1 2.020 2.133 105.59 8.5 8.2

28 9/10/2019 T.174 1 2.020 2.078 102.87 8.5 7.1

29 9/10/2019 T.177 1 2.020 2.140 105.94 8.5 6.6

30 9/10/2019 T.179 1 2.020 2.198 108.81 8.5 7.3


31 9/10/2019 T.181 1 2.020 2.055 101.73 8.5 5.8

32

33

34

35

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT.Nindya Karya (Persero)

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 8/10/2018 3 Gorong - Gorong 182.6 182.895 -0.30 0.09

2 8/10/2018 3 2F 191.3 182.895 8.41 70.64

3 8/10/2018 3 186.04 182.895 3.14 9.89


4 8/14/2018 7 176.5 182.895 -6.40 40.90

5 8/14/2018 7 180.8 182.895 -2.10 4.39

6 8/14/2018 7 203.3 182.895 20.41 416.36


7 8/21/2018 14 181.8 182.895 -1.10 1.20
8 8/21/2018 14 178.6 182.895 -4.30 18.45

9 8/21/2018 14 188.9 182.895 6.01 36.06

10 8/28/2018 21 179.4 182.895 -3.50 12.22

11 8/28/2018 21 182.3 182.895 -0.59 0.35

12 8/28/2018 21 175.7 182.895 -7.20 51.77

13 9/4/2018 28 175.9 182.895 -7.00 48.93

14 9/4/2018 28 180.12 182.895 -2.78 7.70

15 9/4/2018 28 182.9 182.895 0.00 0.00


16 8/2/2018 3 177.3 182.895 -5.60 31.30
17 8/2/2018 3 194.7 182.895 11.81 139.36

18 8/30/2018 21 179.4 182.895 -3.50 12.22

19 8/30/2018 21 182.3 182.895 -0.59 0.35


20 9/6/2018 28 178.04 182.895 -4.86 23.57

Jumlah 3657.9 925.75

δ'bm = Σσbi = 3657.9 = 182.895 kg/cm2


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟗𝟐𝟓.𝟕𝟓) =
/𝟏𝟗 = 6.98

δ'bk = δ'bm - 1.64 s = 182.895 - 1.64 x 6.98 = 171.45 kg/cm2

V = S X 100 % = 6.98 x 100 % = 3.82%


δ'bm 182.895

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( ) ( ) ( )
EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 125
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 6/4/2019 7 DUMRUG SANEO 126.18 129.179 -3.00 8.99

2 6/4/2019 7 130.15 129.179 0.97 0.94

3 6/4/2019 7 133.14 129.179 3.96 15.69


4 6/4/2019 7 128.17 129.179 -1.01 1.02

5 6/4/2019 7 132.14 129.179 2.96 8.77

6 6/6/2019 7 127.17 129.179 -2.01 4.03


7 6/6/2019 7 129.16 129.179 -0.02 0.00
8 6/6/2019 7 132.14 129.179 2.96 8.77

9 6/6/2019 7 130.15 129.179 0.97 0.94

10 6/6/2019 7 126.18 129.179 -3.00 8.99

11 6/7/2019 14 129.61 129.179 0.43 0.19

12 6/7/2019 14 131.19 129.179 2.01 4.05

13 6/7/2019 14 128.03 129.179 -1.15 1.32

14 6/7/2019 14 128.82 129.179 -0.36 0.13

15 6/7/2019 14 131.19 129.179 2.01 4.05


16 6/9/2019 14 129.61 129.179 0.43 0.19
17 6/9/2019 14 128.03 129.179 -1.15 1.32

18 6/9/2019 14 130.4 129.179 1.22 1.49

19 6/9/2019 14 126.45 129.179 -2.73 7.44


20 6/9/2019 14 125.66 129.179 -3.52 12.38

Jumlah 2583.57 90.70

δ'bm = Σσbi = 2583.57 = 129.1785 kg/cm2 129.1785


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟗𝟎.𝟕𝟎)/ =
𝟏𝟗 = 2.18 4.77386605263156

δ'bk = δ'bm - 1.64 s = 129.18 - 1.64 x 2.18 = 125.6 kg/cm2 125.6033 3.5752

V = S X 100 % = 2.18 x 100 % = 1.69% 1.68758733070906


δ'bm 129.18

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 125
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 5/13/2019 3 DUMRUG SYPHON 134.46 136.939 -2.48 6.15

2 5/13/2019 3 131.37 136.939 -5.57 31.01

3 5/13/2019 3 140.64 136.939 3.70 13.70


4 5/13/2019 3 145.28 136.939 8.34 69.57

5 5/13/2019 3 139.1 136.939 2.16 4.67

6 5/17/2019 3 136.01 136.939 -0.93 0.86


7 5/17/2019 3 140.64 136.939 3.70 13.70
8 5/17/2019 3 139.1 136.939 2.16 4.67

9 5/17/2019 3 134.46 136.939 -2.48 6.15

10 5/17/2019 3 145.28 136.939 8.34 69.57

11 5/20/2019 3 140.64 136.939 3.70 13.70

12 5/20/2019 3 142.19 136.939 5.25 27.57

13 5/20/2019 3 145.28 136.939 8.34 69.57

14 5/20/2019 3 137.55 136.939 0.61 0.37

15 5/20/2019 3 136.01 136.939 -0.93 0.86


16 5/24/2019 7 132.14 136.939 -4.80 23.03
17 5/24/2019 7 134.13 136.939 -2.81 7.89

18 5/24/2019 7 128.17 136.939 -8.77 76.90

19 5/24/2019 7 129.16 136.939 -7.78 60.51


20 5/24/2019 7 127.17 136.939 -9.77 95.43

Jumlah 2738.78 595.89

δ'bm = Σσbi = 2738.78 = 136.939 kg/cm2


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟓𝟗𝟓.𝟖𝟗) =
/𝟏𝟗 = 5.60

δ'bk = δ'bm - 1.64 s = 136.94 - 1.64 x 5.60 = 127.76 kg/cm2 127.755 9.184

V = S X 100 % = 5.6 x 100 % = 4.09%


δ'bm 136.94

KESIMPULAN :
Hasil evaluasi concrete mutu beton K-125 memenuhi syarat
minimum yang diijinkan.

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 125
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 4/28/2019 3 DUMRUG 1A 129.82 135.309 -5.49 30.13

2 4/28/2019 3 134.46 135.309 -0.85 0.72

3 4/28/2019 3 131.37 135.309 -3.94 15.52


4 4/28/2019 3 137.55 135.309 2.24 5.02

5 4/28/2019 3 140.64 135.309 5.33 28.42

6 5/1/2019 3 134.46 135.309 -0.85 0.72


7 5/1/2019 3 129.82 135.309 -5.49 30.13
8 5/1/2019 3 142.19 135.309 6.88 47.35

9 5/1/2019 3 139.1 135.309 3.79 14.37

10 5/1/2019 3 137.55 135.309 2.24 5.02

11 5/5/2019 3 140.64 135.309 5.33 28.42

12 5/5/2019 3 132.91 135.309 -2.40 5.76

13 5/5/2019 3 137.55 135.309 2.24 5.02

14 5/5/2019 3 129.82 135.309 -5.49 30.13

15 5/5/2019 3 139.1 135.309 3.79 14.37


16 5/8/2019 3 132.91 135.309 -2.40 5.76
17 5/8/2019 3 137.55 135.309 2.24 5.02

18 5/8/2019 3 129.82 135.309 -5.49 30.13

19 5/8/2019 3 131.37 135.309 -3.94 15.52


20 5/8/2019 3 137.55 135.309 2.24 5.02

Jumlah 2706.18 322.54

δ'bm = Σσbi = 2706.18 = 135.309 kg/cm2 135.309


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟑𝟐𝟐.𝟓𝟒) =
/𝟏𝟗 = 4.12 16.9758410526316

δ'bk = δ'bm - 1.64 s = 135.309 - 1.64 x 4.12 = 128.55 kg/cm2 128.5522 6.7568

V = S X 100 % = 4.12 x 100 % = 3.04% 3.04488245423438


δ'bm 135.309

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 4/19/2019 3 SALURAN TALANG 177.73 179.134 -1.40 1.97

2 4/19/2019 3 1A 183.92 179.134 4.79 22.91

3 4/19/2019 3 185.46 179.134 6.33 40.02


4 4/19/2019 3 176.19 179.134 -2.94 8.66

5 4/23/2019 7 176.85 179.134 -2.28 5.21

6 4/23/2019 7 179.83 179.134 0.70 0.49


7 4/23/2019 7 175.86 179.134 -3.27 10.72
8 4/23/2019 7 178.84 179.134 -0.29 0.09

9 5/2/2019 14 179.4 179.134 0.27 0.07

10 5/2/2019 14 180.98 179.134 1.85 3.41

11 5/2/2019 14 177.82 179.134 -1.31 1.73

12 5/2/2019 14 182.56 179.134 3.43 11.74

13 5/16/2019 28 176.65 179.134 -2.48 6.17

14 5/16/2019 28 178.74 179.134 -0.39 0.15

15 5/16/2019 28 180.13 179.134 1.00 0.99


16 5/16/2019 28 177.35 179.134 -1.78 3.18
17 4/22/2019 7 179.83 179.134 0.70 0.49

18 4/22/2019 7 180.83 179.134 1.70 2.88

19 4/22/2019 7 177.84 179.134 -1.29 1.67


20 4/22/2019 7 175.86 179.134 -3.27 10.72

Jumlah 3582.67 133.27

δ'bm = Σσbi = 3582.67 = 179.1335 kg/cm2 179.1335


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟏𝟑𝟑.𝟐𝟕) =
/𝟏𝟗 = 2.65 7.01400289473683

δ'bk = δ'bm - 1.64 s = 179.134 - 1.64 x 2.65 = 174.79 kg/cm2 174.7875 4.346

V = S X 100 % = 2.65 x 100 % = 1.48% 1.4793436180279


δ'bm 179.134

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 6/8/2019 3 SALURAN TRANSISI 176.19 180.474 -4.28 18.35

2 6/8/2019 3 ZONA1&2 180.83 180.474 0.36 0.13

3 6/8/2019 3 179.28 180.474 -1.19 1.42


4 6/8/2019 3 183.92 180.474 3.45 11.88

5 6/12/2019 7 175.86 180.474 -4.61 21.28

6 6/12/2019 7 181.82 180.474 1.35 1.81


7 6/12/2019 7 178.84 180.474 -1.63 2.67
8 6/12/2019 7 179.83 180.474 -0.64 0.41

9 6/10/2019 3 183.92 180.474 3.45 11.88

10 6/10/2019 3 180.83 180.474 0.36 0.13

11 6/10/2019 3 185.46 180.474 4.99 24.87

12 6/10/2019 3 179.28 180.474 -1.19 1.42

13 6/14/2019 7 176.85 180.474 -3.62 13.13

14 6/14/2019 7 176.85 180.474 -3.62 13.13

15 6/14/2019 7 180.83 180.474 0.36 0.13


16 6/14/2019 7 177.84 180.474 -2.63 6.94
17 6/11/2019 3 180.83 180.474 0.36 0.13

18 6/11/2019 3 183.92 180.474 3.45 11.88

19 6/11/2019 3 179.28 180.474 -1.19 1.42


20 6/11/2019 3 187.01 180.474 6.54 42.73

Jumlah 3609.47 185.73

δ'bm = Σσbi = 3609.47 = 180.4735 kg/cm2 180.4735


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟏𝟖𝟓.𝟕𝟑) =
/𝟏𝟗 = 3.13 9.77530815789472

δ'bk = δ'bm - 1.64 s = 180.47 - 1.64 x 3.13 = 175.34 kg/cm2 175.3403 5.1332

V = S X 100 % = 3.13 x 100 % = 1.73% 1.73432664629433


δ'bm 180.47

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 7/15/2019 3 SALURAN BETON 185.46 180.323 5.14 26.39

2 7/15/2019 3 ZONA 2 182.37 180.323 2.05 4.19

3 7/15/2019 3 SP.0-SP1 179.28 180.323 -1.04 1.09


4 7/15/2019 3 177.73 180.323 -2.59 6.72

5 7/19/2019 7 180.83 180.323 0.51 0.26

6 7/19/2019 7 176.85 180.323 -3.47 12.06


7 7/19/2019 7 177.84 180.323 -2.48 6.17
8 7/19/2019 7 178.84 180.323 -1.48 2.20

9 7/16/2019 3 183.92 180.323 3.60 12.94

10 7/16/2019 3 179.28 180.323 -1.04 1.09

11 7/16/2019 3 183.92 180.323 3.60 12.94

12 7/16/2019 3 187.01 180.323 6.69 44.72

13 7/20/2019 7 176.85 180.323 -3.47 12.06

14 7/20/2019 7 178.84 180.323 -1.48 2.20

15 7/20/2019 7 177.84 180.323 -2.48 6.17


16 7/20/2019 7 177.84 180.323 -2.48 6.17
17 7/18/2019 3 179.28 180.323 -1.04 1.09

18 7/18/2019 3 176.19 180.323 -4.13 17.08

19 7/18/2019 3 180.83 180.323 0.51 0.26


20 7/18/2019 3 185.46 180.323 5.14 26.39

Jumlah 3606.46 202.16

δ'bm = Σσbi = 3606.46 = 180.323 kg/cm2 180.323


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟎𝟐.𝟏𝟔) =
/𝟏𝟗 = 3.26 10.6400747368421

δ'bk = δ'bm - 1.64 s = 180.323 - 1.64 x 3.26 = 174.98 kg/cm2 174.9766 5.3464

V = S X 100 % = 3.26 x 100 % = 1.81% 1.80786699422703


δ'bm 180.323

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 5/13/2019 3 SALURAN GENDONG 179.28 181.064 -1.78 3.18

2 5/13/2019 3 ZONA 2 183.92 181.064 2.86 8.16

3 5/13/2019 3 SAL. TERBUKA 180.83 181.064 -0.23 0.05


4 5/13/2019 3 185.46 181.064 4.40 19.33

5 5/17/2019 7 175.86 181.064 -5.20 27.08

6 5/17/2019 7 177.84 181.064 -3.22 10.39


7 5/17/2019 7 180.83 181.064 -0.23 0.05
8 5/17/2019 7 178.84 181.064 -2.22 4.94

9 5/15/2019 3 180.83 181.064 -0.23 0.05

10 5/15/2019 3 185.46 181.064 4.40 19.33

11 5/15/2019 3 188.55 181.064 7.49 56.05

12 5/15/2019 3 183.92 181.064 2.86 8.16

13 5/19/2019 7 179.83 181.064 -1.23 1.52

14 5/19/2019 7 178.84 181.064 -2.22 4.94

15 5/19/2019 7 177.84 181.064 -3.22 10.39


16 5/19/2019 7 179.83 181.064 -1.23 1.52
17 5/17/2019 3 180.83 181.064 -0.23 0.05

18 5/17/2019 3 177.73 181.064 -3.33 11.11

19 5/17/2019 3 183.92 181.064 2.86 8.16


20 5/17/2019 3 180.83 181.064 -0.23 0.05

Jumlah 3621.27 194.54

δ'bm = Σσbi = 3621.27 = 181.0635 kg/cm2 181.0635


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟏𝟗𝟒.𝟓𝟒) =
/𝟏𝟗 = 3.20 10.2389397368421

δ'bk = δ'bm - 1.64 s = 181.064 - 1.64 x 3.20 = 175.816 kg/cm2 175.8155 5.248

V = S X 100 % = 3.2 x 100 % = 1.77% 1.76733576894294


δ'bm 181.064

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 6/15/2019 3 SALURAN KANTONG 182.37 181.175 1.20 1.43

2 6/15/2019 3 LUMPUR 177.73 181.175 -3.44 11.86

3 6/15/2019 3 TERBUKA 179.28 181.175 -1.89 3.59


4 6/15/2019 3 187.01 181.175 5.84 34.05

5 6/19/2019 7 175.86 181.175 -5.31 28.24

6 6/19/2019 7 178.84 181.175 -2.33 5.45


7 6/19/2019 7 180.83 181.175 -0.34 0.12
8 6/19/2019 7 176.85 181.175 -4.32 18.70

9 6/22/2019 7 180.83 181.175 -0.34 0.12

10 6/22/2019 7 187.01 181.175 5.84 34.05

11 6/22/2019 7 188.55 181.175 7.38 54.40

12 6/22/2019 7 183.92 181.175 2.75 7.54

13 6/20/2019 3 178.84 181.175 -2.33 5.45

14 6/20/2019 3 180.83 181.175 -0.34 0.12

15 6/20/2019 3 176.85 181.175 -4.32 18.70


16 6/20/2019 3 176.85 181.175 -4.32 18.70
17 6/24/2019 7 179.28 181.175 -1.89 3.59

18 6/24/2019 7 183.92 181.175 2.75 7.54

19 6/24/2019 7 187.01 181.175 5.84 34.05


20 6/24/2019 7 180.83 181.175 -0.34 0.12

Jumlah 3623.49 287.83

δ'bm = Σσbi = 3623.49 = 181.1745 kg/cm2 181.1745


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟖𝟕.𝟖𝟑) =
/𝟏𝟗 = 3.89 15.1487944736842

δ'bk = δ'bm - 1.64 s = 181.175 - 1.64 x 3.89 = 174.795 kg/cm2 174.7949 6.3796

V = S X 100 % = 3.89 x 100 % = 2.15% 2.14710127528984


δ'bm 181.175

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 7/8/2019 3 TALANG RBK 2L 183.92 182.305 1.62 2.61

2 7/8/2019 3 SALURAN TEGAK 191.64 182.305 9.34 87.15

3 7/8/2019 3 TERBUKA 187.01 182.305 4.71 22.14


4 7/8/2019 3 182.37 182.305 0.07 0.00

5 7/12/2019 7 177.84 182.305 -4.46 19.93

6 7/12/2019 7 175.86 182.305 -6.44 41.53


7 7/12/2019 7 180.83 182.305 -1.47 2.17
8 7/12/2019 7 178.84 182.305 -3.46 12.00

9 7/11/2019 3 179.28 182.305 -3.02 9.15

10 7/11/2019 3 185.46 182.305 3.16 9.96

11 7/11/2019 3 182.37 182.305 0.07 0.00

12 7/11/2019 3 188.55 182.305 6.25 39.01

13 7/15/2019 7 175.86 182.305 -6.44 41.53

14 7/15/2019 7 178.84 182.305 -3.46 12.00

15 7/15/2019 7 180.83 182.305 -1.47 2.17


16 7/15/2019 7 177.84 182.305 -4.46 19.93
17 7/14/2019 3 188.55 182.305 6.25 39.01

18 7/14/2019 3 182.37 182.305 0.07 0.00

19 7/14/2019 3 185.46 182.305 3.16 9.96


20 7/14/2019 3 182.37 182.305 0.07 0.00

Jumlah 3646.09 370.28

δ'bm = Σσbi = 3646.09 = 182.3045 kg/cm2 182.3045


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟑𝟕𝟎.𝟐𝟖) =
/𝟏𝟗 = 4.41 19.4881734210526

δ'bk = δ'bm - 1.64 s = 182.305 - 1.64 x 4.41 = 175.07 kg/cm2 175.0721 7.2324

V = S X 100 % = 4.41 x 100 % = 2.42% 2.4190297003091


δ'bm 182.305

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 5/8/2019 3 TALANG RBK 2L 183.92 181.140 2.78 7.73

2 5/8/2019 3 180.83 181.140 -0.31 0.10

3 5/8/2019 3 188.55 181.140 7.41 54.91


4 5/8/2019 3 185.46 181.140 4.32 18.66

5 5/8/2019 3 180.83 181.140 -0.31 0.10

6 5/12/2019 7 176.85 181.140 -4.29 18.40


7 5/12/2019 7 177.84 181.140 -3.30 10.89
8 5/12/2019 7 176.85 181.140 -4.29 18.40

9 5/12/2019 7 180.83 181.140 -0.31 0.10

10 5/12/2019 7 182.81 181.140 1.67 2.79

11 5/19/2019 14 179.4 181.140 -1.74 3.03

12 5/19/2019 14 180.98 181.140 -0.16 0.03

13 5/19/2019 14 183.35 181.140 2.21 4.88

14 5/19/2019 14 181.77 181.140 0.63 0.40

15 5/19/2019 14 184.93 181.140 3.79 14.36


16 5/26/2019 21 178.94 181.140 -2.20 4.84
17 5/26/2019 21 177.49 181.140 -3.65 13.32

18 5/26/2019 21 180.39 181.140 -0.75 0.56

19 5/26/2019 21 181.84 181.140 0.70 0.49


20 5/26/2019 21 178.94 181.140 -2.20 4.84

Jumlah 3622.8 178.83

δ'bm = Σσbi = 3622.8 = 181.14 kg/cm2 181.14


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟏𝟕𝟖.𝟖𝟑) =
/𝟏𝟗 = 3.07 9.41197894736844

δ'bk = δ'bm - 1.64 s = 181.14 - 1.64 x 3.07 = 176.11 kg/cm2 176.1052 5.0348

V = S X 100 % = 3.07 x 100 % = 1.69% 1.69482168488462


δ'bm 181.14

KESIMPULAN :
Hasil evaluasi concrete mutu beton K-175 memenuhi syarat
minimum yang diijinkan.

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 6/15/2019 3 TALANG RBK 1A 182.37 180.999 1.37 1.88

2 6/15/2019 3 179.28 180.999 -1.72 2.95

3 6/15/2019 3 187.01 180.999 6.01 36.14


4 6/15/2019 3 182.37 180.999 1.37 1.88

5 6/19/2019 7 176.85 180.999 -4.15 17.21

6 6/19/2019 7 176.85 180.999 -4.15 17.21


7 6/19/2019 7 182.81 180.999 1.81 3.28
8 6/19/2019 7 179.83 180.999 -1.17 1.37

9 6/26/2019 14 180.19 180.999 -0.81 0.65

10 6/26/2019 14 178.61 180.999 -2.39 5.70

11 6/26/2019 14 182.56 180.999 1.56 2.44

12 6/26/2019 14 181.77 180.999 0.77 0.60

13 6/22/2019 14 188.55 180.999 7.55 57.03

14 6/22/2019 14 183.92 180.999 2.92 8.54

15 6/22/2019 28 179.28 180.999 -1.72 2.95


16 6/22/2019 28 182.37 180.999 1.37 1.88
17 6/26/2019 3 179.83 180.999 -1.17 1.37

18 6/26/2019 3 177.84 180.999 -3.16 9.98

19 6/26/2019 7 175.86 180.999 -5.14 26.40


20 6/26/2019 7 181.82 180.999 0.82 0.67

Jumlah 3619.97 200.13

δ'bm = Σσbi = 3619.97 = 180.9985 kg/cm2 180.9985


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟎𝟎.𝟏𝟑) =
/𝟏𝟗 = 3.24 10.5330344736842

δ'bk = δ'bm - 1.64 s = 180.99 - 1.64 x 3.24 = 175.68 kg/cm2 175.6849 5.3136

V = S X 100 % = 3.24 x 100 % = 1.79% 1.79007008345373


δ'bm 180.99

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 8/20/2018 3 Gorong - Gorong 203.4 190.050 13.35 178.22

2 8/20/2018 3 2K 206.9 190.050 16.85 283.92

3 8/24/2018 7 178.7 190.050 -11.35 128.82


4 8/24/2018 7 182.9 190.050 -7.15 51.12

5 8/31/2018 14 179.4 190.050 -10.65 113.42

6 8/31/2018 14 182.6 190.050 -7.45 55.50


7 9/7/2018 21 179.4 190.050 -10.65 113.42
8 9/7/2018 21 184.5 190.050 -5.55 30.80

9 9/15/2018 28 176.7 190.050 -13.35 178.22

10 9/15/2018 28 182.2 190.050 -7.85 61.62

11 8/26/2018 3 206.9 190.050 16.85 283.92

12 8/26/2018 3 212.1 190.050 22.05 486.20

13 9/6/2018 14 178.6 190.050 -11.45 131.10

14 9/6/2018 14 184.9 190.050 -5.15 26.52

15 9/20/2018 28 183.6 190.050 -6.45 41.60


16 9/20/2018 28 180.8 190.050 -9.25 85.56
17 9/15/2018 3 213.9 190.050 23.85 568.82

18 9/15/2018 3 206.9 190.050 16.85 283.92

19 9/19/2018 7 187.2 190.050 -2.85 8.12


20 9/19/2018 7 189.4 190.050 -0.65 0.42

Jumlah 3801 3111.29

δ'bm = Σσbi = 3801 = 190.05 kg/cm2


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟑𝟏𝟏𝟏.𝟐 =
𝟗)/𝟏𝟗 = 12.80

δ'bk = δ'bm - 1.64 s = 190.050 - 1.64 x 12.80 = 169.058 kg/cm2

V = S X 100 % = 12.8 x 100 % = 6.74%


δ'bm 190.05

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( ) ( ) ( )
EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 11/5/2018 3 Saluran Zona 2 199.9 189.402 10.50 110.21

2 11/5/2018 3 205.2 189.402 15.80 249.58

3 11/9/2018 7 178.7 189.402 -10.70 114.53


4 11/6/2018 3 203.4 189.402 14.00 195.94

5 11/6/2018 3 208.6 189.402 19.20 368.56

6 11/10/2018 7 180.8 189.402 -8.60 73.99


7 11/7/2018 3 205.2 189.402 15.80 249.58
8 11/7/2018 3 198.2 189.402 8.80 77.40

9 11/11/2018 7 175.5 189.402 -13.90 193.27

10 11/8/2018 3 177.3 189.402 -12.10 146.46

11 11/8/2018 3 184.3 189.402 -5.10 26.03

12 11/12/2018 7 178.7 189.402 -10.70 114.53

13 11/9/2018 3 189.5 189.402 0.10 0.01

14 11/9/2018 3 179.1 189.402 -10.30 106.13

15 11/13/2018 7 180.8 189.402 -8.60 73.99


16 11/10/2018 3 186.04 189.402 -3.36 11.30
17 11/10/2018 3 192.9 189.402 3.50 12.24

18 11/14/2018 7 179.7 189.402 -9.70 94.13

19 11/11/2018 3 189.5 189.402 0.10 0.01


20 11/11/2018 3 194.7 189.402 5.30 28.07

Jumlah 3788.04 2245.97

δ'bm = Σσbi = 3788.04 = 189.402 kg/cm2


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟐𝟒𝟓.𝟗 =
𝟕)/𝟏𝟗 = 10.87

δ'bk = δ'bm - 1.64 s = 189.402 - 1.64 x 10.87 = 171.58 kg/cm2

V = S X 100 % = 10.87 x 100 % = 5.74%


δ'bm 189.402

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( ) ( ) ( )
EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 12/4/2018 3 TEROWONGAN 1 233.72 230.646 3.07 9.45

2 12/4/2018 3 SP 198-202 230.7 230.646 0.05 0.00

3 12/4/2018 3 228.68 230.646 -1.97 3.87


4 12/4/2018 3 231.7 230.646 1.05 1.11

5 12/5/2018 3 229.69 230.646 -0.96 0.91

6 12/5/2018 3 227.67 230.646 -2.98 8.86


7 12/5/2018 3 232.71 230.646 2.06 4.26
8 12/5/2018 3 229.69 230.646 -0.96 0.91

9 5/6/2018 3 230.7 230.646 0.05 0.00

10 5/6/2018 3 234.73 230.646 4.08 16.68

11 5/6/2018 3 231.7 230.646 1.05 1.11

12 5/6/2018 3 235.73 230.646 5.08 25.85

13 5/7/2018 3 229.69 230.646 -0.96 0.91

14 5/7/2018 3 228.68 230.646 -1.97 3.87

15 5/7/2018 3 226.67 230.646 -3.98 15.81


16 5/7/2018 3 228.68 230.646 -1.97 3.87
17 5/8/2018 3 230.7 230.646 0.05 0.00

18 5/8/2018 3 232.71 230.646 2.06 4.26

19 5/8/2018 3 229.69 230.646 -0.96 0.91


20 5/8/2018 3 228.68 230.646 -1.97 3.87

Jumlah 4612.92 106.51

δ'bm = Σσbi = 4612.92 = 230.646 kg/cm2 230.646


n 20
5.61

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) = 3.89 226.76


√(𝟏𝟎𝟔.𝟓𝟏)/
2.37 5.60567789473684
𝟏𝟗 =
1.03

δ'bk = δ'bm - 1.64 s = 230.646 - 1.64 x 2.37 = 226.76 kg/cm2 226.7592 3.8868

V = S X 100 % = 2.37 x 100 % = 1.03% 1.027549


δ'bm 230.646

KESIMPULAN :
Hasil evaluasi concrete mutu beton K-225 memenuhi syarat
minimum yang diijinkan.

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 225
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 9/24/2018 3 TEROWONGAN 1 230.81 230.148 0.66 0.44

2 9/24/2018 3 SP 203 233.72 230.148 3.57 12.76

3 9/24/2018 3 228.68 230.148 -1.47 2.15


4 9/24/2018 3 227.67 230.148 -2.48 6.14

5 9/25/2018 3 229.69 230.148 -0.46 0.21

6 9/25/2018 3 231.7 230.148 1.55 2.41


7 9/25/2018 3 227.67 230.148 -2.48 6.14
8 9/25/2018 3 227.67 230.148 -2.48 6.14

9 9/26/2018 3 232.71 230.148 2.56 6.57

10 9/26/2018 3 231.7 230.148 1.55 2.41

11 9/26/2018 3 230.7 230.148 0.55 0.31

12 9/26/2018 3 228.68 230.148 -1.47 2.15

13 9/27/2018 3 232.71 230.148 2.56 6.57

14 9/27/2018 3 230.7 230.148 0.55 0.31

15 9/27/2018 3 229.69 230.148 -0.46 0.21


16 9/27/2018 3 233.72 230.148 3.57 12.76
17 9/28/2018 3 227.67 230.148 -2.48 6.14

18 9/28/2018 3 229.69 230.148 -0.46 0.21

19 9/28/2018 3 230.7 230.148 0.55 0.31


20 9/28/2018 3 226.67 230.148 -3.48 12.09

Jumlah 4602.95 86.41

δ'bm = Σσbi = 4602.95 = 230.1475 kg/cm2


n 20
4.55

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) = 3.49 226.65


√(𝟖𝟔.𝟒𝟏)/𝟏
2.13
𝟗=
0.93

δ'bk = δ'bm - 1.64 s = 230.1475 - 1.64 x 2.13 = 226.65 kg/cm2

V = S X 100 % = 4.55 x 100 % = 0.93%


δ'bm 230.1475

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K225
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 11/5/2018 3 TEROWONGAN 1 226.67 230.696 -4.03 16.21

2 11/5/2018 3 SP 202 227.67 230.696 -3.03 9.16

3 11/5/2018 3 229.69 230.696 -1.01 1.01


4 11/5/2018 3 226.67 230.696 -4.03 16.21

5 11/6/2018 3 232.71 230.696 2.01 4.06

6 11/6/2018 3 235.73 230.696 5.03 25.34


7 11/6/2018 3 230.7 230.696 0.00 0.00
8 11/6/2018 3 231.7 230.696 1.00 1.01

9 11/7/2018 3 233.72 230.696 3.02 9.14

10 11/7/2018 3 231.7 230.696 1.00 1.01

11 11/7/2018 3 230.7 230.696 0.00 0.00

12 11/7/2018 3 229.69 230.696 -1.01 1.01

13 11/8/2018 3 233.72 230.696 3.02 9.14

14 11/8/2018 3 230.7 230.696 0.00 0.00

15 11/8/2018 3 231.7 230.696 1.00 1.01


16 11/8/2018 3 235.73 230.696 5.03 25.34
17 11/9/2018 3 228.68 230.696 -2.02 4.06

18 11/9/2018 3 230.7 230.696 0.00 0.00

19 11/9/2018 3 227.67 230.696 -3.03 9.16


20 11/9/2018 3 227.67 230.696 -3.03 9.16

Jumlah 4613.92 142.03

δ'bm = Σσbi = 4613.92 = 230.696 kg/cm2


n 20
7.48

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) = 12.27 218.43


√(𝟏𝟒𝟐.𝟎𝟑)/
7.48
𝟏𝟗 =
3.24

δ'bk = δ'bm - 1.64 s = 230.696 - 1.64 x 7.48 = 218.43 kg/cm2

V = S X 100 % = 7.48 x 100 % = 3.24%


δ'bm 230.696

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 300
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 12/11/2018 3 KONDUIT TANJU 304.3 308.370 -4.07 16.56

2 12/14/2018 3 307.7 308.370 -0.67 0.45

3 12/12/2018 3 314.7 308.370 6.33 40.07


4 12/15/2018 3 312.9 308.370 4.53 20.52

5 12/19/2018 7 304.9 308.370 -3.47 12.04

6 12/13/2018 3 304.3 308.370 -4.07 16.56


7 12/16/2018 3 302.5 308.370 -5.87 34.46
8 12/17/2018 3 306 308.370 -2.37 5.62

9 12/20/2018 3 309.5 308.370 1.13 1.28

10 12/18/2018 3 312.9 308.370 4.53 20.52

11 12/19/2018 3 306 308.370 -2.37 5.62

12 12/22/2018 3 307.7 308.370 -0.67 0.45

13 12/23/2018 3 312.9 308.370 4.53 20.52

14 12/26/2018 3 302.5 308.370 -5.87 34.46

15 12/24/2018 3 304.3 308.370 -4.07 16.56


16 12/25/2018 3 306 308.370 -2.37 5.62
17 12/27/2018 3 316.4 308.370 8.03 64.48

18 12/28/2018 3 311.2 308.370 2.83 8.01

19 12/29/2018 3 316.4 308.370 8.03 64.48


20 12/30/2018 3 304.3 308.370 -4.07 16.56

Jumlah 6167.4 404.84

δ'bm = Σσbi = 6167.4 = 308.37 kg/cm2


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟒𝟎𝟒.𝟖𝟒)/
4.62
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 308.37 - 1.64 x 4.62 = 300.79 kg/cm2

V = S X 100 % = 4.62 x 100 % = 1.50%


δ'bm 308.37

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( SAHWAN ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : K300
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 7/24/2019 3 KONDUIT TANJU 302.92 308.147 -5.23 27.32

2 7/24/2019 3 55-62 307.56 308.147 -0.59 0.34

3 7/24/2019 3 304.46 308.147 -3.69 13.59


4 7/24/2019 3 312.19 308.147 4.04 16.35

5 7/26/2019 3 310.65 308.147 2.50 6.27

6 7/26/2019 3 306.01 308.147 -2.14 4.56


7 7/26/2019 3 304.46 308.147 -3.69 13.59
8 7/26/2019 3 315.28 308.147 7.13 50.89

9 7/28/2019 7 304.02 308.147 -4.13 17.03

10 7/28/2019 7 307.01 308.147 -1.14 1.29

11 7/28/2019 7 308.99 308.147 0.84 0.71

12 7/28/2019 7 305.02 308.147 -3.13 9.78

13 7/20/2019 7 312.19 308.147 4.04 16.35

14 7/20/2019 3 306.01 308.147 -2.14 4.56

15 7/20/2019 3 302.92 308.147 -5.23 27.32


16 7/20/2019 3 313.74 308.147 5.59 31.29
17 7/22/2019 3 310.65 308.147 2.50 6.27

18 7/22/2019 3 315.28 308.147 7.13 50.89

19 7/22/2019 3 307.56 308.147 -0.59 0.34


20 7/22/2019 3 306.01 308.147 -2.14 4.56

Jumlah 6162.93 303.30

δ'bm = Σσbi = 6162.93 = 308.1465 kg/cm2 308.15


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟑𝟎𝟑.𝟑𝟎)/
3.99 15.96
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 308.15 - 1.64 x 3.99 = 301.6 kg/cm2 301.6029 6.5436

V = S X 100 % = 3.99 x 100 % = 1.29% 1.29483865628849


δ'bm 308.15

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 300
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 2/8/2019 3 KONDUIT TANJU 304.47 306.010 -1.54 2.37

2 2/8/2019 3 62-66 307.56 306.010 1.55 2.40

3 2/12/2019 7 306.01 306.010 0.00 0.00


4 2/12/2019 7 304.02 306.010 -1.99 3.96

5 2/12/2019 7 308.99 306.010 2.98 8.88

6 2/21/2019 14 301.9 306.010 -4.11 16.89


7 2/21/2019 14 303.48 306.010 -2.53 6.40
8 2/21/2019 14 307.43 306.010 1.42 2.02

9 2/28/2019 21 303.55 306.010 -2.46 6.05

10 2/28/2019 21 305.75 306.010 -0.26 0.07

11 2/17/2019 7 307.01 306.010 1.00 1.00

12 2/17/2019 7 304.02 306.010 -1.99 3.96

13 2/17/2019 7 307.01 306.010 1.00 1.00

14 2/24/2019 14 303.48 306.010 -2.53 6.40

15 2/24/2019 14 305.85 306.010 -0.16 0.03


16 2/16/2019 3 312.19 306.010 6.18 38.20
17 2/16/2019 3 304.47 306.010 -1.54 2.37

18 2/20/2019 7 305.02 306.010 -0.99 0.98

19 2/20/2019 7 308.99 306.010 2.98 8.88


20 2/20/2019 7 308.99 306.010 2.98 8.88

Jumlah 6120.19 120.73

δ'bm = Σσbi = 6120.19 = 306.0095 kg/cm2 306.01


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟏𝟐𝟎.𝟕𝟑)/ 2.52 6.35
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 306.01 - 1.64 x 2.52 = 301.88 kg/cm2 301.8767 4.1328

V = S X 100 % = 2.52 x 100 % = 0.82% 0.8235


δ'bm 306.01

KESIMPULAN :
Hasil evaluasi concrete mutu beton K-300 memenuhi syarat
minimum yang diijinkan.

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 300
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 1/3/2019 3 KONDUIT TANJU 302.92 304.240 -1.32 1.74

2 1/3/2019 3 66-77 307.56 304.240 3.32 11.03

3 1/3/2019 3 301.38 304.240 -2.86 8.18


4 1/7/2019 7 303.03 304.240 -1.21 1.46

5 1/7/2019 7 305.02 304.240 0.78 0.61

6 1/7/2019 7 305.02 304.240 0.78 0.61


7 1/17/2019 14 301.11 304.240 -3.13 9.79
8 1/17/2019 14 303.48 304.240 -0.76 0.58

9 1/17/2019 14 305.06 304.240 0.82 0.67

10 2/3/2019 28 302.53 304.240 -1.71 2.92

11 2/3/2019 28 304.62 304.240 0.38 0.14

12 2/3/2019 28 303.23 304.240 -1.01 1.02

13 1/7/2019 3 306.01 304.240 1.77 3.13

14 1/7/2019 3 307.56 304.240 3.32 11.03

15 1/7/2019 3 301.38 304.240 -2.86 8.18


16 1/14/2019 7 307.01 304.240 2.77 7.68
17 1/14/2019 7 304.02 304.240 -0.22 0.05

18 1/14/2019 7 308 304.240 3.76 14.14

19 1/9/2019 3 301.38 304.240 -2.86 8.18


20 1/9/2019 3 304.47 304.240 0.23 0.05

Jumlah 6084.79 91.19

δ'bm = Σσbi = 6084.79 = 304.2395 kg/cm2 304.24


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟗𝟏.𝟏𝟗)/𝟏
2.19 4.80
𝟗=

δ'bk = δ'bm - 1.64 s = 304.24 - 1.64 x 2.19 = 300.65 kg/cm2 300.6479 3.5916

V = S X 100 % = 2.19 x 100 % = 0.72% 0.71982763579351


δ'bm 304.24

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 300
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 1/8/2019 3 Saluran Zona 2 176.19 184.479 -8.29 68.71

2 1/8/2019 3 G1-G30 185.46 184.479 0.98 0.96

3 1/8/2019 3 182.37 184.479 -2.11 4.45


4 1/12/2019 7 185.79 184.479 1.31 1.72

5 1/12/2019 7 181.82 184.479 -2.66 7.07

6 1/12/2019 7 183.81 184.479 -0.67 0.45


7 1/9/2019 3 188.55 184.479 4.07 16.57
8 1/9/2019 3 183.92 184.479 -0.56 0.31

9 1/9/2019 3 185.46 184.479 0.98 0.96

10 1/13/2019 7 180.83 184.479 -3.65 13.32

11 1/13/2019 7 184.8 184.479 0.32 0.10

12 1/13/2019 7 179.83 184.479 -4.65 21.61

13 1/10/2019 3 191.64 184.479 7.16 51.28

14 1/10/2019 3 188.55 184.479 4.07 16.57

15 1/10/2019 3 185.46 184.479 0.98 0.96


16 1/14/2019 7 181.82 184.479 -2.66 7.07
17 1/14/2019 7 179.83 184.479 -4.65 21.61

18 1/14/2019 7 184.8 184.479 0.32 0.10

19 1/11/2019 3 191.64 184.479 7.16 51.28


20 1/11/2019 3 187.01 184.479 2.53 6.41

Jumlah 3689.58 291.52

δ'bm = Σσbi = 3689.58 = 184.479 kg/cm2


n 20

15.34

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟗𝟏.𝟓𝟐) =
/𝟏𝟗 = 3.92

δ'bk = δ'bm - 1.64 s = 184.48 - 1.64 x 3.92 = 178.05 kg/cm2

178.0502 6.4288
V = S X 100 % = 3.92 x 100 % = 2.13%
δ'bm 184.48 2.12490310550252

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON : 175
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 1/20/2019 3 Saluran Zona 2 179.3 183.118 -3.82 14.57

2 1/20/2019 3 C1-C27 182.37 183.118 -0.75 0.56

3 1/20/2019 3 183.92 183.118 0.80 0.64


4 1/24/2019 7 182.81 183.118 -0.31 0.09

5 1/24/2019 7 180.83 183.118 -2.29 5.23

6 1/24/2019 7 177.84 183.118 -5.28 27.85


7 1/21/2019 3 188.55 183.118 5.43 29.51
8 1/21/2019 3 183.92 183.118 0.80 0.64

9 1/21/2019 3 188.55 183.118 5.43 29.51

10 1/25/2019 7 183.81 183.118 0.69 0.48

11 1/25/2019 7 177.84 183.118 -5.28 27.85

12 1/25/2019 7 181.82 183.118 -1.30 1.68

13 1/22/2019 3 188.55 183.118 5.43 29.51

14 1/22/2019 3 182.37 183.118 -0.75 0.56

15 1/22/2019 3 182.37 183.118 -0.75 0.56


16 1/26/2019 7 180.83 183.118 -2.29 5.23
17 1/26/2019 7 183.81 183.118 0.69 0.48

18 1/26/2019 7 178.84 183.118 -4.28 18.30

19 1/23/2019 3 183.92 183.118 0.80 0.64


20 1/23/2019 3 190.1 183.118 6.98 48.76

Jumlah 3662.35 242.68

δ'bm = Σσbi = 3662.35 = 183.1175 kg/cm2


n 20

12.77

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏)


√(𝟐𝟒𝟐.𝟔𝟖) =
/𝟏𝟗 = 3.57

δ'bk = δ'bm - 1.64 s = 183.12 - 1.64 x 3.57 = 177.26 kg/cm2

177.2627 5.8548
V = S X 100 % = 3.57 x 100 % = 1.95%
δ'bm 183.12 1.94956790039182

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M.FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 2/18/2019 3 TEROWONGAN 2 253.87 254.622 -0.75 0.57

2 2/18/2019 3 T202-T209 255.88 254.622 1.26 1.58

3 2/18/2019 3 252.86 254.622 -1.76 3.10


4 2/18/2019 3 256.89 254.622 2.27 5.14

5 2/19/2019 3 251.85 254.622 -2.77 7.68

6 2/19/2019 3 254.87 254.622 0.25 0.06


7 2/19/2019 3 255.88 254.622 1.26 1.58
8 2/19/2019 3 252.86 254.622 -1.76 3.10

9 2/20/2019 3 255.88 254.622 1.26 1.58

10 2/20/2019 3 253.87 254.622 -0.75 0.57

11 2/20/2019 3 251.85 254.622 -2.77 7.68

12 2/20/2019 3 257.9 254.622 3.28 10.75

13 2/21/2019 3 252.86 254.622 -1.76 3.10

14 2/21/2019 3 256.89 254.622 2.27 5.14

15 2/21/2019 3 254.87 254.622 0.25 0.06


16 2/21/2019 3 251.85 254.622 -2.77 7.68
17 2/22/2019 3 254.87 254.622 0.25 0.06

18 2/22/2019 3 257.9 254.622 3.28 10.75

19 2/22/2019 3 252.86 254.622 -1.76 3.10


20 2/22/2019 3 255.88 254.622 1.26 1.58

Jumlah 5092.44 74.89

δ'bm = Σσbi = 5092.44 = 254.622 kg/cm2 254.62


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟕𝟒.𝟖𝟗)/𝟏
1.98 3.94
𝟗=

δ'bk = δ'bm - 1.64 s = 254.622 - 1.64 x 1.98 = 251.37 kg/cm2 251.3748 3.2472

V = S X 100 % = 8.65 x 100 % = 0.78% 0.7776233004218


δ'bm 254.622

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 1/13/2019 3 TEROWONGAN 2 254.87 258.096 -3.23 10.41

2 1/13/2019 3 SHOTCRET T 194 258.9 258.096 0.80 0.65

3 1/13/2019 3 262.93 258.096 4.83 23.37


4 1/13/2019 3 264.95 258.096 6.85 46.98

5 1/14/2019 3 258.9 258.096 0.80 0.65

6 1/14/2019 3 256.89 258.096 -1.21 1.45


7 1/14/2019 3 262.93 258.096 4.83 23.37
8 1/14/2019 3 254.87 258.096 -3.23 10.41

9 1/15/2019 3 257.89 258.096 -0.21 0.04

10 1/15/2019 3 260.92 258.096 2.82 7.97

11 1/15/2019 3 252.86 258.096 -5.24 27.42

12 1/15/2019 3 260.92 258.096 2.82 7.97

13 1/16/2019 3 255.88 258.096 -2.22 4.91

14 1/16/2019 3 255.88 258.096 -2.22 4.91

15 1/16/2019 3 254.87 258.096 -3.23 10.41


16 1/16/2019 3 253.87 258.096 -4.23 17.86
17 1/17/2019 3 259.9 258.096 1.80 3.25

18 1/17/2019 3 260.92 258.096 2.82 7.97

19 1/17/2019 3 256.89 258.096 -1.21 1.45


20 1/17/2019 3 255.88 258.096 -2.22 4.91

Jumlah 5161.92 216.36

δ'bm = Σσbi = 5161.92 = 258.096 kg/cm2 258.10


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟐𝟓𝟖.𝟏𝟎)/
3.37 11.39
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 258.10 - 1.64 x 3.37 = 252.57 kg/cm2 252.5692 5.5268

V = S X 100 % = 3.37 x 100 % = 1.31% 1.30571570268427


δ'bm 258.1

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 4/10/2019 3 TEROWONGAN 2 258.9 255.831 3.07 9.42

2 4/10/2019 3 SHOTCRET FACE 255.88 255.831 0.05 0.00

3 4/10/2019 3 OUTLET 257.9 255.831 2.07 4.28


4 4/10/2019 3 257.9 255.831 2.07 4.28

5 4/11/2019 3 253.87 255.831 -1.96 3.84

6 4/11/2019 3 255.88 255.831 0.05 0.00


7 4/11/2019 3 256.89 255.831 1.06 1.12
8 4/11/2019 3 251.85 255.831 -3.98 15.84

9 4/12/2019 3 254.87 255.831 -0.96 0.92

10 4/12/2019 3 250.84 255.831 -4.99 24.91

11 4/12/2019 3 254.87 255.831 -0.96 0.92

12 4/12/2019 3 256.89 255.831 1.06 1.12

13 4/13/2019 3 258.9 255.831 3.07 9.42

14 4/13/2019 3 255.88 255.831 0.05 0.00

15 4/13/2019 3 252.86 255.831 -2.97 8.82


16 4/13/2019 3 254.87 255.831 -0.96 0.92
17 4/14/2019 3 256.89 255.831 1.06 1.12

18 4/14/2019 3 253.87 255.831 -1.96 3.84

19 4/14/2019 3 257.9 255.831 2.07 4.28


20 4/14/2019 3 258.9 255.831 3.07 9.42

Jumlah 5116.61 104.52

δ'bm = Σσbi = 5116.61 = 255.8305 kg/cm2 255.83


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟏𝟎𝟒.𝟓𝟐)/
2.35 5.50
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 255.83 - 1.64 x 2.35 = 251.98 kg/cm2 251.9765 3.854

V = S X 100 % = 2.35 x 100 % = 0.92% 0.9185769484092


δ'bm 255.83

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 8/8/2019 3 TEROWONGAN 2 256.89 256.586 0.30 0.09

2 8/8/2019 3 SHOTCRET 253.87 256.586 -2.72 7.38

3 8/8/2019 3 OUTLET 251.85 256.586 -4.74 22.43


4 8/8/2019 3 255.88 256.586 -0.71 0.50

5 8/9/2019 3 254.87 256.586 -1.72 2.94

6 8/9/2019 3 257.9 256.586 1.31 1.73


7 8/9/2019 3 259.91 256.586 3.32 11.05
8 8/9/2019 3 257.9 256.586 1.31 1.73

9 8/10/2019 3 256.89 256.586 0.30 0.09

10 8/10/2019 3 254.87 256.586 -1.72 2.94

11 8/10/2019 3 258.9 256.586 2.31 5.35

12 8/10/2019 3 259.91 256.586 3.32 11.05

13 8/11/2019 3 257.9 256.586 1.31 1.73

14 8/11/2019 3 255.88 256.586 -0.71 0.50

15 8/11/2019 3 252.86 256.586 -3.73 13.88


16 8/11/2019 3 254.87 256.586 -1.72 2.94
17 8/12/2019 3 258.9 256.586 2.31 5.35

18 8/12/2019 3 255.88 256.586 -0.71 0.50

19 8/12/2019 3 256.89 256.586 0.30 0.09


20 8/12/2019 3 258.9 256.586 2.31 5.35

Jumlah 5131.72 97.64

δ'bm = Σσbi = 5131.72 = 256.586 kg/cm2 256.59


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟗𝟕.𝟔𝟒)/𝟏
2.27 5.14
𝟗=

δ'bk = δ'bm - 1.64 s = 256.59 - 1.64 x 2.27 = 252.86 kg/cm2 252.8632 3.7228

V = S X 100 % = 2.27 x 100 % = 0.88% 0.88469363098532


δ'bm 256.59

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )


EVALUASI KUAT TEKAN BETON
Lokasi : TYPE BETON :
Tanggal Umur Hasil Uji Rata - Rata Hasil δ'bi -δ'bm (δ'bi -δ'bm)2
No Pengetesan Beton Lokasi Tekan Beton Uji Tekan Beton Kg/cm2 Kg/cm2 Keterangan
δ'bi kg/cm2 δ'bm kg/cm2

1 1/13/2019 3 TEROWONGAN 2 251.85 256.083 -4.23 17.92

2 1/13/2019 3 SHOTCRET FACE 250.84 256.083 -5.24 27.49

3 1/13/2019 3 INLET 257.89 256.083 1.81 3.27


4 1/13/2019 3 256.89 256.083 0.81 0.65

5 1/14/2019 3 252.86 256.083 -3.22 10.39

6 1/14/2019 3 253.87 256.083 -2.21 4.90


7 1/14/2019 3 253.87 256.083 -2.21 4.90
8 1/14/2019 3 262.93 256.083 6.85 46.88

9 1/15/2019 3 251.85 256.083 -4.23 17.92

10 1/15/2019 3 250.84 256.083 -5.24 27.49

11 1/15/2019 3 256.89 256.083 0.81 0.65

12 1/15/2019 3 253.87 256.083 -2.21 4.90

13 1/16/2019 3 253.87 256.083 -2.21 4.90

14 1/16/2019 3 256.89 256.083 0.81 0.65

15 1/16/2019 3 262.93 256.083 6.85 46.88


16 1/16/2019 3 260.92 256.083 4.84 23.40
17 1/17/2019 3 262.93 256.083 6.85 46.88

18 1/17/2019 3 255.9 256.083 -0.18 0.03

19 1/17/2019 3 254.87 256.083 -1.21 1.47


20 1/17/2019 3 258.9 256.083 2.82 7.94

Jumlah 5121.66 299.49

δ'bm = Σσbi = 5121.66 = 256.083 kg/cm2 256.08


n 20

s =√( 〖𝜮 (𝝈𝒃𝒊 〗 ^ −𝝈𝒃𝒎))/(𝒏−𝟏) =


√(𝟐𝟗𝟗.𝟒𝟗)/
3.97 15.76
𝟏𝟗 =

δ'bk = δ'bm - 1.64 s = 256.08 - 1.64 x 3.97 = 249.57 kg/cm2 249.57384 6.50916

V = S X 100 % = 3.97 x 100 % = 1.55% 1.54988812221038


δ'bm 256.08

Pengawas PU Konsultan Pengawas Kontraktor Pelaksana


PT. Nindya Karya ( Persero )

( JUS ARJULA ) ( ) ( M. FAUZI )