Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

1_2 156.888 -20.405 -152.590 27.678 4297.9 7272.8 106.0 104.5 1.50

1_5 75.516 3.844 -72.753 2.241 2763.2 6085.6 106.0 102.0 4.05

2_3 73.237 3.560 -70.914 1.602 2323.3 5162.4 104.5 101.0 3.50

2_4 56.133 -1.562 -54.456 3.033 1676.8 1470.6 104.5 101.8 2.73

2_5 41.519 1.157 -40.615 -2.085 903.8 -927.9 104.5 102.0 2.55

3_4 -23.286 4.461 23.659 -4.824 373.4 -362.7 101.0 101.8 0.77

4_5 -61.155 15.816 61.669 -14.194 514.3 1622.3 101.8 102.0 0.18

4_7 28.071 -9.689 -28.070 11.392 1.7 1703.1 101.8 106.2 4.38

4_9 16.081 -0.435 -16.080 1.740 1.3 1304.9 101.8 105.6 3.82

5_6 44.099 12.437 -44.094 -8.016 4.4 4421.3 102.0 107.0 5.05

6_11 7.357 3.564 -7.302 -3.448 55.4 116.1 107.0 105.7 1.31

6_12 7.787 2.504 -7.715 -2.354 71.8 149.5 107.0 105.5 1.48

6_13 17.750 7.218 -17.538 -6.801 212.1 417.8 107.0 105.0 1.96

7_8 0.000 -17.174 0.000 17.635 0.0 461.1 106.2 109.0 2.85

7_9 28.070 5.782 -28.070 -4.980 0.0 801.9 106.2 105.6 0.56

9_10 5.224 4.216 -5.211 -4.182 12.9 34.1 105.6 105.1 0.49

9_14 9.424 3.608 -9.308 -3.361 116.1 246.9 105.6 103.6 2.04

10_11 -3.789 -1.618 3.802 1.648 12.6 29.5 105.1 105.7 0.59

12_13 1.615 0.754 -1.609 -0.749 6.3 5.7 105.5 105.0 0.48

13_14 5.647 1.749 -5.592 -1.639 54.1 110.2 105.0 103.6 1.49

13401.4 30125.2