KEY PLAN

Mecca

PROJECT LOCATION

RAFT FOUNDATION
PLB 05 SOUTH SIDE

RAFT FOUNDATION
PLB 05 NORTH

RAFT FOUNDATION
PLB 01 SOUTH SIDE

RAFT FOUNDATION
PLB 01 NORTH SIDE
SIDE
ROOM
PLANT
PLB 05

ROOM
PLANT
PLB 01
WEARING COURSE LIMIT

ENTRY FROM REEM


400 KV JOINT
ABU DHABI
ISLAND TO

L.O.W
STANTEC comments:

SUB-STATION 1

L.O.W
-All screeds are to withstand all movements of the structure under all design
REFER DETAILS
FIRE EXIT STAIR 1
RAFT FOUNDATION
FIRE EXIT STAIR 2
RAFT FOUNDATION

PLB 03
PLANT ROOM
FIRE EXIT STAIR 3
RAFT FOUNDATION

SUB-STATION 3

PLANT ROOM
PLB 02
loads or combination of loads as specified in the Structural Engineer's FIRE EXIT STAIR 6
RAFT FOUNDATION
FIRE EXIT STAIR 5
RAFT FOUNDATION PLB 04
PLANT ROOM
FIRE EXIT STAIR 4
RAFT FOUNDATION

L.O.W
specifications and Deflection/Movement Reports, without any damage,

L.O.W
cracking or breaking up of the screeding.
-All screeds shall accommodate all structural expansion joints and
construction control joints.
-Weight of all screeds, including associated reinforcements, etc. shall be co- NOTES
ordinated with the structural design of the building to ensure that maximum
weights, when wet, are not exceeded. 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER
-Screed build-up shall suit the compressive loads required to BS EN 1991: WISE MENTIONED
Part 1-1. Loads due to floor finishes over the screed shall be accommodated
along with loads imposed during the defined floor usage category in the
system description and maintenance operations. All loads shall be confirmed
and agreed with the Owner's Representative.
-Slip resistance to be considered as per VO.04 LEGEND:-
-Screed finishes to follow the specification on VO.04 Sec M10.2101 -Where
acting as a base for terrazzo flooring the screed shall receive a fiberglass
mesh reinforced crack isolation membrane.
-Comments from RFI SPL-ANC-PLD-RFI-00136 to be incorporated once
the detail are approved
- ANC to adhere to the details in SPL-ACM-COM-LTR-00341 if this option is
not approved by the DA 00302 SL - 600 SL - 600 SL - 600
-Adjust the expansion joint location to accommodate the wall shifting and any updated SSL - 1000 SSL - 1000 SSL - 1000
interior design.
X

SSL - 1000
FFL - 1000
C8 C2 C17 C18 C4

SUBJECT TO SUBJECT TO SL - 600


CLIENT 00302

B
CLIENT SSL - 1000 SUMP PUMP SECTION - A
APPROVAL APPROVAL 1:20@A0
SL - 600
SSL - 1000 SL - 600
SSL - 1000 SL - 1000
SSL - 1000
SL - 650
SSL - 1000

C7 C15 C16 SL - 600


SSL - 1000

FFL - 1000
SL - 600 SSL - 1000
SSL - 1000
WATER
FEATURE
PLANT ROOM
SL - 650 B O H AREA
SSL - 1000 SL - 600 00302
SSL - 1000
A
AHEU
C13 C14 SL - 1000
SL - 600 SSL - 1000 IFC DRAWING REFERENCE
PLANT ROOM SL - 600
SSL - 1000 Drawing Tittle Dwg. No.
SSL - 1000 Rev. Date
FFL - 1000

CORRIDOR
SSL - 1000
00 BOH- FINISHES DRAWING SPL-STC-ARC-DWG-00014A 30.04.2019
OVERALL BASEMENT FLOOR PLAN FOR
00 SPL-STC-ARC-DWG-01100 14.03.2019
BOH LEVEL [-650 & 1000]

COORDINATION BOX
C6
SUMP PUMP PLAN
SL - 600
C11 C12 1:20@A0 NO. DESCRIPTION SIGN

SSL - 1000 DATA ROOM SL - 600 SL - 650


1 STRUCTURAL
SSL - 1000 SSL - 1000 2 ARCHITECTURAL
SL - 600 SL - 600 3 MEP
SSL - 1000 SSL - 1000 4 Technical Manager

SL - 600 NEW 04 ISSUED FOR APPROVAL SJ AT 12.08.2020

SSL - 1000 03 ISSUED FOR APPROVAL RMR AT 11.07.2020


SCREED
EL-600 TSL EXISTING SCREED 02 ISSUED FOR APPROVAL RMR AT 22.01.2020

C5 C9 C10 C3
01 ISSUED FOR APPROVAL RMR AT 08.01.2020
SSL - 1000
FFL - 1000

00 ISSUED FOR APPROVAL RMR AT 23.12.2019


C1 ELEC. ROOM Rev. Description Prepared Checked Date
SL - 600 EL-1.000 SSL
SL - 600 SSL - 1000
SSL - 1000 EMPLOYER
00302 04 SOWWAH SQUARE INVESTMENT LLC
X SL - 600
SSL - 1000

T10 @200mm. EMPLOYER'S REPRESENTATIVE


Chipping required
for connected Doweled 120mm
surfaces
Min: Embedment
04
NEW SCREED
NEW SCREED TAMPED CONCRETE DESIGN ARCHITECT
EL-600 TSL LEAN CONCRETE NEW SCREED EL-600 TSL EXISTING SCREED
EL-650 TSL FINISH
STEP REINFORCEMENT DETAILS
1:20@A0

EL-1.000 SSL EL-1.000 SSL 4mm SAW CUT 20mm THICK APPROVED
TØ10mm PROJECT & COST MANAGEMENT CONSULTANT
FILLED WITH FILLER BOARD WITH
TYPICAL A393 APPROVED SEALANT ALL AROUND
WELDED MESH SEALANT THE CONCRETE &
SCREED CONNECTION LEAD DESIGN AND SUPERVISION CONSULTANT
EXISTING RAFT EL-600 TSL
EXISTING RAFT Approved
anchoring material
to be used
CONCRETE
WALL / MAIN CONTRACTOR
Al Nasr Contracting Company L.L.C.
COLUMN Abu Dhabi, P.O.Box 2436, UAE
T +971 2 642 0002 | F +971 2 642 0228
EL-1.000 SSL SCREED Dubai, P.O.Box 122979, UAE
T +971 4 351 3665 | F +971 4 351 1095
alnasr.r044@alnasruae.com | www.alnasruae.com

04 04 SUB CONTRACTOR :

APPLY THIN BRUSH COAT OF


SECTION -B [ Temp. Ramp ] SCREED STEP DETAILS CEMENT GROUT BEFORE LAING
1:20@A0 1:20@A0 THE SCREED
PROJECT TITLE
TYPICAL A393 WELDED MESH 1welded mesh TYPICAL A393 WELDED MESH EXISTING RAFT PROJECT SPLASH
required to avoid THE GALLERIA
EL-600 TSL CHIP THE EXISTING cracks in concrete EXISTING SCREED EL-600 TSL
SCREED 1:10@A0 ABU DHABI, UAE
CONCRETE BY 50mm PLOT No. - C10

EL-1.000 SSL EL-1.000 SSL BUILDING

THE GALLERIA
Mecca
EXISTING RAFT EXISTING RAFT DRAWING TITLE
APPROVAL STATUS
A B C D E F SCREED LAYOUT AND DETAILS
Accepted Accepted
with
Revise &
Resubmit
Rejected Not
Reviewed
For
Information
BACK OF HOUSE AREA
comments
STATUS:
DATE REVIEWED: REVIEWED BY: SHOP DRAWING
This document is reviewed in accordance with the contract and is intended to verify general Prepared
Format Date Checked Scale Plot No.
conformance with the employer's requirements. The contractor remains solely responsible for
accuracy in information, site and fabrication dimensions, coordination with other trades and
A0 23.12.2019 RMR AT 1:75 @A0 C -10
works. This response shall not relieve the contractor from his duties, obligations and
responsibilities in any way under the contract and in complying with the Employer's REV.
SCREED DETAILS SCREED RAMP DETAILS [ SECTION-X ] requirments,including responsibility for errors,ommissions,discrepancies and non-compliances. SPL-ANC-BOS-ARC-SHD-00302 04
1:20@A0 1:20@A0