Record No.

Document
Submission 640-ACS-EINP-V04
Record

Contract:
ISLAMABAD INTERNATIONAL AIRPORT PROJECT
PACKAGE 4 - AIRPORT SPECIAL SYSTEMS

To: “The Engineer” Islamabad International Airport (IIAP) Project


Cc: Project Director, IIAP – CAA

Contract Reference Specs:


Sect 018926 - Gen_Instruction For Elect (2T)

Document Submission:
Equipment installation procedure ACS

Comments/References:
This document is part of the Installation Documents.
This submission of documents it is according to Clause 6.1 (Contractor’s drawings) of the FIDIC Conditions of
contract for electrical and mechanical works Part I General Conditions.
Attachments:
99501813400002900612_V04
JV – Issued For Approval
Signature Name Date Designation
Edoardo Carloni 08/04/2019 System Engineering Manager

PMC Approved Approved with comments Re-Submit Rejected


Signature Name Date Designation

Comments