You are on page 1of 13
EicivilRead Home Structure Tech Notes BBS Musthavebooks JOBS [FORUM] Contact Us , [ ft Home> STRUCTURE » Bar Bending Schedule for Tie Beams/Strap Beams | Estimation of Reinforcement in Tie / Strap Beams Bar Bending Schedule for Tie Beams/Strap Beams | Estimation of ee Reinforcement in Tie / Strap Beams & Krishna 9 August21, 2017 @ 8 Comments Contents [show] Bar Bending Schedule for Tie Beams/Strap | NEED HELP WITH Beams:- Bar Bending Schedule Plays a vital role in finding wK the quantities of the reinforcement required for the 89s, Quantity Survey building. Well, In order to understand the tie beam/Strap beam reinforcement in Substructure, | refer you to learn the Bar Bending Schedule for om, footings. Trower covers Ts htpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! wna 912112020 Tie Beam and Strap Beam:- Tie Beam (Straight beam) is a beam which connects the two footings in the substructure. Tie beam is provided when the two footings are in the same line Strap Beam(inclined beam) is similar to tie beam but it connects two footings at a certain angle. Strap beam is laid when two footings are in different levels. Tie beam/ Strap beam are specifically located between pile caps and shallow foundations. their primary function is to force all shallow foundations or pile caps to have approximately the same settlements. =] Footing Footing | wonw.civirend.com Ground Level Strap Beam (inclined Beam) Feoting Come Footing FRONT VIEW OF TIE & STRAP BEAM Quantity of reinforcement (steel) required for Tie Beam/ Strap beams or Bar bending schedule for Tie Beam/ Strap Beam:- In this post, | am finding out the Estimation of Steel reinforcement in Tie Beam or Strap Beam / Bar Bending Schedule for Tie Beam/ Strap beam. For this, | considered a plan as shown below. The horizontal bars which ties one footing to the other footing are main bars and the vertical bars are called hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! Bar Bending Schedule fr Te Beams/Strap Beams|Reinforcement Deal IMPORTANT TOPICS AUTOCAD Bar Bending Schedule bricks cement tes Civil engineer Student corner Compressive strength test on Building materials concrete field tests gate material gate notes Geo technical engineering highway engineering highways jobs land surveying plans Quality check of building materials on site Quantity surveying reinforcement Road staircase Tests on cement Tests on concrete jorkability of concrete srs2020 80: Bending Schetdefor Tie Beams/Sap BeamsRehnorcoment Deal stirrups. Stirrups helps in framing the main bars in correct position. Before getting into this article | recommend you to remember these Important Points to understand the reinforcement in tie beams:- 1.Main Bars (Top bar, Bottom bar, Side bar) are tied to the center the of one footing to the center of another footing. 2. Whereas stirrups starts from one face of footing to the another face of footing. Refer the below image for clear view how reinforcement is tied in Tie beam. ‘Stirups upto fae of footing Fa we Fa Main ba uote Centre of Footing Top View of Tie Beam Sectional View of Tie Beam Ci a ae) td Steps to be followed while finding out the total wt. of steel required for constructing Tie beams / Strap beams:- Tie beam reinforcement calculation is divided into two parts Main bars and stirrups Part-I:- Main Bars hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! 212020 Bar Bending Schedule for Tle BeamstStrap BeamsRenvorcement Detail 1. Check the Length of Main bars in top, bottom, side bars. 2. Then Check the No. of Main bars in top, bottom, side bars 3. Check the Diameter of Main bars in top, bottom, side bars 4.Calculate the total length of Main bars in top, bottom and side direction. 5. Find the total wt of Main bars. Part-ll:- Stirrups 1. Deduct the concrete cover from all sides of tie and find out the length of stirrup. 2, Calculate the length of stirrup including hook. 3. Calculate the total no. of stirrups. 4, Find the total length of stirrups 5. Then Calculate the total wt. of stirrups. Length, Dia and No. of Bars are adopted and designed by the structural engineer by executing the load analysis. Consider the below shown Figure. hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ana sr21r2020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal roe ase Assume for calculation:- Dia of Top Bars = 10mm, Dia of Bottom bars = 10mm ,Dia of Side bars = 8mm, Dia of Stirrups = 6mm, Spacing between ties = 0.1m. No. of Top Main bars = 4, No. of Bottom Main bars = 4 , No. of Side Main bars = 2 Calcul Bars):- ion for the Quantity of Tie beams (Main ‘Main bars upto Centre of Footing 5.20 ‘Stierups upto face of footing 72 wwwrcviread.com All beams in horizontal axis are all Tie beams except the beam between F5 and F6. hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ena 212020 Bar Bending Schedule for Tle BeamstStrap BeamsRenforcement Detail Treat all the beams are tie beams, as the direct value of length of beam is already given for all. If the length of Strap beam isn't given then obtain the Length of Strap beam by using Pythagorean theorem, Hyp’2 = Adj42+ Opp*2 Hypotenuse = length of strap beam. From the figure, Part- I. Calculate the Total wt required for Main bars Tie Beam on Axis | between A-B:~ Below are the five steps for finding the quantities of Tie beam, 1. Length of Top bar Length of Bottom Bar Length of Side Bar 20 (from fig) 9.20 (from fig) §.20 (from fig) 2. No. of Top bars No. of bottom bars No. of Side bars (Given) (Given) =2 (Given) 3. Dia of Top bar Omm (Given) Dia of bottombar = 10mm (Given) DiaofSidebar © =8mm (Given) 4. Total lenath of bars = Lenath of Each Bar x No. of bars hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ena 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal Length ofTop bar =5.20x4= 208 Length of bottom bar Length of Side Bar =5.20x2= 104 5. Total wt of Main bars in Tie beam = Wt of Steel bar in Kgsim x Total length of Bars 2 Weight of Steel barin Kgs /m=2 Dia of top bar= 10mm Dia of bottom bar = 10mr Dia of Side bar= 8mm Fae 70.38Kgim Total wt of top bar Total wt of Bottom bar Total wt of Side Bar = 0.61 x 20.8 = 12.688K 0.61 x 20.8 = 12.688Kg = 0,39 x 10.4 = 4.0560Kg] Apply the above method for all the tie beams in Horizontal and the vertical axis. the result of all tie beams have been entered in the below table. ‘eeibin | Duatear | naBoiar | Naat | Tommi" | wren | Toulwnies | Stee Eel Te a ae LTH tiga ng Bie or aa Calculation for the quantity of Tie Beams (Stirrups):- As | have already mentioned that Stirrups are started from one face of footing to the another face footing. Beam on Axis | between A-B:- Below are the five steps for finding the quantities of Tie beam (Stirrups) hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ma 212020 Bar Bending Schedule for Tle BeamstStrap BeamsRenforcement Detail 1. Deducting the concrete cover from all sides of the tie beam for finding out the length of each tie From the figure, it implies that reinforcement details of Tie beams in horizontal axis and vertical axis are different. As per the condition deduct the concrete cover of 0.05 from all sides of stirrups for Horizontal axis tie beams and 0.025 from all sides of stirrups for Vertical axis tie beams Hook Length ie added in Total length, /o.40 rTP Tie Beam PCC Tie Beam PCC ‘Tie Beam Horizontal Tie Beam Vertical 2. Length of Each tie with hook = L+18D => 0.930+0,30+0.30+0.30+18x0.006= 1.08 3. Calculate the No. of tes in tie beam (Adopt 0.1 spacing) Length of Tie Beam 4 Spacing No. of Ties = No of Ties in Tie bon As 8 22244 = 59 es 4. Total Length of Ties = Length of Each tie x No. of Ties = 1.308K59 = 69.324m 5. Total wt of Stirrups in Tie beam = Wt of Steel bar in Kgs/m x Total length of Stirrup Bars Weight of Steel bar in Kgs /m = ee gg 7 0-22Kgim Dia of Stirrup bar = 6mm Total wt of Stirrups in Tie beam = 0.22 x 69.924 = 15.25kg Apply the above method for remaining tie beams. The result is mentioned below. Check you result with the hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ana 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal below table. Descripfon | Dino | Lengthof Tie | Novof | Total | Wiofstelin | Totalwt Ber tirup Nes lengthot Kam In Kos ‘res [Restewa-— 6 igo ag son oo es 6 i sree 0220 [Asstowas 6 tags oan 0220 ara 4.3 e27ee 0220 soo1e 0220 3 0 80.220 ‘Ans ABW Hl b9g24 | 9220 st 1680220 2 en s2k 0200 a1s7a/ 0200 Ts = soaze 0220 Abstract For Finding out the total quantity of Steel reinforcement required for Tie Beam/Strap Beam for the above given plan:- Es Dia of Bar in mm | Total wtin S 6mm 475.53 8mm 46.48 a 4Omm 145.40 145.40 __Grand Total | 512.81Kgs ‘www.cMliread.com Hence, Total wt of Steel 512.81 Kgs required for Tie beam/Strap Beam (for above plan). LIKE US ON FACEBOOK For Instant updates Join our Whatsapp Broadcast. Save our Whatsapp contact +9700078271 as Civilread and Send us a message “JOIN Never Miss an update Click on “Allow US“ and make us allow or Click on Red notification bell at bottom right and allow notifications. Stay tuned! Civil Read Wishes you ALL the BEST for your hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! ona 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal future.. Share With Your Friends| Sharing Is Caring:) RELATED POSTS SHUTTERING Bee REQUIRED FOR THE CONSTRUCTION OF STAIRCASE Krishna February 8, 2019 DIFFERENT r GRADES OF CEMENT AND ITS 5 IMPORTANCE Krishna March 6, 2020 y ABOUT THE AUTHOR Admin CONCRETE SLUMP TEST PROCEDURE | APPLICATIONS | TYPES | USES Krishna March 24, 2020 BRICKWORK CALCULATION | ‘TYPES OF BRICKS | BRICKS IN CONSTRUCTION Krishna April 20, 2018 Founder & Admin of civilread.com, 1am a | civil engineer working in Ultratech Cement Ltd, With a good subject knowledge in civil engg i have started this blog to share valuable information to fellow civil engineers. You can also follow me on fb and twitter by clicking below Tags: Bar Bending Schedule 8 COMMENTS Raju | August 21,2017 hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! Reply ron 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal Great work for civil engineering student s and professional people. Prem pal | October 13,2017 Reply Good work Syed Mohamed | october 28, 2017 Reply Hi sir am syed from tiruvarurtamil nadu.currently | complete civil engineering. | have more construction work.i want to apply different bar bendings in fields and slab, beam column are you help me....i give my email id NA Sundaram | January 7,2018 Reply excuse me sir... sorry for the disturbance i have a one question? where and which type of construction used in tie and strap beam NA Sundaram | January 7,2018 Reply excuse me sir... sorry for the disturbance i have a one question? where and when this type of construction used in tie and strap beam... Arlumj6224 | April9, 2018 Reply Great effort, may you live long ‘Sumit | January 20,2019 Reply hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! nna 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal Why we not calculate bend length in beam Lady | February 22, 2019 Reply Very helpful to me as an estimator who doesn't have field experience. Thanks a lot! ADD A COMMENT ‘Comment Text Name* Email* POST COMMENT Top Guides We are Social > Bar Bending Schedule f @ > All About Concrete yo hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! vane 912112020 Bar Bending Schedule fr Te Beams/Strap Beams[Reinforcement Deal Le > All About Cement Write for us ECivilRead Forum-Q&A > Quality Tests on Site © Write Post Ch Engng Forum > Different Types > AutoCAD © CIVIL READ Copyright © 2020. Home Termsof Service Privacy Policy AboutUs Contact Us Follow us Must have books hitpsscvlread.comibar-bending-schedule-tie-beamsstrap-beams! rana

You might also like