You are on page 1of 8

Providing repairs, additional amenities and Painting to 3886 model primary schools in Andhra Pradesh.

Est.Rs. 12193.00 lakhs

Abstract Quantities

S No Description of Item Quantity Rate Unit Amount

Removing White wash or Colour wash by steel wire


brushing and/or scraping; sand papering and preparing
1 the wall surface smooth including necessary repairs to 4114745.08 6.82 Sqm 28062561
scratches complete in Ground Floor and First Floor in
Rural areas.
Removing White wash or Colour wash by steel wire
brushing and/or scraping; sand papering and preparing
2 the wall surface smooth including necessary repairs to 853569.90 8.15 Sqm 6956595
scratches complete in Ground Floor and First Floor in
Municipal areas.
Removing White wash or Colour wash by steel wire
brushing and/or scraping; sand papering and preparing
3 the wall surface smooth including necessary repairs to 204459.60 8.49 Sqm 1735862
scratches complete in Ground Floor and First Floor in
Municipal Corporation areas.
Removing White wash or Colour wash by steel wire
brushing and/or scraping; sand papering and preparing
4 the wall surface smooth including necessary repairs to 126102.13 9.49 Sqm 1196709
scratches complete in Ground Floor and First Floor in
Visakhapatnam and Vijayawada.
Removing White wash or Colour wash by steel wire
brushing and/or scraping; sand papering and preparing
5 the wall surface smooth including necessary repairs to 38296.11 8.49 Sqm 325134
scratches complete in Ground Floor and First Floor in
Tribal areas upto 16Km.
Removing White wash or Colour wash by steel wire
brushing and/or scraping; sand papering and preparing
6 the ceiling and/or sloping roofs surface smooth including 865927.69 7.5 Sqm 6494458
necessary repairs to scratches complete in Ground Floor
and First Floor in Rural areas.

Removing White wash or Colour wash by steel wire


brushing and/or scraping; sand papering and preparing
7 the ceiling and/or sloping roofs surface smooth including 179911.09 8.97 Sqm 1613802
necessary repairs to scratches complete in Ground Floor
and First Floor in Municipal areas.

Removing White wash or Colour wash by steel wire


brushing and/or scraping; sand papering and preparing
8 the ceiling and/or sloping roofs surface smooth including 45284.80 9.34 Sqm 422960
necessary repairs to scratches complete in Ground Floor
and First Floor in Municipal Corporation areas.
S No Description of Item Quantity Rate Unit Amount

Removing White wash or Colour wash by steel wire


brushing and/or scraping; sand papering and preparing
9 the ceiling and/or sloping roofs surface smooth including 22510.33 10.43 Sqm 234783
necessary repairs to scratches complete in Ground Floor
and First Floor in Visakhapatnam and Vijayawada.

Removing White wash or Colour wash by steel wire


brushing and/or scraping; sand papering and preparing
10 the ceiling and/or sloping roofs surface smooth including 7953.99 9.34 Sqm 74290
necessary repairs to scratches complete in Ground Floor
and First Floor in Tribal areas upto 16Km.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
11 surface to remove all dirt and remains of loose powdered 1956634.93 124.47 Sqm 243542350
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in Ground Floor in Rural areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
12 surface to remove all dirt and remains of loose powdered 378297.21 142.02 Sqm 53725770
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in Ground Floor in Municipal areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
13 101490.23 146.41 Sqm 14859185
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in Ground Floor in Municipal Corporation
areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
14 49738.39 159.57 Sqm 7936755
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in Ground Floor in Visakhapatnam and
Vijayawada.
S No Description of Item Quantity Rate Unit Amount

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
15 surface to remove all dirt and remains of loose powdered 18897.61 146.41 Sqm 2766799
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in Ground Floor in Tribal areas upto 16Km.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
16 surface to remove all dirt and remains of loose powdered 2598079.52 132.22 Sqm 343518074
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in Ground Floor in Rural areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
17 surface to remove all dirt and remains of loose powdered 500642.16 149.77 Sqm 74981176
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in Ground Floor in Municipal areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
18 119767.24 154.16 Sqm 18463318
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in Ground Floor in Municipal Corporation
areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
19 81025.13 167.32 Sqm 13557125
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in Ground Floor in Visakhapatnam and
Vijayawada.
S No Description of Item Quantity Rate Unit Amount

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
20 surface to remove all dirt and remains of loose powdered 23660.55 154.16 Sqm 3647510
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in Ground Floor in Tribal areas upto 16Km.
Painting to wood work with Two coats of ready mixed
synthetic enamel paint first quality all shades to give an
even shade over base coat of primer with luppam
finishing thouroughly brushing the surface to remove all
21 262532.84 138.27 Sqm 36300416
remains including cost and conveyance of all materials to
site, all operational, incidental and labour charges etc.,
complete for finished item of work in Ground Floor and
First Floor in Rural areas.
Painting to wood work with Two coats of ready mixed
synthetic enamel paint first quality all shades to give an
even shade over base coat of primer with luppam
finishing thouroughly brushing the surface to remove all
22 55822.28 155.82 Sqm 8698228
remains including cost and conveyance of all materials to
site, all operational, incidental and labour charges etc.,
complete for finished item of work in Ground Floor and
First Floor in Municipal areas.

Painting to wood work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of primer with luppam
finishing thouroughly brushing the surface to remove all
23 8830.43 160.21 Sqm 1414723
remains including cost and conveyance of all materials to
site, all operational, incidental and labour charges etc.,
complete for finished item of work in Ground Floor and
First Floor in Municipal Corporation areas.

Painting to wood work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of primer with luppam
finishing thouroughly brushing the surface to remove all
24 9499.67 173.37 Sqm 1646958
remains including cost and conveyance of all materials to
site, all operational, incidental and labour charges etc.,
complete for finished item of work in Ground Floor and
First Floor in Visakhapatnam and Vijayawada.

Painting to wood work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of primer with luppam
finishing thouroughly brushing the surface to remove all
25 2268.99 160.21 Sqm 363515
remains including cost and conveyance of all materials to
site, all operational, incidental and labour charges etc.,
complete for finished item of work in Ground Floor and
First Floor in Tribal areas upto 16Km.
S No Description of Item Quantity Rate Unit Amount

Painting to Iron work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of Red Oxide primer
thouroughly brushing the surface to remove all remains
26 30231.30 129.24 Sqm 3907093
including cost and conveyance of all materials to site, all
operational, incidental and labour charges etc., complete
for finished item of work in Ground Floor and First Floor
in Rural areas.
Painting to Iron work with Two coats of ready mixed
synthetic enamel paint first quality all shades to give an
even shade over base coat of Red Oxide primer
thouroughly brushing the surface to remove all remains
27 24563.41 145.87 Sqm 3583065
including cost and conveyance of all materials to site, all
operational, incidental and labour charges etc., complete
for finished item of work in Ground Floor and First Floor
in Municipal areas.

Painting to Iron work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of Red Oxide primer
thouroughly brushing the surface to remove all remains
28 9491.63 150.03 Sqm 1424029
including cost and conveyance of all materials to site, all
operational, incidental and labour charges etc., complete
for finished item of work in Ground Floor and First Floor
in Municipal Corporation areas.

Painting to Iron work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of Red Oxide primer
thouroughly brushing the surface to remove all remains
29 1522.48 162.5 Sqm 247403
including cost and conveyance of all materials to site, all
operational, incidental and labour charges etc., complete
for finished item of work in Ground Floor and First Floor
in Visakhapatnam and Vijayawada.

Painting to Iron work with Two coats of ready mixed


synthetic enamel paint first quality all shades to give an
even shade over base coat of Red Oxide primer
thouroughly brushing the surface to remove all remains
30 699.55 150.03 Sqm 104953
including cost and conveyance of all materials to site, all
operational, incidental and labour charges etc., complete
for finished item of work in Ground Floor and First Floor
in Tribal areas upto 16Km.
Painting two Coats including Primer coat after filling the
surface with synthetic enamel paint in all shades on
31 plastered/ concrete surfaces as per drawing and Technical 248823.00 126.44 Sqm 31461180
Specification Clause 1701 MoRD in Ground Floor and First
Floor in Rural areas.
Painting two Coats including Primer coat after filling the
surface with synthetic enamel paint in all shades on
32 plastered/ concrete surfaces as per drawing and Technical 55829.95 138.74 Sqm 7745847
Specification Clause 1701 MoRD in Ground Floor and First
Floor in Municipal areas.
S No Description of Item Quantity Rate Unit Amount

Painting two Coats including Primer coat after filling the


surface with synthetic enamel paint in all shades on
33 plastered/ concrete surfaces as per drawing and Technical 11414.80 141.81 Sqm 1618733
Specification Clause 1701 MoRD in Ground Floor and First
Floor in Municipal Corporation areas.
Painting two Coats including Primer coat after filling the
surface with synthetic enamel paint in all shades on
34 plastered/ concrete surfaces as per drawing and Technical 13728.32 151.04 Sqm 2073525
Specification Clause 1701 MoRD in Ground Floor and First
Floor in Visakhapatnam and Vijayawada.
Painting two Coats including Primer coat after filling the
surface with synthetic enamel paint in all shades on
35 plastered/ concrete surfaces as per drawing and Technical 606.32 141.81 Sqm 85982
Specification Clause 1701 MoRD in Ground Floor and First
Floor in Tribal areas upto 16Km.
Printing new letters and figures of any shade with
synthetic enamel paint black or any other approved colour
36 to give an even shade as per drawings and Technical 15282693.00 1.07 Cm 16352482
Specification Clause 1701 MoRD/ 801 MoRTH in Ground
Floor and First Floor in Rural areas.

Printing new letters and figures of any shade with


synthetic enamel paint black or any other approved colour
37 to give an even shade as per drawings and Technical 2622084.00 1.26 Cm 3303826
Specification Clause 1701 MoRD/ 801 MoRTH in Ground
Floor and First Floor in Municipal areas.

Printing new letters and figures of any shade with


synthetic enamel paint black or any other approved colour
38 to give an even shade as per drawings and Technical 681827.00 1.31 Cm 893193
Specification Clause 1701 MoRD/ 801 MoRTH in Ground
Floor and First Floor in Municipal Corporation areas.

Printing new letters and figures of any shade with


synthetic enamel paint black or any other approved colour
39 to give an even shade as per drawings and Technical 741654.00 1.45 Cm 1075398
Specification Clause 1701 MoRD/ 801 MoRTH in Ground
Floor and First Floor in Visakhapatnam and Vijayawada.

Printing new letters and figures of any shade with


synthetic enamel paint black or any other approved colour
40 to give an even shade as per drawings and Technical 206240.00 1.31 Cm 270174
Specification Clause 1701 MoRD/ 801 MoRTH in Ground
Floor and First Floor in Tribal areas upto 16Km.
S No Description of Item Quantity Rate Unit Amount

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
41 surface to remove all dirt and remains of loose powdered 183819.13 133.25 Sqm 24493899
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in First Floor in Rural areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
42 surface to remove all dirt and remains of loose powdered 74084.83 152.55 Sqm 11301641
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in First Floor in Municipal areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
43 20276.77 157.38 Sqm 3191158
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in First Floor in Rural areas in Municipal
Corporation areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
44 10668.40 171.86 Sqm 1833471
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in First Floor in Visakhapatnam and
Vijayawada.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
45 surface to remove all dirt and remains of loose powdered 5366.23 157.38 Sqm 844537
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
internal walls in First Floor in Tribal areas upto 16Km.
S No Description of Item Quantity Rate Unit Amount

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
46 surface to remove all dirt and remains of loose powdered 176537.73 141 Sqm 24891820
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in First Floor in Rural areas.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
47 surface to remove all dirt and remains of loose powdered 64353.21 160.3 Sqm 10315820
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in First Floor in Municipal areas.
Painting to walls with Two coats of plastic emulsion paint
of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
48 18646.04 165.13 Sqm 3079021
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in First Floor in Municipal Corporation
areas.
Painting to walls with Two coats of plastic emulsion paint
of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
49 10192.40 179.61 Sqm 1830657
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in First Floor in Visakhapatnam and
Vijayawada.

Painting to walls with Two coats of plastic emulsion paint


of approved brand and shade over a base coat of
approved cement primer grade I making Three coats in all
to give an even shade after thouroughly brushing the
50 surface to remove all dirt and remains of loose powdered 5224.75 165.13 Sqm 862763
materials, including cost and conveyance of all materials
to work site and all operational, incidental, labour charges
etc., complete for finished item of work as per SS911 for
external walls in First Floor in Tribal areas upto 16Km.

Grand Total 1029330726

You might also like