You are on page 1of 4
KOYO Elevator Layout Drawing Project Name: Project ATE Elevator NO. : KOYO ELEVATOR CO. LTD Elevator Civil Engineering Technology Requirements (WE levator lv egierng should wet elevatr ork enlist reulaaats asthe flow outrage se mia 5" 0-40" 2h einen ey pe a a 5° 5 See rik tli evr al Sug ie oe cat at 4 ta tie sbi er of ‘TWiki foe ames ig hie recip lige lb i ead i en oe ie i le dae ty or i tl pe ieee etn cel we 2, Mie an pl ee psa ee ee, hl ee teeter bee 1 tin ea oe atin tt de sm hide wr ati et (Roe foe tage, i ein ten, eee ae he ai of 1 pus a pte mie om pi opm lc ie tere ie Sal ins SUPA pallet a Sa hg le a si ei eh Gat cn er ta ee te om oe ees 6 eh ih ce a i lin le = a wily i 4B ewe hl i i ph et lt om ta ee itp trol ie Se ae Sod oe ar ln ipod ha Stipe se a ‘Pais ei lj eri ad ae eh ‘in on sb ys es ly ol dt Md ae lh arp con ee 6th a Sd ip tty el a Se min on a iin si emo ley isnt Ne, a bp i tafe pe ‘ict tw a ro 2. Sehn lod th oo Lin edd to i 2a li i Side erin eel tel wcll is. «ts din nl sel tc bw tr wore ald soda 4. pd i nena ly md gh pn i ih ia hl enn pt ia Elin th enn a cle Se to ee et ‘isd wd ul fe del fee smh ds an in om ln pti won itil le a a ke ‘Sm a tine le pe hr el ee ain en om reais ar tog sta Airing lll Li ll eee pm me ino ce cl Sm Lilien, te ocd minis tp wr od i ly ‘vos in ei aes SSLEUW i outlet el wears igo wee eect Seam mie lar —togeee y esas igh in pr re i eh me ih Ue tt ‘WE att etal, sh dp om od mn ss do iii sl a i ol on ln ot can ees € thie mt ec se vary fl i a ei le 2, Sates etme stot el bye semble try (Mase oe ele a yt 4. ete dae tt let ee tt fee nt ie tn net lr ce 4 Sty te i edt en a We et eth 38 eee ld te {i et bw Ie np bg ea he ha i al Ia hn Oe ay Sl espe a 5 Bats de ety a gee a tla wy ak ve de es 2 ee an laa a ye ee cs el le (etecpmt few nett ee ‘te af te a So, al Wh ee lg ie pte i v 1. Sat plese sane ni antl eh la ine i lle ein of a ait bed i pe ae he Dok 1 i fe da tpt te Oe ip fh pt OS $e ar tt eto ect ate ps fmt fe lane be a ae (lng ea tp esses ly Ede Ot ed It lhc len weit ta rai) heal een 6 he bro al seu notte tt af eat eh pin of et Shr ft oq he pes sb eee Un rie ee pm, lla ‘Bat dae ee ep ae te at , 1 Sat ei tp rm a i eat fe pe ‘tei ie yt se da wh ol 2. ae a ep ste eur ee or ete a er ral nin ih pei” 15 Israel Sl i em ok 4. allie ct aie De et ell ot 1 Heat te ctl al Sm oe FUR Fit hr dite tne ly en i ele mth, al a Seah Mar ‘Slot be ac! at lt ert oS tetera alo let a a te ‘Sesleri at FRE anng Dor ere ig ar, male iting eninge at ae pont tbe aie ele ale, alt lin nat gt atin alin ei eee sa Satie at ie i Lily ld te tli a Pein ime 2, The caster isresensibe fr elosig the drafter th elestr is installed SUMochiw nee czeisdisrnty use) Lie Gaal FL pete isan aki on else PPP) tees te ph os is pe a HI ksT UN Tp Specticion Tae TE Tad at co Tied Spel ays Top plane layout aoe “ie Shaft Plane Layout Fe Sep oar K Tor Op ge = ws oar tw) m ar Den 6 mB Te Te = Dod Tove TF . = ae tio Motor Power “TEI ak 5 feed Co | ae 4 is Tle “Tg {| =| | Toe TH E | 5 5 TPE A Ls [rs L ALL Ey | arpa for epee ra Rr a wo —* | fe = x Top plane layout ss Bh Seana aed arp for apron |: Project ATE | 4 Ft are: z| 7s | a5 | || ea wo. J | - ER WITg0AL01A ator Let ring Ns ae rang Tare Sa evar Laut ring 1340 ones Ter TW450-1.0 A Saaiae_[ ae | ae Teal Vp heck f KOYO ~cam am Shaft vertical section fon 2g qo | traann , f =| Landing door layout Landing_door_layout 5 Base floor Other floor B x tT) al alti wl ; aR Sl Peay | 3 g H ata amas ss wo —— Hy a) ig Es c 2 ifs | Bit ad [a s] 8 I ee + 3| Sesrane ad Sarp fo apo: Ma 3) 5 Fuse A F | 2/8 Project ATE st nan er wo sWIYigos2014 eestor Leu eins Ne rae Sa .| Benker Lyoat bein 140 z TWa50—1.0 A | Sea _[ ae | Pa Taiget a9 here Be KOYO = co

You might also like