KOYO
Elevator Layout Drawing
Project Name: Project ATE
Elevator NO. :
KOYO ELEVATOR CO. LTDElevator Civil Engineering Technology Requirements
(WE levator lv egierng should wet elevatr ork enlist reulaaats asthe flow
outrage se mia 5" 0-40"
2h einen ey pe a a 5°
5 See rik tli evr al Sug ie oe cat at
4 ta tie sbi er of
‘TWiki foe
ames ig hie recip lige lb i ead i en oe ie i le
dae ty or i tl pe ieee etn cel we
2, Mie an pl ee psa ee ee, hl ee teeter bee
1 tin ea oe atin tt de sm hide wr ati et
(Roe foe tage, i ein ten, eee ae he ai of
1 pus a pte mie om pi
opm lc ie tere ie
Sal ins SUPA pallet a Sa hg le a
si ei eh Gat cn
er ta ee te om oe ees
6 eh ih ce a i lin le = a wily i
4B ewe hl i i ph et lt om ta ee
itp trol ie Se ae Sod oe ar ln ipod ha
Stipe se a
‘Pais ei lj eri ad ae eh
‘in on sb ys es ly ol dt Md ae lh
arp con ee
6th a Sd ip tty el a Se min on a iin si
emo ley isnt Ne, a bp i tafe pe
‘ict tw a ro
2. Sehn lod th oo Lin edd to i 2a li i
Side erin eel tel wcll is.
«ts din nl sel tc bw tr wore ald
soda
4. pd i nena ly md gh pn i ih ia hl
enn pt ia Elin th enn a cle Se to ee et
‘isd wd ul fe
del fee smh ds an in om
ln pti won itil le a a ke
‘Sm a tine le pe hr el ee ain en om
reais ar tog sta
Airing lll Li ll eee pm me ino ce cl
Sm Lilien, te ocd minis tp wr od i ly
‘vos in ei aes
SSLEUW i outlet el wears igo wee eect Seam
mie lar —togeee y
esas igh in pr re i eh me ih Ue tt
‘WE att
etal, sh dp om od mn ss do iii sl a
i ol on ln ot
can ees
€ thie mt ec se
vary fl i a ei le
2, Sates etme stot el bye semble try
(Mase oe ele a yt
4. ete dae tt let ee tt fee nt ie tn
net lr ce
4 Sty te i edt en a We et eth 38 eee ld te
{i et bw Ie np bg ea he ha i al
Ia hn Oe ay Sl espe a
5 Bats de ety a gee a tla wy ak ve de es
2 ee an laa a ye ee cs el le
(etecpmt few nett ee
‘te af te a So, al Wh ee lg ie pte
i v
1. Sat plese sane ni antl eh la ine i lle ein of a
ait bed i pe ae he Dok
1 i fe da tpt te Oe
ip fh pt OS
$e ar tt eto ect ate ps fmt fe lane be a ae
(lng ea tp esses ly Ede Ot ed
It lhc len weit ta rai) heal een 6 he bro al
seu notte tt af eat eh pin of et
Shr ft oq he pes sb eee Un rie ee pm, lla
‘Bat dae ee ep
ae te at ,
1 Sat ei tp rm a i
eat fe pe
‘tei ie yt se da wh ol
2. ae a ep ste eur ee or ete a er ral nin ih pei”
15 Israel Sl i em ok
4. allie ct aie De et ell ot
1 Heat te ctl al Sm oe
FUR Fit
hr dite tne ly en i ele mth, al a Seah Mar
‘Slot be ac! at lt ert oS tetera alo let a a te
‘Sesleri at
FRE anng Dor
ere ig ar, male iting eninge at ae pont
tbe aie ele ale, alt lin
nat gt atin alin ei
eee sa Satie at ie
i Lily ld te tli a Pein
ime
2, The caster isresensibe fr elosig the drafter th elestr is installed
SUMochiw nee czeisdisrnty use)
Lie
Gaal FL pete isan
aki on else
PPP) tees te
ph os
is pe a
HI
ksT UNTp Specticion
Tae TE
Tad at co
Tied Spel ays
Top plane layout aoe “ie
Shaft Plane Layout Fe Sep oar
K Tor Op ge
= ws oar
tw) m ar Den
6 mB Te Te
= Dod
Tove
TF . = ae
tio Motor Power
“TEI ak 5 feed Co
| ae 4 is Tle
“Tg {| =| | Toe TH
E | 5 5 TPE A Ls [rs
L ALL Ey | arpa for epee
ra Rr a
wo —* | fe
=
x
Top plane layout
ss
Bh
Seana aed arp for apron
|: Project ATE
| 4 Ft are:
z| 7s | a5 | || ea wo.
J | - ER WITg0AL01A
ator Let ring Ns
ae rang Tare Sa
evar Laut ring 1340
ones Ter
TW450-1.0 A
Saaiae_[ ae | ae
Teal Vp
heck f
KOYO ~cam amShaft vertical section
fon 2g
qo | traann , f
=| Landing door layout Landing_door_layout
5 Base floor Other floor
B x tT) al alti wl
; aR Sl Peay
| 3 g
H ata amas
ss wo ——
Hy a) ig Es
c 2 ifs
| Bit ad [a
s] 8 I ee
+ 3| Sesrane ad Sarp fo apo:
Ma 3) 5 Fuse A
F | 2/8
Project ATE
st nan
er wo
sWIYigos2014
eestor Leu eins Ne
rae Sa
.| Benker Lyoat bein 140
z TWa50—1.0 A
| Sea _[ ae | Pa
Taiget a9
here Be
KOYO =
co