Professional Documents
Culture Documents
Project Name:
Contractor Name:
Activity/ Area/ Equipment:
Assessor(S): Assessment Date: Doc No.
Reviewed by: Review Date: Next Review Date:
EHSS Risk Residual EHS
Hazard/ Evaluation Risk Evaluation
Hazard/ Aspect Persons at Risk Existing Control measures Additional control measures or other actions
#
Aspect Effect
N S L R N S L R
Aspect Effect
N S L R N S L R
Up to 20 Risk is low: Acceptable: Additional control measures may be considered to reduce the Risk, although low priority. Time, effort and cost should be proportional to the Risk.
21 to 50 Risk is medium: Unacceptable: Additional control measures required soon to control. Interim measure may be necessary in the short term.
Risk is high: Unacceptable: Additional control measures required urgently to control Risk. Interim measure required in the short term. Significant effort, time, etc. may have to be
51 to 100
control the Risk