SCOPE OF WORKS
1. EXCAVATION
2. STEEL WORKS
3. CONRETE WORKS
4. MASONRY WORKS
5. TILE WORKS
6. ELECTRICAL WORKS
7. PLUMBING WORKS
8. PAINTING WORKS
9. NITCH (PRESIDENTIAL,RESERVE VAULT,VONE VAULT,ALTAR)
10. STAIRS,RAILINGS,DOORS AND WINDOWS, GRILLS AND OTHERS
SPECIFICATION OF MATERIALS
1. STEEL WORKS
1.1. 16mmø round steel bars
1.2. 12mmø round steel bars
1.3. 10mmø round steel bars
2. CONCRETE WORKS
2.1. Republic Portland Cement
2.2. Sand
2.3. ¾” Gravel
3. MASONRY WORKS
3.1. CHB 4” (exterior walls)
3.2. CHB 5” (Interior walls)
4. TILE AND STONE WORKS
4.1. 60cm x 60cm tiles
4.2. Black Granite
5. PAINTING WORKS
5.1. Boysen Paint
6. DOORS AND WINDOW
6.1. Analox Sliding Window Brown
6.2. Dual Opening Glass Door
6.3. 2x2 Stainless Tubular for Main Gate
6.4. 1x1 Stainless Tubular for Grills
7. STAIRS, RAILINGS AND PARAPET
7.1. 2X2 Stainless Tubular for Railings Main
7.2. 1x1 Stainless Tubular for Railings braces
7.3. Spiral Stairs
7.4. 1x1 Stainless Tubular for parapet
8. WATER TANK