You are on page 1of 2
DAY THREE KILL SHEET EXERCISE Complete a SURFACE IWCF Kill Sheet using the data below and answer the questions on the following page: WELL DATA: Hole size By Measured depth 11,997 ft True vertical depth 11,937 ft Casing (9 5/8” Csg — 47 lb/ft I.D.- 8.681 in) . = 9474 tt Internal Capacities: Drill pipe 5.0" 19.5 ibitt 0.0178 bbitt HWDP —5.0"- 49.3 Ibift Drill collars 61/4” od x 2.5" id Volume from mud pumps to rig floor 0.0088 bbI/ft (iength - 497 tt) 0.0060 bit (length - 892 ft) 8.5 bbls Annular Capacities: Drill collars in open hole 0.0322 bbitt Drill pipe/HWOP in open hole 0.0459 bblit Dill pipe/HWOP in cased hole 0.0489 bit Mud Pump Data: Displacement at 97% efficiency = 0.117 bbl/stk Slow Circulating Pump Data: ‘@ 30 SPM using Mud Pump No. 1 = 820psi Other Information: Active surface mud volume = 825 bbls, Formation Strength Test Data: Fracture mud weight at 95/8" casing shoe == 16.9 ppg Kick Data: Shut-in Drill Pipe Pressure 580 psi Shut-in Casing Pressure 755 psi Pit Gain = 12bbIs Mud Weight at time of kick = 14.3 ppg NOTE: The well will be Killed at 30 SPM using the Wait and Weight Method aa 3.b ad ae 3f 3.9 3.h 3j 3k 3 Caloulate the MASP using the mud weight of 14.3 ppg - psi What mud weight is required to balance formation pressure? ppg Calculate the Initial Circulating Pressure (ICP): psi Calculate the Final Circulating Pressure (FCP): psi Calculate the pump strokes to pump from surface to the bit: strokes Calculate the pump strokes to pump from the mud pump to the bit: strokes. Caloulate the time in minutes to pump from surface to the bit: minutes Calculate the time in minutes to pump from the mud pump to the bit: minutes Caloulate the strokes required to pump from the bit to the shoe: ___ strokes How many minutes are required to circulate the total well system volume at 30 minutes Calculate the MAASP with kill weight mud in the system: psi What is the pressure loss per 100 strokes as the kill mud is pumped from surface to the bit? psi/100 strokes,

You might also like