Professional Documents
Culture Documents
Design of Bridges at Ch. 7+780 and Ch. 10+600 - 21
Design of Bridges at Ch. 7+780 and Ch. 10+600 - 21
950
4.74 4
1
2
LWL 46.209 0.713 t/m
2
2.816 t/m
0 2 5
3
Pile Cap B 46.209
Kaγh = 2.82 t/m2 Ka*q 0.74
2
t/m