SOIL PROFILE
Stratum Elevation of ------------------ Soil types -------------------
no. top of stratum Active side Passive side
1 2.50 1 FILL 1 FILL
2 1.90 2 SILTY SAND 2 SILTY SAND
3 0.00 3 CLAYEY SAND 3 CLAYEY SAND
WALL PROPERTIES
Type of structure = Soldier Pile Wall
Soldier Pile width = 0.45 m
Soldier Pile spacing = 0.68 m
Passive mobilisation factor = 3.00 m
Elevation of toe of wall = -8.40
Maximum finite element length = 0.60 m
Youngs modulus of wall E = 2.5000E+07 kN/m2
Moment of inertia of wall I = 4.4731E-03 m4/m run
E.I = 111828 kN.m2/m run
Yield Moment of wall = Not defined
STRUTS and ANCHORS
Strut/ X-section Inclin Pre-
anchor Strut area Youngs Free -ation stress Tension
no. Elev. spacing of strut modulus length (degs) /strut allowed
m sq.m kN/m2 m kN
1 -0.10 1.00 0.100000 3.000E+07 15.00 0.00 0 Yes
2 -1.70 1.00 0.100000 3.000E+07 15.00 0.00 0 Yes
SURCHARGE LOADS
Surch Distance Length Width Surcharge Equiv. Partial
-arge from parallel perpend. ----- kN/m2 ----- soil factor/
no. Elev. wall to wall to wall Near edge Far edge type Category
1 2.50 0.40(A) 20.00 20.00 25.00 = N/A 1.00 -
2 2.00 2.80(A) 20.00 0.50 200.00 = N/A 1.00 -
CONSTRUCTION STAGES
Construction Stage description
stage no. --------------------------------------------------------
1 Apply surcharge no.1 at elevation 2.50
2 Apply surcharge no.2 at elevation 2.00
3 Excavate to elevation -2.20 on PASSIVE side
4 Apply water pressure profile no.1 ( Mod. Conserv. )
5 Install strut or anchor no.2 at elevation -1.70
6 Install strut or anchor no.1 at elevation -0.10
Boundary conditions:
Length of wall (normal to plane of analysis) = 30.00 m
Maximum and minimum bending moment and shear force at each stage
Stage ------------ Bending moment ----------- ------------- Shear force -------------
no. ------- Calculated ------ Factored ------- Calculated ------ Factored
max. elev. min. elev. max. min. max. elev. min. elev. max. min.
kN.m/m kN.m/m kN.m/m kN/m kN/m kN/m kN/m
1 0 1.90 -1 0.35 0 -1 0 1.90 -1 1.30 1 -1
2 0 1.90 -3 -2.30 0 -4 1 -4.80 -1 0.70 1 -2
3 174 -3.60 -0 -8.40 260 -0 62 -2.20 -61 -5.40 93 -92
4 332 -4.80 0 2.50 498 0 99 -2.30 -135 -6.60 148 -203
5 No calculation at this stage
6 332 -4.80 0 2.50 498 0 99 -2.30 -135 -6.60 148 -203
Run ID. BP1 DRAINED_ULS1 | Sheet No.
33 CHATSWORTH AVENUE BRIGHTON | Date: 7-12-2015
BP1 450 SECANT PILE DEPTH 8.7M FOR RH 4.7M DRAINED | Checked :
-----------------------------------------------------------------------------
Summary of results (continued)