‘SUMP PIT DESIGN CALCULATION PROJECT + J159 AL TAMEER BUILDING - AHMADI ICLIENT Mis. KUWAIT OIL COMPANY |CONSULTANT ‘Mis. WORLEY PARSONS MAIN CONTRACTOR /s. KHALID ALI AL-KHARAFI & BROS. CO, GENERAL CONTRACTORS 1 {Sump pit no. 1 dimensions Length (m) Width (m) Depth (m) from IL of Pipe i 25 2 15 a 5 2 |Volume of the Sump pit (m3) - i Se Case 1 3. [Approximate flow rate of the $ Nos. of upright sprinkler in the basement car parking Sump Pit 1 area 4 {Total flow rate by the sprinkler would be 5__|Time required to pumpout the water from the Sump pit Result : 6 |Capacity of the sump pump selected 7.50 0.096 x 5 0.48 15.63 0.48 m3 / min m3 / min min 3 /min Page 1 of 1 ‘SUMP PIT DESIGN CALCULATION PROJECT : J159 AL TAMEER BUILDING - AHMADI CLIENT M/s, KUWAIT OIL COMPANY CONSULTANT : M/s. WORLEY PARSONS MAIN CONTRACTOR Mls, KHALID ALI AL-KHARAFI & BROS, CO. GENERAL CONTRACTORS. ‘Sump pit no. 2 dimensions Length (m) Width (m) Depth (m) from IL of Pipe te 25 2 Teste ‘Volume of the Sump pit (m3) He me (Case 1: |Approximate flow rate of the 5 Nos. of upright sprinkler in the basement car parking Sump Pit 2 arca ‘Total flow rate by the sprinkler would be ‘Time required to pumpout the water from the Sump pit Res ‘Capacity of the sump pump selected 7.50 0.096 x 5 0.48 15.63 0.48 m3 m3/ m3 / min min m3/min Page 1 of 1 ‘SUMP PIT DESIGN CALCULATION PROJECT 1: J159 AL TAMEER BUILDING - AHMADI CLIENT : Mis, KUWAIT OIL COMPANY CONSULTANT : M/s, WORLEY PARSONS MAIN CONTRACTOR M/s, KHALID ALI AL-KHARAFI & BROS. CO. GENERAL CONTRACTORS. ‘Sump pit no. 3 dimensions Length (m) Width (m) ___ Depth (m) from IL of Pipe 25 2 1s 2 |Volume of the Sump pit (m3) cre See 750| m3 Case 1: Result i oe 3. |Approximate flow rate of the 5 Nos. of upright sprinkler in the basement car parking Sump Pit 3 area 0.096 x 5]_m3 / min 4 [Total flow rate by the sprinkler would be 0.48) m3 / min 5 _|Time required to pump out the water from the Sump pit 15.63 | min [Case 2 : Result 6. |Approximate flow rate due to the rainfall in the Basement 3 & Basement 2 ramp 1.03] m3/min 7. |Time required to pump out the water from the Sump pit 728| min Note : As the rain water collected (1.03 m3/min) is twice that of sprinkler (0.48 m3/min ) During rain, the stand by pump will assist to evacuate the pit in 7.53 minutes. Case 2 :Rain Water Flow Rate = AxPxR/(60x 1000) Where Q= Run- off in m3/min = Area drained in m2 - Impermeability factor as 0.75 = Rainfall Intensity in mm / hr (as per KOC Std 115 mm/hr ) Page 1 of 2 SUMP PIT DESIGN CALCULATION PROJECT 1: J159 AL TAMEER BUILDING - AHMADI CLIENT : Mls. KUWAIT OIL COMPANY CONSULTANT : M/s. WORLEY PARSONS MAIN CONTRACTOR : Mls. KHALID ALI AL-KHARAFI & BROS. CO. GENERAL CONTRACTORS. Ttem A : Calculation for Basement 3 ramp from Ground Floor Data: A= 440 m2 P=0.75 R= 115 mm/hr Q1= (450 x 0.75 x 115) / (60x 1000) Q1= 0.63 m3/min Item B : Calculation for Basement 2 ramp from Ground Floor Datas: A= 280 m2 P=0.75 R= 115 mm/br Q2= (280x 0.75 x 115) /(60 x 1000) Q2= 0.40 m3/ min [Case 2 Result : Qi +Q2 [Case 2 : Result : 1.03 m3/ min Page 2 of 2

You might also like