Professional Documents
Culture Documents
2
© 2012 TOCICO. All rights reserved.
The Four Big Ones
TOCICO 2012 Conference
TPS/ TQM/
CFM/ BMTP TOC
LEAN SIX SIGMA
GOAL
4
© 2012 TOCICO. All rights reserved.
The limitations of each methology (my viewpoint)
TOCICO 2012 Conference
TYPICAL LIMITATION
MORE DETAILS
Article by
E. Moura and A. Barnard:
http://www.qualiplus.com.br/en/blog
-q/articles/120-the-need-to-integrate-
toc-lean-six-sigma-and-process-
management.html
6
© 2012 TOCICO. All rights reserved.
Why TOC should be the guiding methodology?
TOCICO 2012 Conference
7
© 2012 TOCICO. All rights reserved.
TOC-TP: the most powerful planning method ever!
TOCICO 2012 Conference
1. Why change?
5. How to
sustain POOGI? 2. What to change?
UDEs
mission/ goal
CCC
CRT
TO Map
S&T Tree FRT
INJECTIONS
8
© 2012 TOCICO. All rights reserved.
Why use TOC-TP as the guide to organizational
improvement efforts?
TOCICO 2012 Conference
9
© 2012 TOCICO. All rights reserved.
How to use TOC-TP as the organizational
improvement compass (overview)
TOCICO 2012 Conference
10
© 2012 TOCICO. All rights reserved.
The 1-day CRT Workshop
TOCICO 2012 Conference
− Prioritized sequence of
injection/projects
implementation.
12
© 2012 TOCICO. All rights reserved.
The 5-day UDEs-to-S&T Tree Workshop
TOCICO 2012 Conference
5. TO Map
• Used for full-blown Viable
Vision/ Strategic Planning.
• Deliverables:
− All deliverables from 3-day
workshop, plus:
6. Two-Day S&T Tree Build/ Review
− Solid, cristal-clear logic in
each S&T node and among Tools &
Solutions
all nodes (necessity, parallel
and sufficiency assumptions)
− All areas/functions perfectly
aligned through the vertical
hierarchy and horizontal
sequence of nodes.
− S&T Tree: a tangible tool for
a focused, prioritized and
disciplined strategy 13
© 2012 TOCICO. All rights reserved.
Some Do’s and Don’ts
TOCICO 2012 Conference
15
© 2012 TOCICO. All rights reserved.