You are on page 1of 15

TOCICO 2012 Conference

Using TOC-TP as a Guide to Integrate


Lean, Six Sigma, Process
Management and TOC Solutions for
Business Improvement

Presented By: EDUARDO C. MOURA


www.qualiplus.com.br/en
Date: June 6, 2012
© 2012TOCICO. All rights reserved.
1
TOCICO 2012 Conference

“If all you have is a hammer,


everything looks like a nail”
(Bernard Baruch)

2
© 2012 TOCICO. All rights reserved.
The Four Big Ones
TOCICO 2012 Conference

• TOC, Lean, Six Sigma and Business Management Through Processes


are the four most vital business improvement methodologies
available since decades, having passed the test of time:
− All of them start from a system-wide perspective;
− represent a significant paradigm shift;
− and bring unique contributions to sustainable results (if and only if their
implementation is not distorted by a short-term cost reduction mentality...).

TPS/ TQM/
CFM/ BMTP TOC
LEAN SIX SIGMA

Ohno, Deming, Juran, Ishikawa, Goldratt


Shingo Feigenbaum Harrington

~1945 ~1950 ~1960 ~1984


TPS: Toyota Production System; TQM: Total Quality Management; CFM: Cross-Functional Management; BMTP: Business Management through
Processes
3
© 2012 TOCICO. All rights reserved.
The unique contribution of each methology
TOCICO 2012 Conference

GOAL

TOC To increase organizational prosperity by focusing on the system’s constraint.

Lean To reduce time-to-cash by focusing on waste elimination in the process flow.

Six To increase customer satisfaction by focusing on the variability reduction of


Sigma key product/process parameters.

To increase all stakeholders satisfaction by focusing on the integrated


BMTP
standardization of the business processes flow.

4
© 2012 TOCICO. All rights reserved.
The limitations of each methology (my viewpoint)
TOCICO 2012 Conference

TYPICAL LIMITATION

Tends to be “top management-oriented”only.


TOC Takes process variation as a given.
Tends to be (too) “money-focused”; lacks attention to values and mission.
Tends to be “internally focused” on company’s value streams.
Lean
Does not consider market constraints.

Six Tends to be too “statistics-oriented”.


Sigma Implementers focus mostly cost reduction.

Although it builds an integrated process structure, it does not provide the


BMTP
specific methods for each business process.
5
© 2012 TOCICO. All rights reserved.
The synergistic effect of the integration
TOCICO 2012 Conference

MORE DETAILS

Article by
E. Moura and A. Barnard:
http://www.qualiplus.com.br/en/blog
-q/articles/120-the-need-to-integrate-
toc-lean-six-sigma-and-process-
management.html

Webinar slides by E. Moura:


http://www.qualiplus.com.br/en/even
ts/webinars.html

6
© 2012 TOCICO. All rights reserved.
Why TOC should be the guiding methodology?
TOCICO 2012 Conference

• It starts with the system’s goal and focuses on its constraint.


− No other effort can be of high impact if it does not consider those two vital
aspects.

• Therefore, despite the other three methodologies do have their


focus, TOC provides the focus of the foci...

7
© 2012 TOCICO. All rights reserved.
TOC-TP: the most powerful planning method ever!
TOCICO 2012 Conference

1. Why change?
5. How to
sustain POOGI? 2. What to change?
UDEs

mission/ goal
CCC
CRT

4. How to cause the change?


3. What to change to?
CP

TO Map
S&T Tree FRT

INJECTIONS

8
© 2012 TOCICO. All rights reserved.
Why use TOC-TP as the guide to organizational
improvement efforts?
TOCICO 2012 Conference

• It has been designed to guide any major change process.


• It has the power to identify and challenge political constraints
(management paradigms).
• The rigor of the supporting logical trees prevent decisions
based on erroneous assumptions.
• Its Five Key Questions are a reliable route for a thorough
planning, as well as a disciplined, aligned execution.

9
© 2012 TOCICO. All rights reserved.
How to use TOC-TP as the organizational
improvement compass (overview)
TOCICO 2012 Conference

METHODS & TOOLS


SUPERMARKET

10
© 2012 TOCICO. All rights reserved.
The 1-day CRT Workshop
TOCICO 2012 Conference

• Used to identify high impact


improvement projects, when
no previous strategic planning
has been made.
• Deliverables:
− UDE list by consensus.
− Clear, common vision about what are
the key improvement projects that will
cause a major impact on UDEs.
− Improvement themes assigned to
leaders for further detailed planning
(with specific methods & tools
selected from the “supermarket”,
whenever applicable)
11
© 2012 TOCICO. All rights reserved.
The 3-day UDEs-to-TO Map Workshop
TOCICO 2012 Conference
1. UDE list (brainwrit.+affin. diag.),
• Used when UDE Map
2. CCC(s) ID., 3. CCC(s) analysis/ injections
management team CRT build&analysis
won’t dedicate more
Core
than 3 days to strategic Injections
planning.
• Deliverables:
− Team consensus about
5. TO Map, 4. FRT build & NBs ID./trim
UDEs, Core Problem(s) and Projects Assignement
injections. (PRTs, if needed)

− Validated, solid direction of Side


the global solution (FRT) Injections

− Prioritized sequence of
injection/projects
implementation.
12
© 2012 TOCICO. All rights reserved.
The 5-day UDEs-to-S&T Tree Workshop
TOCICO 2012 Conference
5. TO Map
• Used for full-blown Viable
Vision/ Strategic Planning.

• Deliverables:
− All deliverables from 3-day
workshop, plus:
6. Two-Day S&T Tree Build/ Review
− Solid, cristal-clear logic in
each S&T node and among Tools &
Solutions
all nodes (necessity, parallel
and sufficiency assumptions)
− All areas/functions perfectly
aligned through the vertical
hierarchy and horizontal
sequence of nodes.
− S&T Tree: a tangible tool for
a focused, prioritized and
disciplined strategy 13
© 2012 TOCICO. All rights reserved.
Some Do’s and Don’ts
TOCICO 2012 Conference

• Do the workshops as a team sport (benefit of “automatic buy-


in”). Avoid the “lone ranger + seller” approach.
• Don’t work with too big groups (10-20 people is recommended)
• Make sure the workshop is supported by competent facilitator(s),
with solid knowledge and experience with TOC, Lean, Six Sigma
and Process Management.
• Assure strong leadership: explain and implement the “relay race
work ethics” to erradicate bad multitasking in the execution
phase.
• Assure transparent communication to all stakeholders.
• Check & Act frequently!
14
© 2012 TOCICO. All rights reserved.
Acronyms used
TOCICO 2012 Conference

• TOC-TP: The Theory of Constraints Logical Thinking Process.


• UDE: Undesireable Effect
• CCC: Core Conflict Cloud
• CRT: Current Reality Tree
• FRT: Future Reality Tree
• NB: Negative Branch
• TO Map: Tactical Objectives Map
• PRT: Pre-Requisit Tree
• S&T: Strategy & Tactics

15
© 2012 TOCICO. All rights reserved.

You might also like