PAINT
ASSEMBLY
After tester line, units are sent to road test and then shower line. In case of any defects, units
are transferred to the repair area. Although final GR is being done at final confirmation, we
need mechanism for recoding defects at road test, shower etc with scanning solution at repair
out
PDI
PDI area is decided but repair location for defects being observed during PDI is still unclear.
Repair order might be needed for parts issuance