Customer SEC – COA Contract No.

14410003/00
Panel / Designation / Plain U/G Feeder
Substation No. S/S : 8201 Location: H-24
Contractor AL TOUKHI Co. Drawing No. CE-071947
Sheet No.
Projects & Supplies Co.
Site Test Record SEPAM S40 Page 1 of 2

FINAL SETTINGS TEST

Contact Resistance:
OUTPUT CONTACT
DESCRIPTION CONTACT RESISTANCE
NUMBER
O1 Trip ( 50/51, 50/51N ) 0.2 Ohm
O2 SCADA Alarm ( 50, 50N) 0.2 Ohm
O3 SCADA Alarm ( 51, 51N) 0.2 Ohm
O4 Watchdog 0.2Ohm

Non Directional Over Current Protection:


Accuracy: ± 5 % Drop-off/Pickup Ratio: 93.5%±5%

Non Directional Over Current Protection eLEMENT-1


Set Drop-off/Pickup
Phase Pickup (A) Limit Drop off (A) Limit
Current(I›1) ratio
A 1.2 1.201 1.08 – 1.26 1.13 0.95-1.19 0.92
B 1.2 1.201 0.56 – 0.69 1.13 0.95-1.19 0.93
C 1.2 1.201 0.56 – 0.69 1.13 0.95-1.19 0.93

Non Directional Over Current Protection eLEMENT-2


Set Drop-off/Pickup
Phase Pickup (A) Limit Drop off (A) Limit
Current(I›1) ratio

A 3.33 3.35 3.27-3.41 3.13 3.10-3.34 0.92

B 3.33 3.35 3.27-3.41 3.13 3.10 0.91

C 3.33 3.35 3.27-3.41 3.13 3.10 0.93

Non Directional Earth Fault Protection


Accuracy: ± 5 % Drop-off/Pickup Ratio: 93.5%±5% Non
Directional Earth Fault eLEMENT-1
Drop-off/Pickup
Current Setting (A) Pickup (A) Limit Drop Off (A) Limit
ratio

0.1 0.96 0.98 – 0.120 0.90 0.89 – 0.99 93%

Non Directional Earth Fault ELEMENT - 2


Drop-off/Pickup
Current Setting (A) Pickup (A) Limit Drop Off (A) Limit
ratio

Test Performed by: Test Witnessed by: Date of Test


Name: M. Ahmed Soomro 27-11-2013
Signature
:
Control/Record No.: R/PP/TC/1.101
Customer SEC – COA Contract No. 14410003/00
Panel / Designation / Plain U/G Feeder
Substation No. S/S : 8201 Location: H-24
Contractor AL TOUKHI Co. Drawing No. CE-071947
Sheet No.
Projects & Supplies Co.
Site Test Record SEPAM S40 Page 2 of 2

0.5 0.51 0.475 – 0.525 0.47 0.451 – 0.498 0.92

Non Directional Over Current Protection Operating Time MEASUREMENT: eLEMENT - 1


Is: 1.2 A, ACCURACY = ± 5 % for IDMT & IEE characteristics,
= ± 2 % for Definite Time characteristics.
Cal. Time@ Delay Measured Time
Curve Limits
2 x Is Set at Phase (Secs)
Description
(T)
1.98 – 2.1
SIT 2.05 0.6 A 2.07

Non Directional Over Current Protection Operating Time MEASUREMENT: eLEMENT - 2


Is: 3.33 A, ACCURACY = ± 5 % for IDMT & IEE characteristics,
= ± 2 % for Definite Time characteristics.
Cal. Time@ Delay Limits
Curve Measured Time
2 x Is Set at Phase ELEMENT1
Description (Secs)
(T)
0.355-0.432
DEF 0.4 0.4 A 0.404

Non Directional Earth Fault Protection Operating Time MEASUREMENT: eLEMENT - 1


Is: 0.1 A, ACCURACY = ± 5 % for IDMT & IEE characteristics,
= ± 2 % for Definite Time characteristics.
Cal. Time@ Delay Measured Time
Curve Limits
2 x Is Set at Phase (Secs)
Description
(T)
1.98 – 2.1
SIT 2.05 0.6 A 2.07

Non Directional Earth Fault Protection Operating Time MEASUREMENT: eLEMENT - 2


Is: 0.5 A, ACCURACY = ± 5 % for IDMT & IEE characteristics,
= ± 2 % for Definite Time characteristics.
Cal. Time@ Delay Limits
Curve Measured Time
2 x Is Set at Phase ELEMENT1
Description (Secs)
(T)
0.355-0.432
DEF 0.4 0.4 A 0.404

Test Equipment Used:

1. OMICRON CMC-256 Plus Relay Test System


2. Fluke –V Multimeter

Test Performed by: Test Witnessed by: Date of Test


Name: M. Ahmed Soomro 27-11-2013
Signature
:
Control/Record No.: R/PP/TC/1.101
Customer SEC – COA Contract No. 14410003/00
Panel / Designation / Plain U/G Feeder
Substation No. S/S : 8201 Location: H-24
Contractor AL TOUKHI Co. Drawing No. CE-071947
Sheet No.
Projects & Supplies Co.
Site Test Record SEPAM S40 Page 3 of 2

Test Performed by: Test Witnessed by: Date of Test


Name: M. Ahmed Soomro 27-11-2013
Signature
:
Control/Record No.: R/PP/TC/1.101