Professional Documents
Culture Documents
900
shift shift
shift
A5 CC54 CC55
1400 875
1000 CCG39 CCG40 1000 600
PCG1
2850
575
1400
PCG1 PCG1
1575
shift
900 CC2
CC1 PCG1
A4 PCG1 shift CCG1 CCG2
1350
PCG1
shift
shift
625
625
A3
CC3 CC4
shift
900
PCG1 PCG1
shift
175
CCG3 CCG4
3150
300 700
shift shift
A2 CC5 CC6
CCG5 CCG6 700
1350
CC7 shift
A1
1275
CCG5
shift
1275
shift
PCG2 CC8 PCG2
250 CCG7
shift
900
shift
4375
PCG2 PCG2 1200 200
shift
900
DATE Rev PARTICULARS Drwn Check
shift
200
950
V CC12
550
1600 CC11 CCG11
CC9 CC10 CCG10 900 CC13 CC14 REVISIONS :
CCG8 CCG9 LIFT-4 CCG12 CCG13
3500
shift
CC15
CC16 CCG14
U
CCG10 950
shift
CC17
500
100 shift
CCG10 K'
GENERAL NOTES :-
3500
35
CC19 CC20 J'
50
CC18 2. MISSING OR AMBIGUOUS DIMENSIONS IN ANY DRAWING ARE
CCG15 CCG16
3200
CCG15
DC1 I' TO BE CLARIFIED FROM AUTHORITY CONCERNED.
22
DCG1
05
S H' 3. DO NOT SCALE DRAWING, FOLLOW ONLY WRITTEN DIMENSIONS.
18
CC21 CC22 CC23 CC24 CC25 DC2
00
CCG10 CCG17 CCG18 CCG19 CCG16 DCG2
G' 4. PLEASE CHECK THE DIMENSION WITH RESPECT TO ARCHITECTURAL
25
00
F'
PLANS BEFORE EXECUTION.
10
sh
7200
DC3
0
ift
PART-C DC5
DCG3 DC4
DCG1
STRUCTURAL NOTES :-
0
ift
10
1. TYPE OF STRUCTURE :- R.C.C. FRAMED STRUCTURE HAVING
62
DCG4 sh
05
DC6 E' GROUND + 4 FLOORS & ONE FUTURE FLOOR IS CONSIDERED.
R
DCG5 ONE FUTURE FLOOR IS CONSIDERED PART A,B,C & D .
CC26 CC27 CC28 CC29 CC30 DC7 2. DESIGN FORCES :-
CCG10 CCG19 CCG20 CCG17 CCG16 DCG6
3700
41
DC8 DC10 D' DEAD LOADS IS : 875(PART-1)
50
100 100
sh 0
10
DCG7 DCG1
ift
shift
sh 5
shift DC9 LIVE LOADS IS : 875(PART-2)
17
DC11
ift
Q DCG4 DCG8 EARTHQUAKE LOADS IS : 1893-2002,IS:13920-1993 (EQ. ZONE III, R=5, I=1.5)
CC31 CC32
43
CCG21 CCG16 C' 3. SPECIFICATIONS OF P.C.C./R.C.C. WORK SHALL BE AS PER IS : 456-2000.
50
3500
DC12
DC13 DCG3
DCG9 DC14 4. CONCRETE GRADE:- R.C.C M 25, P.C.C (1:4:8) UNLESS SPECIFICALLY STATED.
P DCG8 5. (5.1) CEMENT FOR R.C.C. WORK :- 53 GRADE CEMENT.
DC15
41
sh 5
CC33 CC34 CC35 DCG4 DC18 B'
17
00
DC16
10
sh (5.2) REINFORCEMENT :- HYSD/TMT STEEL (CRS FE-500 GRADE) UPTO PLINTH AS PER IS :1786-2008
ift
CCG10 CCG17 CCG22 DC17
0
DCG10 ift DCG1
sh 0
4000
DCG11
10
(5.3) REINFORCEMENT :- HYSD/TMT STEEL (Fe-500D GRADE) ABOVE PLINTH AS PER IS :1786-2008
ift
5100
DC20 DC19
shift DCG12 6. ALL COLUMN SIZE REDUCTION SHALL BE DONE BY EQUALLY
35
DCG13 A'
50
O CC38 DC24 DC21 ON BOTH SIDE HENCE CENTER LINE OF BOTH UPPER & LOWER
CCG10 DC22
CC36 CC37 DC23 DCG13 DCG14 DCG5 COLUMN SHOULD BE THE SAME.
shift
100
CCG23 CCG24 DCG13 DC25 5
DC26
PART-D 17
3700
400 DCG8 7. MORTAR PROPORTION IN AERATED LIGHT WEIGHT CONCRETE BLOCK : 1:5 CEMENT MORTAR.
shift
75 DCG15
250
ift
150 400 DC33 DC28
sh
15 ift
shift
shift
250
0
shift CC43 DCG1
sh
CCG27 shift DCG17 5 DC27
N CC42 CCG28 DC30 DC31 7 DC29 DCG3 FOOTING : 60 mm COLUMN : SIDE UP TO 200 = 30 mm
CC39
ift
CCG10 75 CC44 DCG13 DCG13 DCG16 DC32
sh
CCG25 CC40 SLABS : 25 mm
sh 0
CCG29 DC34 SIDE ABOVE 200 = 40 mm.
10
CCG26 100 LIFT-3 100 shift 5150 DCG8
ift
75 DCG15 DC35 BEAMS : 30 mm
3850
50
shift shift DCG2 1'
28
100 DC36 CLEAR COVER SHALL BE MEASURED FROM STIRRUPS.
5
ift
sh 5
1350
17
sh 0
7
DCG14
10
sh
ift
CC45 CC46 shift DC37
ift
M CCG30 CCG31 DC39 DC40 DC38 9. ORIENTATION OF COLUMN SHALL BE STRICTLY FOLLOWED AS SHOWN IN THE PLAN.
150 CC47 CC48 DCG4 DCG6 2'
DCG18
shift
59 ift
DCG13
50
shift CCG33 10. IN COLUMNS NOT MORE THAN 50% BARS SHALL BE SPLICED AT A SECTION.
0
150 150 CCG32
sh
3300
00
DC45 DC41
sh 0
75 DC42
66
CC53
10
CC49 shift shift CC52 DCG4 DC44 11. ALL COLUMNS REINFORCEMENTS SHALL BE WITH STAGGERED LAP JOINT.
ift
DCG19 DC43
ift
CCG38 DCG14
shift
shift
CCG37 DCG4
250
250
DCG21 0 DCG15
ENGINEER IN ACCORDANCE WITH IS-456/2000.
sh
AC5
shift
shift
200
200
ift
DC47
75
ACG3
39 ift
ACG2 DCG4
00
5
75 100 DC51
sh
59 ift
CENTERING,SHUTTERING, QUALITY OF CONSTRUCTION MATERIAL
sh 0
69
25
shift
250
10
0
sh DCG15
26
shift shift
ift
DC53 DC52 AND WRONG INTERPRETATION OF DRG.
16 hift
J DCG4
20
DCG4
sh 0
s
AC7
10
14.CONTRACTOR SHALL BE FULLY RESPONSIBLE
ift
AC6 ACG6 AC8 AC9 42 DC54
ACG3 ACG7 ACG3 0 DCG22 DC55 FOR ALL EXECUTION WORK AT SITE.
LIFT-5 DCG13
4650
11
sh 20 4'
DC56 tif DC57 15. THE EXCAVATED AREA OF PLINTH/FOUNDATION TO BE REFILLED WITH
00
sh
DCG23
27
25
60
ift
DCG24
05
MURRUM/GOOD EARTH OR AS DIRECTED BY EIC.
18
DC58
I DCG4 16. COMPACT THE MURRUM TO GIVE A FIELD DENSITY OF 60-62 KG/CFT (2.3GM/CC),
16 hift
shift
shift
shift
AC10 AC11
400
400
400
20
ACG8 ACG9 AC12 AC13 AC14 s 17. MINIMUM SAFE BEARING CAPACITY OF SOIL FOR FOUNDATION MUST BE
ACG10 ACG3 ACG3 DC59 5'
DCG25 150 KN/SQM.(15.0 TON/SQM). AT 2.5 M. DEPTH FROM LOWEST EX.G.L. OR UP TO HARD STRATA.
75
11 18. DEVELOPMENT LENGTH ( Ld ) OF BAR FOR SPLICING SHALL BE ASPER
61
6850
20
LAP LENGTH SCHEDULE OF BAR.
sh
DC60 ift 19. R.C.C. BAND SHOULD BE PROVIDED AT WINDOW SILL LEVEL.
DCG26 DC61 DC62
DCG13 DCG13 20. CHICKEN WIRE MESH SHOULD BE PROVIDED AT ALL THE JUNCTION OF
25
6'
39
H R.C.C. AND BRICK WORK.
AC15 AC16 AC17 AC18 AC19 6270 21. ABOVE ROOF LEVEL COLUMN FOR FUTURE EXPANSION SHALL BE
ACG2 ACG11 ACG12 ACG3 ACG3
7' CONSTRUCT UP TO 1200MM HEIGHT.
25
DC63
39
DCG13
7100
8'
DC64
AS-BUILT DRAWINGS
3500
DCG13
G
AC20 AC21 AC22 AC23 AC24 DC66
2750
AC31
ACG16
BC1
E AC25
ACG2
AC26
ACG3
AC27
ACG3
AC28
ACG3
AC29
ACG8
AC30
ACG15 BCG1 BC2
BCG2
BC3
BCG3
BC4
BCG4
BC5
BCG5
BC6
BCG1 OF RAJASTHAN
7200
D AC36
AC38
ACG20 NATIONAL BUILDINGS CONSTRUCTION
AC32 AC33 AC34 AC35 ACG18 AC37 AC39 BC7 BC8 BC9 BC10 BC11 BC12
ACG2 ACG9 ACG17 ACG9 ACG19 ACG21 BCG1 BCG6 BCG6 BCG7 BCG8 BCG1 CORPORATION LIMITED
4000
AC41 PART-B
7000
ACG23
AC40
ACG22 ASSOCIATE CONSULTANT :-
2700 750 400 AKA CONSULTANTS (INDIA) PVT. LTD.
2800
shift
1:200
AC61
BC19 ANNUALLY & UP GRADATION OF GOVT. DIST. HOSPITAL
BCG14
AC53 AC54 AC55 ACG34 INTO TEACHING HOSPITAL, DUNGARPUR,RAJASTHAN.
B ACG31 ACG32 ACG8
AC52 AC56 AC57 AC58 AC59 AC60 BC20 BC21 BC22 BC23 BC24 BC25
2350
shift
ACG30 ACG10 ACG3 ACG10 ACG3 ACG33 BCG15 BCG16 BCG12 BCG12 BCG12 BCG13
AC62
COLLEGE BLOCK
7000
ACG35
TITLE :-
SIZE COLUMN CENTER LINE PLAN
A
A1
AC63 AC64 AC65 AC66 AC67 AC68 AC69 BC26 BC27 BC28 BC29 BC30 BC31 BC32
ACG36 ACG8 ACG2 ACG3 ACG2 ACG37 ACG38 BCG17 BCG18 BCG19 BCG20 BCG21 BCG4 BCG22 DATE : - 04.05.2020 DRWN BY :- V.S. CHKD BY :- S.G.
750 3200 4000 2350 850 3600 3600 3200 4000 3200 2650 1500 2700 3350 3850 3600 3600 7200 7600 6800
3350 2700 3700
400 650 NORTH
26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
N
W NW
N
NE
THIS DRAWING IS COPYRIGHT OF-
W
SW
E
NATIONAL BUILDINGS CONSTRUCTION CORPORATION S
SE
E
LIMITED (NBCC), AND IS NOT TO BE REPRODUCED, STRUCTURE ENGINEER ARCHITECT
COLUMN CENTER LINE LAYOUT HANDED OVER TO OTHER PERSON OR USED FOR ANY
S