You are on page 1of 1

Before Installation of water tank, put pump cover up to deck an mark places (4) to drill 9/32 holes.

Drill deck at 10 inches in from the left side of the broom and even with the bottom of the deck. After
installation of pump cover TACK weld bolts to the deck. After pump cover has been installed the tank can
then be installed. (Tank installation refer to pg.2).

Assembly of Parts for Water System


Note: Tack weld top of bolts

Drill 9/32 Holes (4)


10

RJ−350

You might also like