Has ® HydraRig. CERTIFICATE OF HYDROSTATIC OPERATIONAL TEST DATE: January 9, 2015 Panes Conia JOB NO. 31122/111934 Reve. Pa sans (CUSTOMER: OILSERV OILFIELD SERVICES LTD pot EQUIPMENT TESTED: EQUIPMENT: SPECIFICATIONS: METHOD OF TEST: 3322 REEL ASSEMBLY- CD402574 (Rev. A) Internal Plumbing - CD422247 External Plumbing: CC422261 30,000 PSI Gauge S/N 030505 Calibration Due Date: 3/31/2015 30,000 PST Chart Recorder S/N 242E-441263 Calibration Due Date: 7/31/2015 Hydro Test No. CA980070 (15,000 Operational Test) 1. Install all required test plugs and/or caps. 2, Attach Hydro-test pump and purge plumbing completely of all air, 3. Slowly raise pressure to 5,000 PSI, and check for leaks, If leak cours, fix and return to step 24. If no leaks occur, continue. 4, Slowly raise pressure to 10,000 PSI, and check for leaks, If leak occurs, fix and return to step 24. If no leaks occur, continue, 5. Slowly raise pressure to 15,000 PSI, hold for three minutes and check for leaks. If leak occurs, fix and refurn to Step 24, If no leaks occur, continue. 6. Relieve pressure, and then slowly raise pressure to 15,000 PSI, hold for 15 minutes and check for leaks. If leaks ocour, fix and return to step 24, If no leaks occur by end of 15 minute hold period then the Plumbing has successfully completed the Hydro-test. No leaks observed. Hydro-Operational Test accepted. STATEMENT ‘The above equipment has been tested as described above, and has met all performance and material specifications stated according to our testing standards. Hydra Rig ‘Company Name “ Bowers oh Quality Assurance Cdl — 1 fa Joos ‘Testing Activities > — > — CA SS eo WY He Ss le i hil i eu AUN A : | Vv So yi —\ | ) GZ WN Yi ~ ay ~ \S SS aii2x [III 934 Operational Test 15,000 PSI Hydrostatic Test Procedure Customer OILSERV Sales Order Number 31122 Symix Job Number 141934 Description of equipment to be tested TUBING REEL HR 3322 WIINT.& EXT, PLUMBING DrawingiPart Number CD402574/8 Pre-Startup Safety Checklist (Initial each item when accomplished) 1. Received the following documents JE Router JE Drawing of item to be tested 2. JE Appropriate Job Hazard Analysis (JHA) has been selected or created JHAnumber 404 3. JE Router recelved matches the drawing received JE Drawing received matched part received 5. JE Test procedure matches the test procedure cailed out on drawing 6. JE Reviewed JHA with all personnel involved with the test 7. JE All personnel involved with test have appropriate PPE. 8. JE Tummed on Yellow warning light 9, JE Test area has been properly secured and corded off 410. JE Proper barricades are in place and in accordance with JHA Operational Test 15,000 PST Document Date: July 26, 2002 Next Assembly: N/A Revision: . Page 1 of3 Drafter: DJH - Checker: DWM - Engineer: JG Part Number: CA980070 Operational Test 15,000 PSI Hydrostatic Test Procedure 11, Check all test plugs, caps and other subs fo be used for the following JE Good working condition JE Certifications are current 12. Check al bolted connections for the following JE Proper bolting materials and ratings per design drawing JE Proper torque requirements per design drawing 13. Check testing equipment forthe following JE Test gauge has current cafibralions Test gauge serial number 030505 Test gauge calibration due date 03/31/2015 LE Chart recorder has current calration ‘Chart recorder serial number 444263, Chart recorder calibration due date 07/31/2015 JE Equipment in good working condition 14, Checked indicating pressure gauge for the following Range of gauge to be approximately 30,000 psi (Double the test pressure] xu Range of gauge not less than 22,600 psi [1-1/2 times test pressure] JE Range of gauge not more than 60,000 psi [4 times test pressure] AE Connected directly to a component ofthe item to be tested JE Visible to the operator controlling the pressure 16. JE Chart recorder connected parallel to indicating pressure gauge 16. JE All fest plugs, caps and subs are installed 17. JE Bleed ports exist at all high points of testitern 18. JE Attached test pump and bied all air from the test iter 19. JE Air bled from all high points on test item 20, JE Test item is void of air pockets | Pressure Test Before starting the pressure test described below, the above checklist must be completed and all noncompliant issues resolved 21, JE Sounded test warning horn 22. JE Turned off yellow warning light 23, JE Turned on Red warning light Next Assembly: N/A Revision: Original Drafter: DJH - Checker: DWM - Engineer: JG Part Number: CA980070 Document Date: July 26, 2002 Page 2 of 3 Operational Test 15,000 PSI Hydrostatic Test Procedure 24, JE Raise pressure slowly to 5,000 psi 25, JE No leaks at 6,000 psi ita leak occurs, reduce pressure to zero and fix leak. Return to step 24 26. JE Raise pressure slowly to 10,000 psi 27, JE No leaks at 10,000 psi Ifa leak occurs, reduce pressure to zero and fix leak Return to step 24 28, JE Raise pressure siowly to 18,000 psi 28, JE No leaks at 15,000 psi after 3 minute hold period Ifa leak occurs, reduce pressure to zero and fix leak, Return to step 24 380. JE Reduced pressure to zero 31. JE Raise pressure slowly to 15,000 psi 32. JE No leaks at 16,000 psi test pressure after 18 minutes, Ifa leak occurs, reduce pressure to zero and fix leak, Return to step 24 ‘83, JE No pressure variations during 16 minute hold period 34, JE Reduced pressure to 260 | 35. JE System has successfully completed the above test | 36. JE Sound warning horn 37. JE Turn off red warning light 38. JE Remove all test plugs and disconnect test item from test pump The above hydrostatic test was successfully completed by Certified Testing Activities Technician Date 1/9/15, Document Date: July 26, 2002 Next Assembly: N/A Revision: Original Part Number; CA980070 Page 3 of 3 Drafter: DJH - Checker: DWM - Engineer: JG eee eee Seana 380 Oy suopeiede snosumymung 3 saunstou uonsajord nepanpry somsvau uonvonsid wogaiiog —- 31 (hide exp as01p 392u9) ‘SNOLLAVORYa TVIDgas "BHO aT 2byeh woy fea sino) pu adeys poo8 ware spico POINT ADL sompooaad Ages SA MPAH paysgR aon gS supjd uonse foualiaia Jo uoneustio gofens ae Stans porreiceds 6 (Aide yep aso 3045) SALVE RIOM HVS TAVOTTEaY m0 sued poSewep 10 Suoum Susy spoepns pjoajoy 10 seSpe dies spoys eouNsD|g, epusied ye sprecey Sumy yL #(Adde exp 950m 219949) SCMVZVH TVILNALOA Va VDE RRS 7 TA ET aa RS TT TTT % OT RS SF PSS OSES VEC VEE VT E Tm spon! anaey stuns anes oueg an PROT TON a POORERT ES a “RIAGHOWT WO NOLOV GINTNOOT SEIS ARRAY T SCUVZVH TVLINALOT ‘SdALS AOF SISVA FO TONANOTS ‘erent et 344 KWVINTON OM Pores ul ay LP aus ‘sou waazo saan aio o¥aAK Nouvootasa eottiezite xsennce0r ‘su eau ommeouora | HLM eeu Tay ananontoEne SAN, NIBSTIO ENOLsNS Tab aoe Tae TOSS SN) NSE SAIS CRS TOW SISXTVRY GVZVH OF SISKIVNV C4VZVH FOr OR PACA

You might also like