STEEL SUPPLY AND RECONCILIATION REPORT

Name of Barge : Coastal Constructor PO 1208 Period From : 15.01.2020 To : 11.02.2020 PO 1206
Project Incharge: Mr.Ratan Bhowal DGM-(MOG) DELIVERED LOCATION Vendor Name: NARANDAS & SONS FABRICATORS FABRICATION LOCATION
Prepared By: Rajesh Kanna Balachandran Narandas Taloja Work: SPUD WITH STOPPER PAD FABRICATION NARANDAS TALOJA
Steel Supplied Steel Consumed
Date of Size Weight as per Weight Size
Sl No PO No PO Date Details of Steel Po No PO Date
Supply Lth Wdth Thk Qty Actual Weight PO Diffrerance Details of Work Lth Wdth Thk Qty Weight Weight(Final) Remarks
1 MS 12 2.5 25 5 29437.5 29537 99.5 SPUD 4 nos with 624 Pads 7.5 4.323 25 4 29860
1208 06.01.2020 11.01.2020 Diaphragm RingOD660 ID460
2 MS 12 2.5 30 1 7065.00 7813 748 1206 06.01.2020 (77.02Kgs Each) 25 8 616
30660
36502.50 37350 848 Test Sample1 0.3 0.3 25 2 35
Balance Scrap to
Actual Weight (Total) 36502.5 Test Sample2 0.3 0.3 30 1 21
Return
Weight Difference 847.5 Total Consumed 30532.343
537Kg Reusables
Total weight Supplied as per PO 37350 Reusables
4286.1 Kgs
Total Consumed 30660 1477 07.02.2020 Rolling of 30mm Plate 4.2 2.5 30 1 2472.75
Burnning Loss (5%) 1867.5 25mm Plate 3.3 2.5 25 1 1619.0625
Total Reusbles 4286.1 25mm Plate 2.2 0.45 25 1 194.2875
Balance Remaining 536.4 Total Reusables 4286.1