You are on page 1of 2

Access to plant;

Manpower:

 Aramco ID for restricted area,


 SAOO Orientation Card

Equipment and Vehicles;

 Painted Door No.


 Maintenance Sticker (3rd party, Saudi Aramco, Internal PM Sticker)
 PWAS for heavy equipment and earth moving equipment
 Calibration sticker for specialized equipment
 Plant access sticker or Temporary access
 Material Gate Pass for tools and equipment

Skilled Manpower:

 Fire watcher
 First Aiders
 Gas Tester
 Standby Man
 Confined Space Entry Supervisor
 Work Permit Receiver
 SCBA Operator
 Supervisor for concerned discipline
 Safety Officer
 Certified Operators (Heavy Equipment) and Rigger

Documents;

 Approved Method Statement


 Approved JSA
 Approved Pre-Excavation Checklist
 Approved IFC Drawings

Safety Equipment and Tools

 MX-4 Gas Detectors (Calibrated)


 Personal H2S Monitors (T40-Rattler) (Calibrated)
 Cable Detector (Calibrated and certified)
 Environmental Monitor (Kestrel 3500)
 Fire Extinguishers (UL/FM Listed)
 Warning signs and barricading
 SCBA Equipment
 First Aid Box (fully equipped)

Welfare:

 Water Igloos
 Cold water
 Rest shelter (ventilated as per Heat Stress plan)
 Toilets facilities
 Potable water
 Standby car at site
 Food serving area
 Food storage arrangements

You might also like