You are on page 1of 10
NAME OF WORK:CONSTRUCTION OF BRIDGE | PROJECT NO, 6a ON VATRAK RIVER AT KHEDA VILLAGE ON c KHEDA-DHOLKA SH-16 REVISION NO. 0 Annexure D DL and Lt Calculation Prepared | Checked ee amat [vs DLof superstructure. Total With of Bridge Bam Crash Barr Clear cariage way 105m Ontet 045m Expansion joint 40 mm on tight 085m CIC distance bet” Pedestal 190m Foctpath Span Length 228m Ontet 1s om Span2 Length 2338 m on fight Bo CIC astance bering of span 248m Kero Incnation Leo ontet 04 om End Portion Length 2m OnRight om Vary portion length 4m = Mid Porton Length 1692 m Noof anes = 3 Over Hang Slab at oie 045m 2) DLofGirder+ Deck lab Area(m®)—tength(m) Density 1) Mid Portion 710 x 1693 x25 panes vary Porton 810 4k iw 3) End Porton 310 2 xB i nN 2) DL of Diaphragm No. Length(s) With (n) Depth (im) Density End Diaphragm Oy ciety ape) ope) ee Coss Grder 2 ox 80s x 03 x ae x 8 2 _ 96a WN Bea aN 3) dLotee No, Area(m®) —Length(m) Deny crash ari ee ye ose se cee 4) DLotRce Rating No. Area(m')—Length(n) Density nec Rating a ose canal ee Gea 4) vLotwe ows Thickness of wearing course: 0.065 m Considered Pressure 2 kN Density of Weatng Course 25 kNm® | Areaotwe 210954 Pressure of We 1625 ui? | toad £21.08 kv Summury of Forces MBPS Me 2O0 | ou (G+0) 21339 ams 21338 ams O(a) 1732 132 32 a2 ce 1929 1231923 123 faling _ 159.0 1590 _ 1590 1590 26569 2658926589 26585 > 9 ay) aio ato 31.0 NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 764 ; ‘ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. o A aad Prepared | Checked . =: areca ;nnexure D : DL and Lt Calculatulon fama ae Soe ees ‘Transverese Eccentrity of DL Load:-1 DL of Left Crash bartior = toad x Eccentricity = 1929 x 665 = 1282685 kN.m load:-2. DLof ight Crash brie | = load x Eccentricity 1929 x 475 916.208 kNm toad:-3 DLof Railing = toad x Eccentricity 3179 x 565 21141 kum otal momemt due toeccentrcity of = Load1 + Load2_— + Load 3 1282685 - 9162038 - 2114099 174762 kN 7 He i ML ur iN iN AN ium | 1m ou, 5177 | 0.00 0.00 (0.00 | 1747.62 we 62191 | 000 0.00 0.00 0.00 NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECTNO. oa (ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISIONNO. o : Prepared | Checked Annexure D: DL and Ut Calcuiatuion ° eee KAMAL WS Live load Analysis. 1) Prax Case 1A) Class 70R W eM@R = 0 Ry x 21d8 = 8 x 1417 + 12 x 82 + 12 x 1964 + 17 x 2177 fe = _smaae_+ 21744 + 23560 + 37000 eee i. a6 sat omen + 0 rr ——— Re 29a + 317.39 + 369.24 nae Ro = 457 T Ro = sa; Re frotal = Re + Re so. 487 e+ 457 Dogot 2 wat by classA aya ta a 6a 68 68 68 34 oy pr, <— | i = Jy J i | nas 1 nae Mor 58 229 = Re R= 28 Sa = Ro mons 0 Ry x 2148 = 27 x 1334+ 27 0 184 + M4 x 176 + 114 x 188 NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64 ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. ° Prepared | Checked Annexure D: tulon Dt and tt Calculatul ae Re 3602+ 3899 + 201.10 + 21478 7a8 Ro= 29 T & = 282 Ry m2 - 29 = 3a 7 BM@R = 0 Reo x 48 = 68 x 1272+ 6B x 157 + 68 x 187 + 68 x 27 Re = 96496 + 106.896 + 127.296 + 147.696 2ae R= Me TR m2 > fe a m2. 18 29 + 218 = 54 7 = 47T For, Nooflanes 3 3 Lanesof class A 39390 1 ‘Combination with lass 70R + Class A 33392 T 19 1604 T 66 T 684 1 1618 T 3 [Cass A] NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 964 ‘ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. ° Prepared | Checked ‘Annexure D : DL iculatul ‘and LL Calculatuion Pana 7s ‘Transverse moment for Pax Case ‘Class Avehicle Ast vehicle 2nd vehicle ard vehicle ‘Transverse Moment (Due to first vehicle) ‘Transverse Moment (Due to Second vehicle) ‘Transverse Moment = (Due to Third vehicle) ‘lass 70 Rvehicle + Class A ast vehicle 2nd vehicle 70R Class A Transverse Moment (Due to Third vehicle) Transverse Moment {Due to forth vehicle) Load x Eccentricity moth : | | a afl | ee we a, oan = 44.667 x 4a -183.10 Tm NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64 ‘ON VATRAK RIVER AT KHEDA VILLAGE ON. KHEDA-DHOLKA SH-16 REVISION NO. ° Annexure Prepared _[ Checked 2) Mba, Case ee | —_ : a ne | BM@m = 0 Re x 2148 = 8 x 901 + 12 x 1299+ 12 x 1451 + 17 x 1668 Wx 101+ 17 x 206 + 37 x 2243 R 7232_+ 15588 + 17412_+ 26288 + 30617 _+ 35802 _+ 38131 21.48 = m6 Tm 100 fe = 10 = a6 aa 1 B) Class A 68 68 68 68 14 116 roid d ” yy “ee 1 moe 1d 389 eM@R = 0 Rx 248 = 114 x 2241 + 4 x 212 + 6B x 169 + 6B x 139 + 68 x 109 + 68 x 79 Ry = _25547_+ 26179 + 11699 + 9659 + 7419 + 5379 21.48 NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 9164 ‘ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. ° Prepared | Checked Annexure D : DL an yexure D : DL and Ut Calculatulon AMAL Vi For, Nooflanes 3 3 Lanesof Class A ay 119.44 T ‘combination with class 70R + Class A oo 3056 T 4 T [For Cass 70R + Class A) NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 9164 ‘ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. ° Prepared | Checked ‘Annexure D: DL and Ut Calculatulon Tana TT Transverse moment for Piya C85@ f Senkee 7 : wee 0m mndverie | 05 m fL—il L L} 133 ’ ‘Transverse Moment = Load x Eccentricity (Due to frst 3886T x 30 vehicle) 11659 Tm [Transverse Moment Transverse Moment = Load x Eccentricity > 11659 - 1943 - 11659 (uctoSecond - 3886T x 05 Js 1943 tm vehicle) 19.43 Tm Transverse Moment = Load x Eccentricity (Due to Third 3886T x 30 vehicle) “11659 Tm ‘Glass TOR vehicle + Class A JOR stele Class A 2nd vehicle 33 Transverse Moment = Load x Eccentricity (Ove to Third 80577 x 1705, [Transverse Moment vehicle) = 13738 Tm = 13738-15935, Transverse Moment = Load x Eccentricity = 2197 tim (Ouetoforth = 3886T x aa vehicle) = 15935 Tim NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64 (ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO. ° Annexure D : DL and Lt Caleviatulon Prepered | checked KAMAL ws 3) MT pax Ca8e ‘A) Class 70R W a9per n ] oer | — - | 15] ‘Transverse Moment Load x Eccentricity 89.26T x 1.705 = 15219 Tim a P HL aT ML MT kN, kN. KN. EN. KN. Prax 7493.3 0.0 0.9 29.8 527.8 | [ML max 1271.2 0.0 0.0) 1207.6 198.7 [MT max 1046.2 0.0 0.0 392.3 23588 NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO, 164 ON VATRAK RIVER AT KHEDA VILLAGE ON KHEDA-DHOLKA SH-16 REVISION NO, ° Prepared | Checked Annexure D : DL and LL Calculatul meen KAMAL WS Footpath live load bridge is having a length of 21.48 m_ 50 It comes in range of 7.5 m to 30m. (According to clause 206.3.b ) P= Pe. _(40L-300 9 = so - | 40 21.48 300 9 = 500 = 62.1333 = 437.87 kg/m? P= 4.38 KN/m* Area of Footpath width x Length 1s x 2338 35.07 mt Total load of Footpath 35.07 x 4.378667 = 153.5598 kN P HU aT ML MT kN. KN kN kN. kN. 153.6 0.0 0.0 0.0 8359)

You might also like