NAME OF WORK:CONSTRUCTION OF BRIDGE | PROJECT NO, 6a
ON VATRAK RIVER AT KHEDA VILLAGE ON c
KHEDA-DHOLKA SH-16 REVISION NO. 0
Annexure D DL and Lt Calculation Prepared | Checked ee
amat [vs
DLof superstructure.
Total With of Bridge Bam Crash Barr
Clear cariage way 105m Ontet 045m
Expansion joint 40 mm on tight 085m
CIC distance bet” Pedestal 190m Foctpath
Span Length 228m Ontet 1s om
Span2 Length 2338 m on fight Bo
CIC astance bering of span 248m Kero
Incnation Leo ontet 04 om
End Portion Length 2m OnRight om
Vary portion length 4m =
Mid Porton Length 1692 m Noof anes = 3
Over Hang Slab at oie 045m
2) DLofGirder+ Deck lab
Area(m®)—tength(m) Density
1) Mid Portion 710 x 1693 x25
panes vary Porton 810 4k iw
3) End Porton 310 2 xB i
nN
2) DL of Diaphragm
No. Length(s) With (n) Depth (im) Density
End Diaphragm Oy ciety ape) ope) ee
Coss Grder 2 ox 80s x 03 x ae x 8 2 _ 96a WN
Bea aN
3) dLotee
No, Area(m®) —Length(m) Deny
crash ari ee ye ose se cee
4) DLotRce Rating
No. Area(m')—Length(n) Density
nec Rating a ose canal ee Gea
4) vLotwe ows
Thickness of wearing course: 0.065 m Considered Pressure 2 kN
Density of Weatng Course 25 kNm® | Areaotwe 210954
Pressure of We 1625 ui? | toad £21.08 kv
Summury of Forces MBPS Me 2O0
|
ou (G+0) 21339 ams 21338 ams
O(a) 1732 132 32 a2
ce 1929 1231923 123
faling _ 159.0 1590 _ 1590 1590
26569 2658926589 26585
> 9 ay) aio ato
31.0NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 764 ;
‘ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. o
A aad Prepared | Checked . =: areca
;nnexure D : DL and Lt Calculatulon fama ae Soe ees
‘Transverese Eccentrity of DL
Load:-1 DL of Left Crash bartior
= toad x Eccentricity
= 1929 x 665
= 1282685 kN.m
load:-2. DLof ight Crash brie |
= load x Eccentricity
1929 x 475
916.208 kNm
toad:-3 DLof Railing
= toad x Eccentricity
3179 x 565
21141 kum
otal momemt due toeccentrcity of = Load1 + Load2_— + Load 3
1282685 - 9162038 - 2114099
174762 kN
7 He i ML ur
iN iN AN ium | 1m
ou, 5177 | 0.00 0.00 (0.00 | 1747.62
we 62191 | 000 0.00 0.00 0.00NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECTNO. oa
(ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISIONNO. o
: Prepared | Checked
Annexure D: DL and Ut Calcuiatuion
° eee KAMAL WS
Live load Analysis.
1) Prax Case
1A) Class 70R W
eM@R = 0
Ry x 21d8 = 8 x 1417 + 12 x 82 + 12 x 1964 + 17 x 2177
fe = _smaae_+ 21744 + 23560 + 37000
eee
i. a6
sat
omen + 0
rr ———
Re 29a + 317.39 + 369.24
nae
Ro = 457 T Ro = sa; Re frotal = Re + Re
so. 487 e+ 457
Dogot 2 wat
by classA
aya ta a 6a 68 68 68
34 oy pr,
<— | i
= Jy J i
| nas 1 nae
Mor 58 229 = Re R= 28 Sa = Ro
mons 0
Ry x 2148 = 27 x 1334+ 27 0 184 + M4 x 176 + 114 x 188NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64
ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. °
Prepared | Checked
Annexure D: tulon
Dt and tt Calculatul ae
Re 3602+ 3899 + 201.10 + 21478
7a8
Ro= 29 T & = 282 Ry
m2 - 29
= 3a 7
BM@R = 0
Reo x 48 = 68 x 1272+ 6B x 157 + 68 x 187 + 68 x 27
Re = 96496 + 106.896 + 127.296 + 147.696
2ae
R= Me TR m2 > fe a
m2. 18 29 + 218
= 54 7 = 47T
For, Nooflanes 3
3 Lanesof class A 39390 1
‘Combination with lass 70R + Class A 33392 T
19
1604 T 66 T 684 1 1618 T
3 [Cass A]NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 964
‘ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. °
Prepared | Checked
‘Annexure D : DL iculatul
‘and LL Calculatuion Pana 7s
‘Transverse moment for Pax Case
‘Class Avehicle
Ast vehicle
2nd vehicle
ard vehicle
‘Transverse Moment
(Due to first
vehicle)
‘Transverse Moment
(Due to Second
vehicle)
‘Transverse Moment =
(Due to Third
vehicle)
‘lass 70 Rvehicle + Class A
ast vehicle
2nd vehicle
70R
Class A
Transverse Moment
(Due to Third
vehicle)
Transverse Moment
{Due to forth
vehicle)
Load x Eccentricity
moth
:
| |
a afl |
ee
we
a,
oan
= 44.667 x 4a
-183.10 TmNAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64
‘ON VATRAK RIVER AT KHEDA VILLAGE ON.
KHEDA-DHOLKA SH-16 REVISION NO. °
Annexure Prepared _[ Checked
2) Mba, Case
ee |
—_ : a
ne |
BM@m = 0
Re x 2148 = 8 x 901 + 12 x 1299+ 12 x 1451 + 17 x 1668
Wx 101+ 17 x 206 + 37 x 2243
R 7232_+ 15588 + 17412_+ 26288 + 30617 _+ 35802 _+ 38131
21.48
= m6 Tm 100 fe
= 10 = a6
aa 1
B) Class A
68 68 68 68 14 116
roid
d ” yy
“ee 1
moe 1d 389
eM@R = 0
Rx 248 = 114 x 2241 + 4 x 212 + 6B x 169 + 6B x 139
+ 68 x 109 + 68 x 79
Ry = _25547_+ 26179 + 11699 + 9659 + 7419 + 5379
21.48NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 9164
‘ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. °
Prepared | Checked
Annexure D : DL an
yexure D : DL and Ut Calculatulon AMAL Vi
For, Nooflanes 3
3 Lanesof Class A ay
119.44 T
‘combination with class 70R + Class A
oo
3056 T 4 T
[For Cass 70R + Class A)NAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 9164
‘ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. °
Prepared | Checked
‘Annexure D: DL and Ut Calculatulon Tana TT
Transverse moment for Piya C85@
f
Senkee 7 :
wee 0m
mndverie | 05 m fL—il L L}
133 ’
‘Transverse Moment = Load x Eccentricity
(Due to frst 3886T x 30
vehicle) 11659 Tm [Transverse Moment
Transverse Moment = Load x Eccentricity > 11659 - 1943 - 11659
(uctoSecond - 3886T x 05 Js 1943 tm
vehicle) 19.43 Tm
Transverse Moment = Load x Eccentricity
(Due to Third 3886T x 30
vehicle) “11659 Tm
‘Glass TOR vehicle + Class A
JOR stele
Class A 2nd vehicle
33
Transverse Moment = Load x Eccentricity
(Ove to Third 80577 x 1705, [Transverse Moment
vehicle) = 13738 Tm
= 13738-15935,
Transverse Moment = Load x Eccentricity = 2197 tim
(Ouetoforth = 3886T x aa
vehicle) = 15935 TimNAME OF WORK:CONSTRUCTION OF BRIDGE PROJECT NO. 64
(ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16 REVISION NO. °
Annexure D : DL and Lt Caleviatulon Prepered | checked
KAMAL ws
3) MT pax Ca8e
‘A) Class 70R W
a9per
n ]
oer |
— - |
15]
‘Transverse Moment
Load x Eccentricity
89.26T x 1.705
= 15219 Tim
a P HL aT ML MT
kN, kN. KN. EN. KN.
Prax 7493.3 0.0 0.9 29.8 527.8 |
[ML max 1271.2 0.0 0.0) 1207.6 198.7
[MT max 1046.2 0.0 0.0 392.3 23588NAME OF WORK:CONSTRUCTION OF BRIDGE
PROJECT NO, 164
ON VATRAK RIVER AT KHEDA VILLAGE ON
KHEDA-DHOLKA SH-16
REVISION NO, °
Prepared | Checked
Annexure D : DL and LL Calculatul
meen KAMAL WS
Footpath live load
bridge is having a length of
21.48 m_ 50 It comes in range of 7.5 m to 30m.
(According to clause 206.3.b )
P= Pe. _(40L-300
9
= so - | 40 21.48 300
9
= 500 = 62.1333
= 437.87 kg/m?
P= 4.38 KN/m*
Area of Footpath width x Length
1s x 2338
35.07 mt
Total load of Footpath
35.07 x 4.378667
= 153.5598 kN
P HU aT ML MT
kN. KN kN kN. kN.
153.6 0.0 0.0 0.0 8359)