You are on page 1of 1

time of arrival: 9:30 A.M.

Malolos Branch:
-verify specs of cctv
-needs sun shade for atm machine
-adjust/relocate flag type signage
-design plan for 2nd floor w/ stockroom
Site 1
time of arrival: 12:15 P.M.
San Jose Del Monte Bulacan:
-property still under construction
-700 meters from City Hall, Fire Dept. & Police Station
-w/ power line by meralco by the road side
-w/ water line by local government
-w/ application for telephone line private pole for pldt & globe
-strong cellular service
-w/ cctv camera at the perimeter
-w/ provision for plumbing & drainage
-no provision for fire sprinkler
-bldg. has unitized panel for power & telephone
-w/ centralized monitoring system of cctv
time of departure: 12:50 P.M.
Site 2
time of arrival: 2:15 P.M.
-property ready for occupancy
-7 kilometers from City Hall & Fire Dept.
-500 meters from SM San Jose Sel Monte Bulacan
-walking distance to nearest Police Station
-w/ operational power & lights
-w/ operational water line
-w/ telephone lines by pldt
-w/ cctv camera outside the property
time of departure: 2:35 P.M.
Site 3
time of arrival: 2:45
-property ready for occupancy
-7 kilometers from City Hall & Fire Dept.
-w/ operational power & lights
-w/ operational water line
-w/ telephone lines by pldt
-w/ cctv camera outside the property
time of departure: 3:15 P.M.

You might also like