Professional Documents
Culture Documents
Sunway Construction Is Founded Upon The Passion To Deliver Our Clients
Sunway Construction Is Founded Upon The Passion To Deliver Our Clients
It has grown
to become one of the largest companies in construction and related services in Malaysia
which located at Level 18, HOHUP Tower, No.1, Jalan Persiaran Jalil 1, Bandar Bukit Jalil,
57000 Kuala Lumpur and the company size was 11-50 workers. As a market leader in
capabilities in building, civil engineering, specialized intelligent building, trading and related
services. Ho Hup Construction Company also known as the company with a very
comprehensive fleet of light and heavy modern construction equipment. With strong roots in
its local markets and through its network of subsidiaries, Ho Hup Construction Company
Berhad also plays a significant role in the world market fir major engineering structures, civil
Mauritius, China, South Africa, Thailand and Indonesia. Locally, Ho Hup Construction
Company has completed numerous projects from both the private and government sectors for
high-rise intelligent buildings, stadium, airports, highway & bridges, railways & light rapid
transit, off shore marine works, oil & gas works, commercial building development, deep
foundation works and many more. Ho Hup Construction Company is known as the company
with vast involvement in national projects namely the Petronas Twin Towers, National Sports
Complex, Kuala Lumpur International Airport (KLIA), Light Rail Transit System (LRT),
Malaysia-Singapore second crossing and major highways. “Our Projects” page highlights the
details of work executed at the projects of which have contributed in shaping history. The
company underwent a major transformation in 2009 and to date, the Group’s spectrum of
activities now consists of three main division namely; property development, construction &
years of experience and an abundance o f resources including over 300 professional, technical
and operational staffs which located at Penthouse, The Crest, 3 Two Square, No 2, Jalan 19/1,
46300 Petaling Jaya, Selangor Darul Ehsan. Crest Builder Holding Berhad was incorporated
in Malaysia under the Companies Act 1965 on 9 March 2002 as a public limited company.
The CBHB was `founded in 1983 by the late Mr. Yong Soon Chow. What stated out as a
small timer of less the 10 staffs have grown to a strong corporation of over 300 staffs under
its stable. The CBHB has carved a strong foothold in the local construction industry. With in-
depth industry experience, the CBHB Group has a proven and established track record in the
sector, especially in the commercial, residential and institutional building construction. The
Group counts top branded developers and international property players amongst its clientele.
With a good blend of experience and vibrant proteges in its management team, the CBHB
Group has moved along the supply chain and diversified beyond purely construction into
Engineering (“M&E’) services and project management and upon completion of our RM300
million maiden development namely 3 Two Square, the Group has also diversified into
property management as well as car park management. The Group has also completed
various developments, including the UNITAR Campus at Tierra Crest, and a series of
residential and commercial projects, i.e. Alam Idaman, Avenue Crest and Alam Sanjung in
Shah Alam. The Group also manages a concession of the 5,000-student capacity UiTM
Tapah campus which ends in 2034. Together with the conventional developments, the Group
has also secured the privatisation and the redevelopment of Dang Wangi LRT station, Kelana
Jaya LRT station as well as a Malaysia Rubber Board land along Jalan Ampang, Kuala
Lumpur. With the vision to be the ‘Preferred’ organisation of choice by the partners and
customers, the Group aspires to achieve distinction in the industry through prudent cost
Financial Highlights
Financial Year 2015 2016 2017 2018 2019
Ended RM RM RM RM RM
Revenue 280,012,374 282,197,256 498,294,41 595,407,467 465,560,144
8
Profit Before Tax 27,079,665 25,915,203 44,600,659 98,281,065 22,217,379
Profit for the 11,998,183 14,968,214 30,380,456 72,180,738 16,874,670
Financial Year
Profit attributable 9,686,023 13,212,158 28,057,245 70,335,634 19,206,979
to Owners of the
Company
Total Equity 398,856,660 403,211,580 424,441,16 487,266,134 492,439,352
attributable to 3
Owners of the
Company
Net Assets per 2.25 2.28 2.40 2.87 3.02
Share (RM)
Total Number of 176,921,657 176,921,657 176,921,65 169,909,457 162,880,557
Share 7
Basic Earnings 5.74 7.73 16.44 41.21 11.55
per Share (sen)
Diluted Earnings 5.74 7.73 16.44 41.21 11.55
per share (sen)
Gross Dividend 4.00* 4.00* 4.00* 4.50* 3.50*
(sen)
.
1.0 Leverage Ratio of Ho Hup Construction Company Berhad (2015)
i. Equity Ratios
= 238,510,000 x 100%
523,153,000
= 45.6%
= 119,500,000
523,153,000
= 22.8%
= Total Liability*
Total Share Holder Equity
= 284,643,000
238,510,000
= 1.19
= Total Debts*
Total Share Holder Equity
= 119,500,000
238,510,000
= 0.50x
Leverage Ratio of Ho Hup Construction Company Berhad (2016)
v. Equity Ratios
= 311,769,000 x 100%
683,179,000
= 45.6%
= 197,600,000
683,179,000
= 28.9%
= Total Liability*
Total Share Holder Equity
= 371,410,000
311,769,000
= 1.19
= Total Debts*
Total Share Holder Equity
= 197,600,000
311,769,000
= 0.63x
Leverage Ratio of Ho Hup Construction Company Berhad (2017)
i. Equity Ratios
= 349,483,000 x 100%
895,691,000
= 39%
= 282,900,000 x 100%
895,691,000
= 31.6%
= Total Liability*
Total Share Holder Equity
= 546,208,000
349,483,000
= 1.56
= Total Debts*
Total Share Holder Equity
= 282,900,000
349,483,000
= 0.81x
Leverage Ratio of Ho Hup Construction Company Berhad (2018)
i. Equity Ratios
= 377,257,000 x 100%
1,087,972,000
= 34.7%
= 362,700,000 x 100%
1,087,972,000
= 33.3%
= Total Liability*
Total Share Holder Equity
= 710,715,000
377,257,000
= 1.88
= Total Debts*
Total Share Holder Equity
= 362,700,000
377,257,000
= 0.96x
Leverage Ratio of Ho Hup Construction Company Berhad (2019)
i. Equity Ratios
= 446,205,000 x 100%
1,305,500,000
= 34.2%
= 304,400,000 x 100%
1,305,500,000
= 23.3%
= Total Liability*
Total Share Holder Equity
= 859,295,000
446,205,000
= 1.92
= Total Debts*
Total Share Holder Equity
= 304,400,000
446,205,000
= 0.68x