Professional Documents
Culture Documents
3. Give the temperature of tempering after quenching to get values of a) HRC 40, b) HRC 57 for a eutectoide Steel.
Figure 3.
a. ____500°C ___
b. __200°C _____
Figure 3. TTT diagram for eutectoide steel
4. Match correctly concepts and definitions.
a) Martensite __b__ Heat treatment used to eliminate part or all of the effects of cold working.
b) Annealing __c__ Deformation of a metal below the recrystallization temperature.
c) Cold working __e__ A two-phase lamellar microconstituent, containing ferrite and cementite.
d) Tempering __d__ A heat treatment used to reduce the hardness of martensite.
e) Pearlite __h__ Interstitial solid solution of carbon in FCC iron.
f) Ferrite __g__ Metastable intermetallic compound of Fe and C.
g) Cementite __f__ Insterstitial solid solution of carbon in BCC iron.
h) Austenite __a__ Phase that forms as a result of quenching to temperaturas below 120 °C.