Professional Documents
Culture Documents
1.75
-2.85
gudang
-2.83 MATA AIR
3,00
7,25
ARCHITECT & BUILDER
r.filter & PERHATIAN: SEGALA BENTUK USAHA MEMPERBANYAK,
pompa FOTO COPY, MENGEDARKAN DOKUMEN INI
-2.83 HARUS SEIZIN DARI DIREKSI PT. MATA AIR PERSADA
9 10 CATATAN
Note
-2.85
5,00
0,60
-1.95
PARKIR
MOBIL
-3.00
r. gym TAMAN 6 5
-3.70 8 7
-2.83
5,00
-2.85
-2.85
5,00
-3.40
PARKIR
MOBIL
-3.50 rg tidur
2,00
-2.83
km LIFT
-2.90
HALL
3,00
3,00
km -2.85
-3.38
-3.41 -2.85
-2.55
R. ME
1,50
2
3 REVISI GAMBAR :
7,08
4
r. tidur
5 security Revision
6 -3.00
-2.50
R. TIDUR R. TIDUR -3.27
AJUDAN AJUDAN r. duduk -3.02
-3.25
2,50
2,18
JAKARTA SELATAN
JUDUL GAMBAR :
Drawing Title
-2.00 DENAH
1:150
8.00
-1.50 DIRANCANG :
Design By
MEL
DIGAMBAR :
Drawn By
MEL
N DIPERIKSA :
Checked By
----
DISETUJUI :
Approved By
1.35 4.50 3.00 2.00 3.00 6.00 1.25 2.25 5.00 1.65 ----
TANGGAL SELESAI :
Denah Basement Finished on
01
Agustus 14, 2020
A01-02 Skala 1:150
NO LEMBAR :
Drawing No
RAGUNAN_DENAH 200814
PT MATA AIR PERSADA
1.90 11.00 3.00 4.00 3.75 3.00 1.25 2.00 3.00 1.25 2.00
TAMAN KM KM
1.75
1.75
-0.40 -0.55 -0.60 +2.05 +2.00
-0.25 -0.05
MATA AIR
2.50
3.00
R. TIDUR R. TIDUR
KOLAM ART-2 ART-4
R. DUDUK R. DUDUK R. LINEN ARCHITECT & BUILDER
4.80
RENANG -0.48 +2.12
+0.00 ART +2.10
-0.50 PERHATIAN: SEGALA BENTUK USAHA MEMPERBANYAK,
FOTO COPY, MENGEDARKAN DOKUMEN INI
R. TIDUR R. TIDUR
2.50
-0.15 HARUS SEIZIN DARI DIREKSI PT. MATA AIR PERSADA
ART-1 ART-3
-0.25 MUSHOLA -0.48 +2.12 CATATAN
WATERFALL +0.05 Note
5.00
-1.80
0.60
3.00
TERAS R.MAKAN
+0.15 ART
DAPUR +0.13
VOID +0.18
5.00
R. KELUARGA
+0.20 PANTRY
+0.20
R. TIDUR
5.00
TAMU -2 FOOD
+0.20 STORAGE DOG's
+0.20 +0.15
2.00
KM
LIFT +0.10
+0.15
3.00
up
3.00
TAMAN R. DUDUK
+0.00 +1.04 +0.10
-0.20 +0.20
17
16
15
KM
5.25
14 R. TIDUR
13 +1.01 TAMU -1
3.00
KM up 12
+1.06 REVISI GAMBAR :
R.TAMU 11
-0.05 FOYER 10 Revision
+0.00
+0.00 9
R.KERJA 8
+0.00 POWDER
ROOM
0.75
-0.05 FORMAL DINING
2.50
NAMA PROYEK :
+0.10 Project Name
TERAS TERAS
-0.05 TERAS
-0.05
+1.01 RAGUNAN
3.25
-
DENAH
up
10.12
-2.00 genset
-0.90
-1.80
1:150
8.00
r. tunggu DIRANCANG :
-1.85 Design By
MEL
DIGAMBAR :
Drawn By
security MEL
-1.80
N DIPERIKSA :
Checked By
----
DISETUJUI :
Approved By
----
-2.20
TANGGAL SELESAI :
(cek eksisting)
Denah Lantai 1 Finished on
02
1,35 4,50 3,00 2,00 3,00 6,00 1,25 2,25 5,00 1,65 Agustus 14, 2020
A01-02 Skala 1:150
NO LEMBAR :
Drawing No
RAGUNAN_DENAH 200814
1.20 4.65 1.85 6.00 4.00 2.00 6.00 1.75 2.25 PT MATA AIR PERSADA
TAMAN
1.85
+4.55
(+4.10)
MATA AIR
2.50
R. TIDUR UTAMA
+4.70 PRIVAT ARCHITECT & BUILDER
BALKON
ROOM +4.65
+4.65
+4.70 PERHATIAN: SEGALA BENTUK USAHA MEMPERBANYAK,
+3.00
FOTO COPY, MENGEDARKAN DOKUMEN INI
2.50
HARUS SEIZIN DARI DIREKSI PT. MATA AIR PERSADA
CATATAN
Note
0.60
3.00
WIC
BALKON +4.70
+4.65
+0.90
FOYER
5.00
VOID +4.70
R. KERJA
+4.70
4.00
KM UTAMA
R.TIDUR R. BELAJAR +4.65
ANAK-4 +4.70 WIC
VOID +4.70
+4.70
2.00
KM
1.00
LIFT
+4.65 +4.65
3.00
3.00
up
+4.70 BALKON VOID
+4.65
R. DUDUK
1.50
+4.70
+4.70 R.TIDUR
R.TIDUR ANAK-1
R.TIDUR ANAK-2 +5.45
ANAK-3
4.75
+4.70 KM
+4.70 +5.40
3.00
KM
+3.00
1.25
tanaman
+5.20 NAMA PROYEK :
Project Name
1.00
VOID dak
+3.70 RAGUNAN
-
JAKARTA SELATAN
JUDUL GAMBAR :
Drawing Title
DENAH
1:150
DIRANCANG :
Design By
MEL
DIGAMBAR :
Drawn By
MEL
N DIPERIKSA :
Checked By
----
DISETUJUI :
Approved By
1.35 4.50 2.00 3.00 3.00 4.00 2.00 1.25 2.25 5.00 1.50 ----
TANGGAL SELESAI :
Denah Lantai 2 Finished on
03
Agustus 14, 2020
A01-02 Skala 1:150
NO LEMBAR :
Drawing No
RAGUNAN_DENAH 200814
PT MATA AIR PERSADA
MATA AIR
ARCHITECT & BUILDER
PERHATIAN: SEGALA BENTUK USAHA MEMPERBANYAK,
FOTO COPY, MENGEDARKAN DOKUMEN INI
4.65 2.00 10.00 HARUS SEIZIN DARI DIREKSI PT. MATA AIR PERSADA
CATATAN
Note
5,08
3.00
bbq ROOFGARDEN
+8.80 +8.80
(+8.30)
TERAS
2.00
LIFT +8.95
3.00
KM
+8.95
3.00
+9.00
4.00
dn
R.TIDUR
ANAK-5
STUDIO +9.00
MUSIK
4.00
+9.00
REVISI GAMBAR :
Revision
NAMA PROYEK :
Project Name
RAGUNAN
-
JAKARTA SELATAN
5.00 5.00 4.50 2.50 JUDUL GAMBAR :
Drawing Title
DENAH
1:150
DIRANCANG :
Design By
MEL
DIGAMBAR :
Drawn By
MEL
N DIPERIKSA :
Checked By
----
DISETUJUI :
Approved By
----
TANGGAL SELESAI :
Denah Lantai Attic Finished on
04
Agustus 14, 2020
A01-02 Skala 1:150
NO LEMBAR :
Drawing No
RAGUNAN_DENAH 200814
PT MATA AIR PERSADA
1.90 11.00 3.00 4.00 3.75 3.00 1.25 2.00
TAMAN
1.75
+4.60
(+4.10)
MATA AIR
3.00
ARCHITECT & BUILDER
4.80
+4.65
PERHATIAN: SEGALA BENTUK USAHA MEMPERBANYAK,
FOTO COPY, MENGEDARKAN DOKUMEN INI
HARUS SEIZIN DARI DIREKSI PT. MATA AIR PERSADA
CATATAN
Note
5.00
0.60
tangki
BALKON air
+4.65
DAK
DAK +8.00
+8.30
5.00
(outdoor
ROOFGARDEN ac)
+8.80 solar
panel
5.00
(+8.30)
2.00
+7.50
3.00
3.00
+8.80
1.50
+8.00
5.25
3.00
REVISI GAMBAR :
Revision
+8.00
0.75
2.50
NAMA PROYEK :
Project Name
RAGUNAN
3.25
-
JAKARTA SELATAN
JUDUL GAMBAR :
Drawing Title
DENAH
10.12
1:150
8.00
DIRANCANG :
Design By
MEL
DIGAMBAR :
Drawn By
MEL
N DIPERIKSA :
Checked By
----
DISETUJUI :
Approved By
----
-2.20 TANGGAL SELESAI :
Denah Lantai Atap Finished on
05
1.35 4.50 3.00 2.00 3.00 6.00 1.25 2.25 5.00 1.65 Agustus 14, 2020
A01-02 Skala 1:150
NO LEMBAR :
Drawing No
RAGUNAN_DENAH 200814