HYUNDAI ENG. & CONST. CO.,LTD.
‘Cirabon Z, T21000MW Goal Fired Power Plant Project
FUSING PROCEDURE SPECIFICATIOIN (FPS) (ASME Section IX: 2017)
Page Tot
Organization Name: _Hyundsi Eng. & Const. Co, Lt by Ms.voon
Fusing Procedure Spciicaton No ‘ASSFPS-BTOO1 Rev. No? Daw cage
FPS Qualification Coy Texing Elstar Fs a
Fusing Process Type Thermal eating Type
set Type bow
Poe En Peprabon seme
er ee Age =
‘Sache, procter care, wa SYMOOE, Or ATEN SECTION
‘Seu sow ie genera arangarert of Be parse wed Were
pica, the aks of he ort poor may be pects
Stee maybe acto atte eg he rate oe
fimo aro)
Spectator 190.4477 org Cimntcaion __—PEAGO _loSpecticaton _ WOMAZTr Eg Clontnten __PELIO0
Pps Sie Oaneti)—Umumted Pipe Wl Therese Unlimited Coos Setar Aes
(tes atrial: 1) pie: ASTHIGROS8 P2708, PE2008_2) iting: ASTI DSO PEZTEG, E008 PEATIO
|Pesteon caren
pe Posten | so orion
omer "The uo pes Bred We Periz postion # a
onan (SFO)
eater Sutace Temocrtue Rarge
aig tcl Pes Rarge
rag Pressure Range oa) Taare
Met Beas Sze Range Pagure GRD ws baw Table OF 2
Master Heater late
ie Wall Thane, nfm) __Remwval Tames
—___ att osteatons
areonewe 2
> 626 055 (91010) 20
2055 w 128614030) 3
> 118 256 201060) 20
225045 (ret ee tt) 28
245 p10 30
28 sac pr rm of Wal Ticket
f=]
ot Down Tne at Bt Fung Preece Range
[Ean (oF
Fug Mache Marat ‘Sern Welding or thar
Ostarogitonted = ve“ e ‘ata Feaimton Mecine Werfoche™
yeu Benson Hove Lena me
[reine O07
tecoten ( ebrieaton shop
‘Visual Exar (OF, igre F483)
(0) Ther sit ro enoce of eke or neorpite ng
(Joe sha en rope fed bad orton
(Variations pet tend neigtis on oposte ss fe cenvage art aru cufeene of aed jes re scene
(@ The apes cline deavage between the uel beas of re uct sal remain stove re bse merlot
(Fused ssa rat pay ve aru meager, ae ase are mismatch seb es than 10% ibe rin wa
Somme [RSvOON Po [BNieong oP l
ee Caw aie
——. if tana ‘ete ‘hea