Equipment has not been repaired / Remanufacture / Repair to
remanufactured by the OEM only. Lower RSL2 or lower level.
Equipment does not have the required Remanufacture / Repair to
traceability for the OEM. Lower RSL‐2 or lower level.
Equipment traceability:
Full data book of the equipment showing :
1) Equipment Type/Description/Rating
2) Original Equipment Manufacturer Name
3) Original Date of Manufacturing Design status:
4) Original Design Verification report number 1) The equipment design established is no
5) Original OEM Job order / Purchase Order longer suitable for repair and remanufacturing OEM declares equipment design as Equipment cannot be
Valid API Quality Management System: number by the OEM as a result of design changes, such no longer suitable for repair and repaired / remanufactured.
1) Selected OEM repair shop has a valid and 6) Original OEM Equipment Markings as designs for materials, processes, physical remanufacturing
active API‐Q1 certificate and API yearly audit 7)OEM Part Number features or application.
findings affecting the remanufacturing process 8)OEM Part Serial Number(s)
API equipment: Valid product license: have been addressed in a close out plan. 9)OEM Assembly Part Number
Equipment requiring remanufacturing has API Monogram: Selected OEM repair shop shall 10)OEM Assembly Serial Number
OEM check:
been build in accordance with the required API Equipment does have an API have a valid active API license and or 11) Maintenance history, including list of
Equipment has
t d db d d lid API lilicense
standard by a vendor under a valid API Monogram and API licensed
Monogram and API licensed i d d li i ( ) i h
required product listing(s) without replacement parts
replacement parts.
been repaired /
certificate and required product listing(s) facility with API‐Q1 or equivalent exclusions for manufacturing / 2) Selected OEM repair shop is working with an 12) Repair and Remanufacturing history.
remanufactured by
without exclusions for manufacturing / QMS and acess to Origional remanufacturing of the equipment. API approved Quality Management System that 13) Heat treatment history / records and welding
the OEM only.
remanufacturing of the equipment. Product Specification. meets the requirements of API‐Q1 and API history.
three yearly audit findings affecting the 14) Copy of used WPS and Welder Qualification
remanufacturing process have been have been records.
addressed in a close out plan. 15) Certificate Of Conformance when equipment Third Party Inspection:
Design status:
was new. The equipment owner can require third party
2) The equipment design established is
16) Subsequent Certificates of Conformance inspection in the repair / remanufacturing
suitable for repair and remanufacturing by the
issued after periodic inspections , repair and process. OEM prepares an Internal Test Plan in
OEM.
remanufacturing. consultation with the equipment owner.
17) Other equipment certificates issued by the
OEM.
18) List of standard under which the equipment
was manufactured.
19) Third Party Inspection reports.
Equipment repair / remanufacturing by the OEM.
Non OEM parts found at Remanufacture / Repair to
Non‐OEM parts are not replaced.
disassembly. RSL‐2 level or lower level
Data book update:
Non OEM parts replaced
p p with OEM parts.
p O M updates the equipment owners data book and
OEM updates the equipment owners data book the O M data book with:
and the OEM data book with:
Positive Material Identification: 1) Date of repair
There where required Positive 2) Certificate of Conformance in compliance with this standard. Equipment recertified and
Material Identification by Spark 3) Third Party Inspection reports lit t d k li d
quality trademark applied:
Equipment repair: Emission Spectrography shall be Equipment safety notices: Equipment reassembly: Equipment testing: 4) Other equipment certificates issued by the OEM Equipment is fully qualified and
Equipment fully disassembled and used to distil material OEM informs equipment owner when the Equipment assembled with new Equipment is function and 5) Design verification report number for new part number(s) and / or assembly number. meeting or exceeding all
all parts checked for compliance to composition. There where this equipment or parts of the equipment is OEM parts and / or with OEM pressure tested as required by 6) Copy of the new equipment markings as required under the API standard. original design and testing Remanufacture / Repair to
OEM specifications. does not match the material not compliant to the latest equipment remanufactured parts in the OEM meeting or exceeding 7) Update maintenance history. requirements as listed in the RSL‐4 level.
certificates material properties safety notification (s) as published by the compliance with the latest safety the original product 8) Update equipment manual for new part number(s) and / or assembly number. API standard and as such
shall be established through OEM. notification. specification. 9) Test report(s) documented in the OEM Design
destructive testing. 10) Component dimensional reports Verification Reports.
11) List of standard under which the equipment was repaired.
12) etc.
New replacement part delivered for assembly.
The remanufacturing of the part is technically or not
possible or economical not justified.
Equipment remanufacturing assessment:
1) Can equipment be remanufactured so that it meets or exceed the required specification Inspection after heat treatment: Equipment Machining:
Equipment remanufacturing: Equipment and / or
for the part and / or assembly. Equipment heat treatment: Equipment and / or parts are fully
Equipment remanufacturing: Equipment and / or parts are parts are machined in
2) The Welding Process Specification(s) and Procedure Qualification Record(s) required for Equipment and / or parts are inspected, visual , appropriate NDE
Equipment and / or parts welded, machined and accordance with the
the repair in combination with the heat treatment history and further required heat heat treated in accordance with method(s) and dimensional
identified for remanufacturing inspected visual and with product specification.
treatment (s) shall guarantee minimum requirements for the material microstructure and the WPS. inspection(s).
appropriate NDE method(s).
mechanical properties.
3) The remanufacturing of the part or assembly is economical justified.
Data book update:
OEM updates the equipment owners data book and the OEM data book with:
1) Date of repair / remanufacturing
2) Certificate of Conformance in compliance with this standard.
3) Third Party Inspection reports
4) Other equipment certificates issued by the OEM Equipment recertified and
5) Design verification report number for new part number(s) and / or assembly number. quality trademark applied:
Inspection after Machining: Equipment reassembly: Equipment testing: 6) Copy of the new equipment markings as required under the API standard.
Equipment final surface treatment and Equipment is fully qualified and
Equipment and / or parts are fully Equipment assembled with new Equipment is function and 7) Update maintenance history.
final dimensional Inspection: meeting or exceeding all
inspected, visual , appropriate NDE OEM parts and / or with OEM pressure tested as required by 8) Update equipment manual for new part number(s) and / or assembly number.
Equipment and / or parts do get their original design and testing Remanufacture / Repair to
method(s) and dimensional remanufactured parts in the OEM meeting or exceeding 9) Test report(s)
final surface treatment where applicable requirements as listed in the RSL‐4 level.
inspection(s). compliance with the latest safety the original product 10) Component dimensional reports
and final inspection. API standard and as such
notification. specification. 11) Weld inspection reports documented in the OEM Design
12) Weld maps Verification Reports.
13) NDE reports
14) Heat treatment history / records and welding history.
15) Copy of used WPS and Welder Qualification records.
16) List of standard under which the equipment was remanufactured
17) ect.