WORK PROGRAMME / METHOD STATEMENT ‘SCOPE OF WORKS. Design, Supply, instal tet, commision and setto work Sewage Teatment Pant, Efvent Treatment Plant and Reverse Osmosis plant, incorporating Membvane Bio Reactor Process [METHOD OF OPERATION LF On receipt of LOI from the employer, Aqua matrx shallatend the Kick of “Meeting as arranged by the Employer. KOM: From the date of KOM and the Engineer's Instrution, shall commence 23 MOBILIZATION : During this period, Aqua Matrix Project Engineer shall submit all Data sheets, Drawings, PAID, Fow Diagram, Project Schedule etc, to Project Engineer for Employer's approval, 2.4 APPROVALS: Approvals all Datasheets, Drawings, PID, Flow Diagram, Project Schedule etc, shallbe received from the Employer's Representative within 7 days of submission 25 IVILWORKS: Our Project / Design engineer shall vst ste at identified key stages to verify the cv mensions and elevations. 26 PROCUREMENT: Our Procurement team shall commence process of procuring ‘the equipment and fabrications. Proposed to complete the procurement by the time of completion of Ci Works. 2.7 TRANSPORT: The procured equipment shallbe transporte to site during he cil ‘onstruction works 28 ERECTION: The received equipment shal be parallel erected in coordination with the completed civil works 29 PIPING & CABLE LAYING: The Piping and cable laying works shall be cared out ater / along with the erection of equipment 210 ELECTRICALS: Al electrical works to be caried aut h Coordination with the ‘mechanical works 211 INTERCONNECTING: All equipment shall be nterconne-ted a2 23 2a 236 2a7 [PRE COMMISSIONING: Pre commissioning checks shall te made and recorded. Inspection of ll equipment shall be made fr leaks, cornections, levels, dais, workmanship ec. and corrected where required REMOVAL OF DEBRIS: excess materials and debris shall be removed from ste and shall be disposed of, ‘COMMISSIONING: The Plant shall be commissioned, and processing inated. Employer's representative shall arrange for inspection and issue of Completion Ccertieate. Necessary Tools and Recommenced spare (2 yeas) Ist shall be handed over to Employer's representative. (OPERATION & MAINTENANCE: The Pant shall be optimized and handed over for regular operation. TRAINING: On provision of operators and staff, Aqua Matrix shall tran them to ‘operate the plant HANDING OVER OF STP: The Plant shall be handed aver to the Employer / nominated contactor for regular operation & Maintenance. DOCUMENTS FOR APPROVAL (2) CIVIL WORKS - Drawings General ayout Tanke GA drawings, Pumps / Blower Foundations Equipment / MCC Room Walkways (b) PROCESS - Drawings 1, RID, 2. Hyéraulie flow diagram (HF), (c) ata sheets &tteratures 1 Pumps 2 Blowers 3. Dosing Pumps 4. MR membrane 5. Screen 6 Fiter press 7 nstuments 8 Panel A drawing with complete wing dtals 8. pic (6) LANwine~8ar/ Pert chart a 1. Project Schedule SOD PROJECT SITE ‘Soon aftr the KOM, the folowing shall be cari out during the Mobilization period. 1+ Relevant work permits will be obtained In advance for the work + Worksite investigation shal be carried out to famiarie with overall project Scope location of all existing above ground and underground services. + Any exstng. érawing / document identified as Keing appropriate to the contract shal be obtained from the Employer/ Engler. +The Project site area would be marked andnecessary approvals taken fromthe Employer's Project Engineer. ;ROCUREMENT (On recelving approvals for Materials & equipment for the consruction of STP including required spare parts, fing, fiture, and special tools as required shall be procured from approved vendors Progress on all the purchase orders shall be monitored through a erkical schedule which ‘denty those items of equipment and material are potential ericl to the schedule and require special attention to ensure timely deliver. ‘Appropriate remedial action shall be taken In concurrence with Employer Engineer fr items, which may ag behind schedule 5 ‘cL. Woks {Allcvil works shall be constructed in accardance wth specications and approved drawings. 6 ERECTION OF EQUIPMENT ‘All equipment including Tans, Fier, Blower, Pumps, Electrical Panel etc, shall be erected in accordance with specifations and approved drawings. 2 INTERCONNECTION OF EQUIPMENT Cn erection of all equipment the Tanks, Fier, Blower, Pumps, Electrical Panel et. shall be Interconnected in accordance with the process a speci forthe approved option. COMMISSIONING (on erection and interconnections of all equipment, the Tanks, Fer, Blower, Pumps, Electrical Panel tc, shall be checked as per the Pre Commissioning Procedures prepared on the recommendations ofthe manufacturers / vendor. (on completion of the Pre Commissioning Procedures’ the check ist shall be submitted to the Employer's Representative for their ecards. 9. ‘COMMISSIONING Prior to commissioning a commissioning procedure shall be prepared and got approval from the Employer's representative (On readiness and on an agreed time and date the STP shall be commissonedinthe presence ‘of Employers representative and checked for proper operation of allquipment and confirms ‘thatthe complete system meets requirements of design and operating philosophy. In ease of any corrections required during commissioning by the Employer's representative 2 punch Ist shall be made and mutually signed fr corrections within atime agreed upon. (On satisactory completion of commissioning, commissioning report shall be submitted to Engineer/ Employer for acceptance and issue of Completion Certificate. 20, ASBUILT DRAWINGS AND O&M MANUALS After commissioning athe carrected and final drawings and the Operation & Maintenance ‘Manual shall be submitted tothe Employer's Representative un. ION & MAINTENANCE (On atisactory commissioning ofthe STP, the plant shall be optimized with a regular flow of Intake an inating the activated sludge processes All the specified parameters of sewage water and treated water checked and reports froma reputed laboratory shall be submited for acceptance by the Employer ‘an operation and Maintenance Chart shall be prepared and visibly installed inthe {equipment room for enabling the operator to follow the schedules ef operations of the STP. ‘Ng book, as approved by the Employers representative shall be ritiated and maintained for ecording the operational parameters for records, 12, TOOLS SPARES All Spares and Tools forthe ST, List shall be handed over tothe Employer's representative for procurement and storage 13. TRAINING ‘The Employers personne! Identified for operation ofthe plant shallbe trained by Aqua tmatrix staff during the operation & Maintenance period. The detailsf trainings shall be ‘mutually agreed and as approved by the Employer's representative 44, PERSONNEL + All works shall be carted out TCEL «+ M/s, AQUANNATRIX SYSTEM wl cary ou the erection andcommisioning of the various plants + Project Management Team consisting ofthe personnel as indicated nthe Project, ‘Organization Chart. 15, PROJECT SITE WORKING HOURS The Project site working hours shall be 10 hours X6 days a week 16, SAFETY Safety at workplace Is ur prime concern. We have been working wh a good track recordof ‘maintaining safety at worksite ‘Aqua Matrix / approved Sub Contractors’ staff are acquainted with safety practices with adequate safety trainings 25 per workplace safety and heath acs. Aqua matie Polect Engineer and Site Enginer are responsible for the day-to-day safety tse 7, Basecame ‘Accommadation for the crew wil be provided in rented houses in the nearby town of work sie 18, COMMUNICATION ‘Mobile (GSI) wil be used at ste for communication between project ste & Aqua Matix

You might also like