WORK PROGRAMME / METHOD STATEMENT
‘SCOPE OF WORKS.
Design, Supply, instal tet, commision and setto work Sewage Teatment Pant, Efvent
Treatment Plant and Reverse Osmosis plant, incorporating Membvane Bio Reactor Process
[METHOD OF OPERATION
LF On receipt of LOI from the employer, Aqua matrx shallatend the Kick of
“Meeting as arranged by the Employer.
KOM: From the date of KOM and the Engineer's Instrution, shall commence
23 MOBILIZATION : During this period, Aqua Matrix Project Engineer shall submit all
Data sheets, Drawings, PAID, Fow Diagram, Project Schedule etc, to Project
Engineer for Employer's approval,
2.4 APPROVALS: Approvals all Datasheets, Drawings, PID, Flow Diagram, Project
Schedule etc, shallbe received from the Employer's Representative within 7 days
of submission
25 IVILWORKS: Our Project / Design engineer shall vst ste at identified key stages
to verify the cv mensions and elevations.
26 PROCUREMENT: Our Procurement team shall commence process of procuring
‘the equipment and fabrications. Proposed to complete the procurement by the
time of completion of Ci Works.
2.7 TRANSPORT: The procured equipment shallbe transporte to site during he cil
‘onstruction works
28 ERECTION: The received equipment shal be parallel erected in coordination with
the completed civil works
29 PIPING & CABLE LAYING: The Piping and cable laying works shall be cared out
ater / along with the erection of equipment
210 ELECTRICALS: Al electrical works to be caried aut h Coordination with the
‘mechanical works
211 INTERCONNECTING: All equipment shall be nterconne-teda2
23
2a
236
2a7
[PRE COMMISSIONING: Pre commissioning checks shall te made and recorded.
Inspection of ll equipment shall be made fr leaks, cornections, levels, dais,
workmanship ec. and corrected where required
REMOVAL OF DEBRIS: excess materials and debris shall be removed from ste
and shall be disposed of,
‘COMMISSIONING: The Plant shall be commissioned, and processing inated.
Employer's representative shall arrange for inspection and issue of Completion
Ccertieate.
Necessary Tools and Recommenced spare (2 yeas) Ist
shall be handed over to Employer's representative.
(OPERATION & MAINTENANCE: The Pant shall be optimized and handed over for
regular operation.
TRAINING: On provision of operators and staff, Aqua Matrix shall tran them to
‘operate the plant
HANDING OVER OF STP: The Plant shall be handed aver to the Employer /
nominated contactor for regular operation & Maintenance.
DOCUMENTS FOR APPROVAL
(2) CIVIL WORKS - Drawings
General ayout
Tanke GA drawings,
Pumps / Blower Foundations
Equipment / MCC Room
Walkways
(b) PROCESS - Drawings
1, RID,
2. Hyéraulie flow diagram (HF),
(c) ata sheets &tteratures
1 Pumps
2 Blowers
3. Dosing Pumps
4. MR membrane
5. Screen
6 Fiter press
7 nstuments
8 Panel A drawing with complete wing dtals
8. pic
(6) LANwine~8ar/ Pert chart a
1. Project Schedule SODPROJECT SITE
‘Soon aftr the KOM, the folowing shall be cari out during the Mobilization period.
1+ Relevant work permits will be obtained In advance for the work
+ Worksite investigation shal be carried out to famiarie with overall project
Scope location of all existing above ground and underground services.
+ Any exstng. érawing / document identified as Keing appropriate to the
contract shal be obtained from the Employer/ Engler.
+The Project site area would be marked andnecessary approvals taken fromthe
Employer's Project Engineer.
;ROCUREMENT
(On recelving approvals for Materials & equipment for the consruction of STP including
required spare parts, fing, fiture, and special tools as required shall be procured from
approved vendors
Progress on all the purchase orders shall be monitored through a erkical schedule which
‘denty those items of equipment and material are potential ericl to the schedule and
require special attention to ensure timely deliver.
‘Appropriate remedial action shall be taken In concurrence with Employer Engineer fr items,
which may ag behind schedule
5 ‘cL. Woks
{Allcvil works shall be constructed in accardance wth specications and approved drawings.
6 ERECTION OF EQUIPMENT
‘All equipment including Tans, Fier, Blower, Pumps, Electrical Panel etc, shall be erected
in accordance with specifations and approved drawings.
2 INTERCONNECTION OF EQUIPMENT
Cn erection of all equipment the Tanks, Fier, Blower, Pumps, Electrical Panel et. shall be
Interconnected in accordance with the process a speci forthe approved option.
COMMISSIONING
(on erection and interconnections of all equipment, the Tanks, Fer, Blower, Pumps,
Electrical Panel tc, shall be checked as per the Pre Commissioning Procedures prepared on
the recommendations ofthe manufacturers / vendor.(on completion of the Pre Commissioning Procedures’ the check ist shall be submitted to
the Employer's Representative for their ecards.
9. ‘COMMISSIONING
Prior to commissioning a commissioning procedure shall be prepared and got approval from
the Employer's representative
(On readiness and on an agreed time and date the STP shall be commissonedinthe presence
‘of Employers representative and checked for proper operation of allquipment and confirms
‘thatthe complete system meets requirements of design and operating philosophy.
In ease of any corrections required during commissioning by the Employer's representative
2 punch Ist shall be made and mutually signed fr corrections within atime agreed upon.
(On satisactory completion of commissioning, commissioning report shall be submitted to
Engineer/ Employer for acceptance and issue of Completion Certificate.
20, ASBUILT DRAWINGS AND O&M MANUALS
After commissioning athe carrected and final drawings and the Operation & Maintenance
‘Manual shall be submitted tothe Employer's Representative
un. ION & MAINTENANCE
(On atisactory commissioning ofthe STP, the plant shall be optimized with a regular flow of
Intake an inating the activated sludge processes
All the specified parameters of sewage water and treated water checked and reports froma
reputed laboratory shall be submited for acceptance by the Employer
‘an operation and Maintenance Chart shall be prepared and visibly installed inthe
{equipment room for enabling the operator to follow the schedules ef operations of the STP.
‘Ng book, as approved by the Employers representative shall be ritiated and maintained
for ecording the operational parameters for records,
12, TOOLS SPARES
All Spares and Tools forthe ST, List shall be handed over tothe Employer's representative
for procurement and storage
13. TRAINING
‘The Employers personne! Identified for operation ofthe plant shallbe trained by Aqua
tmatrix staff during the operation & Maintenance period. The detailsf trainings shall be
‘mutually agreed and as approved by the Employer's representative44, PERSONNEL
+ All works shall be carted out TCEL
«+ M/s, AQUANNATRIX SYSTEM wl cary ou the erection andcommisioning of the
various plants
+ Project Management Team consisting ofthe personnel as indicated nthe Project,
‘Organization Chart.
15, PROJECT SITE WORKING HOURS
The Project site working hours shall be 10 hours X6 days a week
16, SAFETY
Safety at workplace Is ur prime concern. We have been working wh a good track recordof
‘maintaining safety at worksite
‘Aqua Matrix / approved Sub Contractors’ staff are acquainted with safety practices with
adequate safety trainings 25 per workplace safety and heath acs. Aqua matie Polect
Engineer and Site Enginer are responsible for the day-to-day safety tse
7, Basecame
‘Accommadation for the crew wil be provided in rented houses in the nearby town of work
sie
18, COMMUNICATION
‘Mobile (GSI) wil be used at ste for communication between project ste & Aqua Matix