You are on page 1of 3

PROJECT(NO.

) NAME: (D20-000) Apex International (Thailand)


SUBJECT: Cooling Load Summary
Date: 2020-09-13

VRF System
ITEM AREA SERVED AREA 10:00 AM 12:00 PM 4:00 PM 8:00 PM PK GTH SQ.M
SQ.M MBh MBh MBh MBh TONS /TON
Ground Floor
1.1 Lobby, Hall, & Corridor 416.0 210.7 184.8 224.0 167.0 18.7 22.3
1.2 Quality Assuurance & Instrument 88.3 57.3 39.8 42.1 34.2 4.8 18.5
1.3 Factory Service 80.6 55.7 42.5 46.9 41.3 4.6 17.4
1.4 Supervisor 1 28.8 14.7 15.1 16.4 13.9 1.4 21.1
1.5 Supervisor 2 29.2 14.0 14.7 18.1 16.9 1.5 19.3
1.6 Office Area 199.6 88.0 91.5 161.6 81.7 13.5 14.8
1.7 Data Rm. 26.6 11.9 12.4 14.1 14.6 1.2 21.9
1.8 Copy M/C Rm. 10.2 7.3 7.4 7.5 7.3 0.6 16.4
1.9 Computer Rm. 10.2 17.5 17.6 17.7 17.5 1.5 6.9
1.10 Men Toilet 21.8 6.9 7.3 9.9 8.9 0.8 26.3
1.11 Women Toilet 21.8 6.9 7.3 9.9 8.9 0.8 26.3
1.12 Meeting Rm. 1 25.5 22.4 22.8 25.3 21.0 2.1 12.1
1.13 Meeting Rm. 2 59.0 46.6 34.0 35.8 30.3 3.9 15.2
1.14 Staff Training 189.0 140.8 126.2 128.9 117.5 11.7 16.1
1.15 Canteen 244.0 199.1 205.9 270.8 196.4 22.6 10.8
1.16 Kitchen 49.3 50.7 53.2 59.2 55.2 4.9 10.0
1.17 Store 14.6 8.6 8.9 9.9 9.7 0.8 17.8
Total of GF 1,514.5 959.0 891.3 1,098.1 842.3 95.4 15.9
2nd Floor
2.1 Hall & Corridor 390.0 288.3 279.0 323.5 192.9 27.0 14.5
2.2 Lounge 40.3 24.4 28.3 31.4 24.5 2.6 15.4
2.3 Showroom 155.0 140.1 128.4 144.4 101.5 12.0 12.9
2.11 Accounting Rm. 59.2 37.3 42.8 46.9 37.5 3.9 15.1
2.12 Women Toilet 21.8 9.1 11.3 15.2 11.2 1.3 17.2
2.13 Meeting Rm. 1 21.8 9.1 11.3 15.2 11.2 1.3 17.2
2.14 Living Rm. 93.3 73.7 77.2 82.7 66.1 6.9 13.5

X - 01 C-Load Calc - Sum Page 1 of 3 AUG 13, 1999]


PROJECT(NO.) NAME: (D20-000) Apex International (Thailand)
SUBJECT: Cooling Load Summary
Date: 2020-09-13

VRF System
ITEM AREA SERVED AREA 10:00 AM 12:00 PM 4:00 PM 8:00 PM PK GTH SQ.M
SQ.M MBh MBh MBh MBh TONS /TON
2.15 Dining Rm. 92.7 87.9 79.6 87.6 67.4 7.3 12.7
2.16 Pantry 8.8 10.1 10.9 11.6 10.1 1.0 9.1
2.17 Kitchen 39.0 41.4 39.8 42.4 34.6 3.5 11.0
2.26 Laundry Rm, 16.8 18.8 21.5 24.4 17.4 2.0 8.3
2.27 Storage 24.3 20.1 23.3 28.1 22.9 2.3 10.4
Total of 2F 963.0 38.8 44.8 52.4 40.3 71.1 13.5
GRAND TOTAL 2,477.5 1,004 944 1,138 913 166.6 14.9

X - 01 C-Load Calc - Sum Page 2 of 3 AUG 13, 1999]


PROJECT(NO.) NAME: (D20-000) Apex International (Thailand)
SUBJECT: Cooling Load Summary
Date: 2020-09-13

VRF System
ITEM AREA SERVED AREA 10:00 AM 12:00 PM 4:00 PM 8:00 PM PK GTH SQ.M
SQ.M MBh MBh MBh MBh TONS /TON
Split System
ITEM AREA SERVED AREA 10:00 AM 12:00 PM 4:00 PM 8:00 PM PK GTH SQ.M
SQ.M MBh MBh MBh MBh TONS /TON
2.4 Chairman 59.7 43.5 48.7 55.8 38.7 4.6 12.8
2.5 Chairman - Bedroom 26.8 20.3 23.0 28.4 21.2 2.4 11.3
2.6 General Manager 41.1 26.4 30.2 33.1 26.5 2.8 14.9
2.7 General Manager - Bedroom 25.5 17.8 20.5 33.0 17.9 2.7 9.3
2.8 President 41.2 26.5 30.3 33.2 26.6 2.8 14.9
2.9 President - Living Rm. 32.2 21.0 24.3 28.8 25.2 2.4 13.4
2.10 President - Bedroom 25.2 17.8 20.4 33.4 18.0 2.8 9.0
2.18 Room 1 - Living Rm. 35.5 25.1 28.4 30.9 25.2 2.6 13.8
2.19 Room 1 - Bedroom 18.5 10.8 12.8 28.5 9.5 2.4 7.8
2.20 Room 2 - Living Rm. (Use O/P of Rm 1.) 35.5 25.1 28.4 30.9 25.2 2.6 13.8
2.21 Room 2 - Bedroom (Use O/P of Rm 1.) 18.5 10.8 12.8 28.5 9.5 2.4 7.8
2.22 Room 3 - Living Rm. (Use O/P of Rm 1.) 35.5 25.1 28.4 30.9 25.2 2.6 13.8
2.23 Room 3 - Bedroom (Use O/P of Rm 1.) 18.5 10.8 12.8 28.5 9.5 2.4 7.8
2.24 Room 4 - Living Rm. (Use O/P of Rm 1.) 35.5 25.1 28.4 30.9 25.2 2.6 13.8
2.25 Room 4 - Bedroom (Use O/P of Rm 1.) 18.5 10.8 12.8 28.5 9.5 2.4 7.8
Total of 2F 467.7 317.3 362.5 483.4 313.0 40.3 11.6

X - 01 C-Load Calc - Sum Page 3 of 3 AUG 13, 1999]

You might also like