PROJ 022/EPCC/INKA

PT. INKA (PERSERO) REV 0


NO. /2018
PT. ADHI KARYA
(Persero) Tbk PWIB PT. INKA DI BANYUWANGI PWIB-CV-RFQ-100-024

REQUISITION SHEET 1 OF 8

REVISION HISTORY :
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
2 of 8

TABLE OF CONTENTS

1. GENERAL ..................................................................................................................................... 3
2. SCOPE OF WORK ........................................................................................................................ 3
3. MATERIAL SUPPLY ................................................................................................................... 4
4. TECHINCAL SPECIFICATION & BASIS DATA ...................................................................... 4
5. WORK VOLUME .......................................................................................................................... 4
6. WORK SCHEDULE ...................................................................................................................... 4
7. ATTACHMENTS .......................................................................................................................... 5
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
3 of 8

1. GENERAL

This requisition covers the requirements for Bridge Girder Supply for EPCC
Pembangunan Workshop INKA di Banyuwangi.

2. SCOPE OF WORK

The Subcontractor shall be responsible for all work items required to perform the work
according to the requirements of this requisition.

2.1. Direct Work

The Subcontractor shall perform all of the work which includes but not limited to
the following activities:

RESPONSIBILITY REMARK
NO WORK ITEM
C (ADHI) S/C
1 DESIGN AND ENGINEERING  −
2 SUPPLY OF MATERIAL −  See Section. 3
3 FABRICATION & WORSKSHOP
FINISHING − 
4 MATERIAL TRANSPORTATION, For permanent material
HANDLING AND STORING −  supplied by Subcontractor.
5 CONSTRUCTION WORK Include direct labor
 − mobilization
6 INSPECTION AND TESTING
− 
7 FINISHING WORK  
8 RECORDING AND REPORTING Recording Form required
  Contractor approval

2.2. Indirect Work

Any Indirect Work required to perform the Work shall be provided by


Subcontractor at his own cost and expenses.
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
4 of 8

RESPONSIBILITY REMARK
NO WORK ITEM C S/C
(ADHI)
1 CONSTRUCTION EQUIPMENT
N/A N/A
SUPPLY
2 HOME OFFICE COST − 
3 TRANSPORTATION − 
4 LOADING, UNLOADING AND
CUSTOMS CLEARANCE −  If any
5 MANPOWER MOBILIZATION /
N/A N/A
DEMOBILIZATION
6 SMALL CONSTRUCTION SUPPLIES N/A N/A
7 TEMPORARY FACILITIES FOR .
SUBCONTRACTOR N/A N/A
8 UTILITIES N/A N/A
9 GENERAL EXPENSES AND
SUPPLIES FOR SUBCONTRACTOR N/A N/A
10 INSURANCE −  Except CAR by Contractor
11 TAXES AND DUTIES −  Exclude VAT/PPN

3. MATERIAL SUPPLY BY MAINCONTRACTOR

N/A

4. TECHINCAL SPECIFICATION & BASIS DATA

N/A

5. WORK VOLUME

See Attachment-2

6. WORK SCHEDULE

1. The Subcontractor shall carry out and complete the Work.


2. The Project will be started on January 2019. Based on the Construction Schedule and
Milestones, The Material shall be supplied on Mid June 2019 until Late June 2019.
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
5 of 8

7. ATTACHMENTS

Attachment-1 Site Location


Attachment-2 Work Volume
Attachment-3 Drawing
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
6 of 8

ATTACHMENT-1
SITE LOCATION
PT.ADHI KARYA (PERSERO), Tbk

REQUISITION

Document No. :
Page Number
Bridge Girder Supply
PWIB-CV-RFQ-100-024
7 of 8

ATTACHMENT-2
WORK VOLUME
BILL OF QUANTITY
BRIDGE GIRDER SUPPLY

Harga Satuan Total Harga Biaya


No Item Pekerjaan Unit Quantity Total Biaya
Material Tenaga Kerja Alat Satuan Material Tenaga Kerja Alat
a b c d e f g h i j k l
1 Gelagar Pracetak Tipe I bentang 15.6 m Buah 4.00
2 Precast Slab m3 6.01
Beton Diafragma K350 termasuk
3 pekerjaan penegangan setelah m3 4.47
pengecoran (post tension)