You are on page 1of 48

ROOF HANDRAIL

with Eave Platform and Manhole Surround


for 30° Three-Panel and Four-Panel Grain Bin Roofs
18' - 156' [5 486 - 47 548 mm] Diameter

New Manhole
Surround *

NEW!
Bottom Kneebrace
replaces Grab Rail

New Eave Platform


w/ Spring Gate *

* Standard for all Bins with Roof Handrail

April 2013 MLD2028B


Warranty BROCK® Roof Handrail, 30° Roof

Warranty
Brock Grain Systems (“BROCK”) warrants each new BROCK® product manufactured by it to be free from
defects in material or workmanship for one year from and after the date of initial installation by or for the original
purchaser. If such a defect is found by the Manufacturer to exist within the one-year period, the Manufacturer
will, at its option, (a) repair or replace such product free of charge, F.O.B. the factory of manufacture, or (b) refund
to the original purchaser the original purchase price, in lieu of such repair or replacement. Labor costs associated
with the replacement or repair of the product are not covered by the Manufacturer.
CONDITIONS AND LIMITATIONS
1. The product must be installed by and operated in accordance with the instructions published by the
Manufacturer or Warranty will be void.
2. Warranty is void if all components of the system are not original equipment supplied by the Manufacturer.
3. This product must be purchased from and installed by an authorized dealer or certified representative thereof
or the Warranty will be void.
4. Malfunctions or failure resulting from misuse, abuse, negligence, alteration, accident, or lack of proper
maintenance shall not be considered defects under the Warranty.
5. This Warranty applies only to systems for the care of grain and feed. Other applications in industry or
commerce are not covered by this Warranty.
The Manufacturer shall not be liable for any consequential or special damage which any purchaser may suffer or
claim to suffer as a result of any defect in the product. “Consequential” or “special damages” as used herein
include, but are not limited to, lost or damaged products or goods, costs of transportation, lost sales, lost orders,
lost income, increased overhead, labor and incidental costs and operational inefficiencies.
THIS WARRANTY CONSTITUTES THE MANUFACTURER’S ENTIRE AND SOLE WARRANTY AND
THIS MANUFACTURER EXPRESSLY DISCLAIMS ANY AND ALL OTHER WARRANTIES,
INCLUDING, BUT NOT LIMITED TO, EXPRESS AND IMPLIED WARRANTIES AS TO
MERCHANTIBILITY, FITNESS FOR PARTICULAR PURPOSES SOLD AND DESCRIPTION OR
QUALITY OF THE PRODUCT FURNISHED HEREUNDER.
BROCK dealers are not authorized to modify or extend the terms and conditions of this Warranty in any manner
or to offer or grant any other warranties for BROCK® products in addition to those terms expressly stated above.
An officer of CTB, Inc. must authorize any exceptions to this Warranty in writing. The Manufacturer reserves the
right to change models and specifications at any time without notice or obligation to improve previous models.
Effective April 2013
BROCK GRAIN SYSTEMS
A Division of CTB Inc.
P.O. Box 2000 • Milford, Indiana 46542-2000 • U.S.A.
Phone (574) 658-4191 • Fax (574) 658-4133
e-mail: brock@brockgrain.com • Internet: http://www.brockgrain.com
and
1750 W. State Road 28 • Frankfort IN 46041
Phone (765) 654-8517 • Fax (765) 654-8510
Toll Free (800) 541-7900
e-mail: dryers@graindryers.com • Internet: www.ctbworld.com or www.graindryers.com
and
7400 East Thirteenth Street • Kansas City, Missouri 64126 • U.S.A.
Phone (816) 968-6101
Fax (816) 968-6272 TLX: 6841105

NOTE: The original, authoritative version of this Manual is the [English] version produced by CTB, Inc. or any of its subsidiaries or divisions,
(hereafter collectively referred to as "CTB"). Subsequent changes to any Manual made by any third party have not been reviewed nor authen-
ticated by CTB. Such changes may include, but are not limited to, translation into languages other than [English], and additions to or deletions
from the original content. CTB disclaims responsibility for any and all damages, injuries, Warranty claims and/or any other claims associated
with such changes, inasmuch as such changes result in content that is different from the authoritative CTB-published [English] version of the
Manual. For current product installation and operation information, please contact the Customer Service and/or Technical Service Depart-
ments of the appropriate CTB subsidiary or division. Should you observe any questionable content in any Manual, please notify CTB imme-
diately in writing to: CTB Legal Department, P.O. Box 2000, Milford, IN 46542-2000 USA.

Thank You
The employees of BROCK GRAIN SYSTEMS would like to thank you for your recent BROCK® purchase. If a
problem should arise, your BROCK dealer can supply the necessary information to help you.
2 MLD2028B
BROCK® Roof Handrail, 30° Roof General

General
Remember! Think SAFETY First!

This symbol is used throughout this Manual to identify particular stages where the bin Contractor and/or Operator
need to take special note and precautions regarding the danger described in these Instructions. Please read all the
SAFETY information and the instructions completely prior to beginning the construction.

Support Information
Using this equipment for any other purpose or in a way not within the operating recommendations specified
in this Manual will void the Warranty and may cause injury or death. This Manual is designed to provide
comprehensive planning and construction information for this BROCK® product. The Table of Contents provides
a convenient overview of the information in this Manual.

Distributor and Installer Information


Dealers: Please provide the Customer with the information to complete the easy reference below.
Dealer or Customer: Complete the following information about your BROCK® product.

Please fill in the following information about your Product.


Keep this Manual in a clean, dry place for future reference.
Distributor’s Name ________________________________________________________
Distributor’s Address ______________________________________________________
Distributor’s Phone ____________________________ Date of Purchase ____________
Installer’s Name ___________________________________________________________
Installer’s Address ________________________________________________________
Installer’s Phone _____________________________ Date of Installation ____________
System Specifications _____________________________________________________
_________________________________________________________________________

IMPORTANT!
A Manhole Surround and Eave Platform with Spring Gate
are now required with the Roof Handrail.

MLD2028B 3
Contents BROCK® Roof Handrail, 30° Roof

Contents
Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Remember! Think SAFETY First!. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Distributor and Installer Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Recognize SAFETY Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Understand Signal Words. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Follow SAFETY Instructions and SAFETY Decals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Roof Handrail SAFETY Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Handrail Planning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
About This Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Identification of Parts and Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Handrail Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-12
Parts Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Post Mounting Brackets and Posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Tubes, Posts, and Kneebraces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Connections at the Fillhole Platform (Farm Bins 18' - 48' [5 486 - 14 630]) . . . . . . . . . . 10
Connections at the Roof Guardrail (Commercial Bins 48' - 156' [14 630 - 47 548]) . . . . 11
Connections at the Eave Platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Handrail Connection Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-29
18' thru 30' [5 486 thru 9 144] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
33' and 36' [10 058 and 10 973] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
42' and 48' (Farm) [12 802 and 14 630] Dia.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
48' (Commercial), 54' and 60' [14 630, 16 459 and 18 288] Dia. . . . . . . . . . . . . . . . . . . 18-19
72' and 75' [21 946 and 22 860] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-21
78' [23 774] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-23
90' and 105' [27 432 and 32 004] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24-25
132' [40 234] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-27
156' [47 548] Dia. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28-29
Eave Platform and Manhole Surround . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30-45
Eave Platform and Manhole Surround Are Required with the Roof Handrail. . . . . . . . . . 31
Eave Platform Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32-33
Additional Installations for 42' [12 802] and 48' [14 630] Diameter Roofs . . . . . . . . . . 34-35
Eave Platform Spacing and Attachment to the Sidewall . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Eave Platform Height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38-39
Top Ladder and Cage Section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40-41
Cage To Platform Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Top Ladder Section Bracing to the Roof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Manhole Surround . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42-43
Assemble and Install the Spring Gate to the Platform . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Connect the Eave Platform to the Manhole Surround-Stairway Bottom . . . . . . . . . . . . . . 44
Parts Chart for 30° Roof Handrail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44-45

4 MLD2028B
BROCK® Roof Handrail, 30° Roof SAFETY

SAFETY
Recognize SAFETY Information
This is the Safety-Alert Symbol. When you see this symbol on your equipment or in
this Manual, be alert to the potential for personal injury. Signal words DANGER,
WARNING, or CAUTION, are used with the Safety-Alert Symbol.
This Symbol is used throughout this Manual to identify particular stages where the
bin Contractor and/or Operator need to take special note and precautions regarding
the DANGER described in these Instructions. Please read all the SAFETY
information and the instructions completely prior to beginning the construction.

Understand Signal Words


DANGER indicates an imminently hazardous situation which, if not avoided,
WILL result in death or serious injury.
WARNING indicates a potentially hazardous situation which, if not avoided,
COULD result in death or serious injury.
CAUTION indicates a hazardous situation which, if not avoided, MAY result in
minor or moderate injury.

Follow SAFETY Instructions and SAFETY Decals


Carefully read all SAFETY messages in this Manual and on your equipment
SAFETY signs. Follow recommended precautions and safe operating practices.
Keep SAFETY Signs in good condition. Replace missing or damaged SAFETY Signs.

Roof Handrail SAFETY Procedures


WARNING! Failure to comply with the following instructions may result in death or
serious injury.
1. Never climb a damaged or improperly assembled Handrail. Inspect it carefully
before use.
2. Keep Handrail components free from slippery material such as ice, mud, snow,
grease, manure, etc.
3. Wear slip-resistant shoes.
4. Do NOT climb onto the roof if you tire easily, or are subject to fainting spells, or
use medicine or alcohol or are physically handicapped. Never climb when in poor
health.
5. Maintain a firm grip on the Handrails. Center your body between the Rails and bin.
6. Replace the Handrail if it is exposed to fire or damaging chemicals.
7. Never use the Handrail as a platform, plank or material hoist.
8. Never apply a side load. Never push or pull anything while on the Handrail.
9. Never drop or apply an impact load to the Handrail.
10. Never sit on the Handrails.
11. Never use the Handrail as a scaffold.

Handrail Planning
The BROCK® Roof Handrail, when properly installed, is designed to meet or
exceed specifications required by ASAE Standard S412.1.
Refer to your appropriate Roof Construction Manual to install Roof Panels, Roof
Ladder, Roof Ladder Handrail where applicable, and the Manhole.
MLD2028B 5
About This Manual BROCK® Roof Handrail, 30° Roof

About This Manual


The intent of this Manual is to help you in two ways. One is to follow step-by-step in
the order of assembly of your Roof Handrail. The other way is for easy reference if
you have questions in a particular area.
IMPORTANT! Read ALL instructions carefully BEFORE starting construction.
IMPORTANT! Pay particular attention to all SAFETY information on Page 3.
• Metric measurements are shown in millimeters and in square brackets following
the English measurement, unless otherwise specified. " equals inches and ' equals
feet in English measurements.
Example:
15' [4 572] 24' [7 315]
• "Horizontal” (—) and “Vertical” (l), Bottom and Top, in the instructions refer to the
Grain Bin as it is standing.
• “Left”and “right” refer to the Grain Bin as you are looking at it from the outside.
• Major changes from the last printing will be listed on the back cover.
• This Planning Symbol is used in areas where planning needs to take place before
construction continues.

Identification of Parts and Hardware


IMPORTANT: No hardware substitutions are permitted unless noted.
Diagrams are provided throughout this manual to identify Parts and Hardware used
in that application.
• Parts and basic components are identified in Figures and their accompanying
Tables as “Items” with a black number in white circle.
• Hardware (and hardware connections between Parts) are identified with a white
number in a shaded circle. See Figure 1.
• Dimensions and lengths are noted with a white circle on an arrow or line, then
identified with numeric values in the Figure Table.
• Specific holes, positions, or locations mentioned in the text are noted in the Fig-
ure with an *asterisk.
COMPONENT
2
21
23 HARDWARE or
HARDWARE/COMPONENT
2 connection

Item Part No. Description


21 39-20020 Nut, Hex 5/16''
23 39-20072 Bolt, HHBS 5/16 x 3/4'' Gr. 8.2
35 9-53629 Bracket, Manhole Guard
Figure 1.
35 Parts and Hardware Identification

6 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Assembly

Handrail Assembly

Parts Identification
Item Part No. Description Dimensions
1 9-21663 Handrail Post 35 3/4'' x 6'' w
2 9-21662 Handrail Post Mounting Bracket 3 3/16'' x 6 1/2'' w
4 9-21669 Handrail Knee Brace 31 11/16'' x 1 1/4'' dia.
5 9-21666 Handrail Tube - SHORT 30° 21 13/16'' [554]
6 9-21667 Handrail Tube - MEDIUM 30° 42 15/32'' [1 079]
7 9-21668 Handrail Tube - LONG 30° 63 5/32'' [1 604]
8 9-15626 Tube INSIDE 1.163'' Dia. x 16'' [406]
9 9-26191 Tube OUTSIDE 1 1/4'' Dia. x 72'' [1 829]
10 9-26196 Tube OUTSIDE (not shown) 1 1/4'' x 36'' [914]
12 9-26337 Tube OUTSIDE (not shown) 1 1/4'' Dia. x 22'' [559]
13 U-23779 Ladder Locking Clip Assembly 4
14 9-54343 Tube 42’-48’ BOTTOM 49.343'' [1 253]
9-24821 52 5/8'' [1 337]
16* 9-25119 Kneebrace 1 3/16'' Ø 53 7/8'' [1 368]
9-37849 53 3/32'' [1 349]
17 9-38103 Handrail Tube - LONG 30° (105', 132', 156') 64.737'' O.A. [1 679] 1
18 39-20020 Nut, Hex 5/16''
19 39-20155 Washer, Weatherseal 5/16''
20 39-20126 Screw, Self-Drilling 3/4''
21 39-20152 Nut, Flange 5/16''
22 39-20072 Bolt, HHBS 5/16 x 3/4'' Gr. 8.2
23* 39-20070 Bolt, HHBS 5/16 x 1'' Gr. 8
*These items shipped with other kits.

8 2

5
6
7

17

13

22 20
19 18
21
23 Figure 2.
Parts Identification

MLD2028B 7
Handrail Assembly BROCK® Roof Handrail, 30° Roof

Post Mounting Brackets and Posts


Locate the Ladder Roof Panel, the Panel left of the Manhole.
1. Locate Handrail Posts (Item 1) and Handrail Post Mounting Brackets (Item 2).
Mounting Brackets are installed along this Roof Panel as shown in the Diagrams
on Pages 8-29 of this Manual. Locate the diagram for your Roof diameter for
proper Bracket positions. (Refer to your Roof Manual for Roof Ladder Rung
installation.)
2. Turn each Mounting Bracket so that a slotted hole falls directly over the rib in
front of (on the eave side of) the Post. See Detail B.
3. Bolt the Mounting Bracket to the Rib with two 5/16 x 1'' Hex Head Bin Seal Bolts
(Item 23), and 5/16'' Weatherseal Washer (Item 19) above the Rib; and Hex Nuts
(Item 18) under the Rib. Bolts are in the Roof package. See Figures 3 and 4.
4. Bolt each Post (Item 1) to the front of the Mounting Brackets (Item 2) with two
5/16 x 3/4'' Hex Head Bin Seal Bolts (Item 22) and Hex Nuts (Item 18) as shown
in Figures 3 and 4. See Detail A.

Item Part No. Description


22
1 9-21663 Handrail Post
2 9-21662 Handrail Post Mounting Bracket
3 Stiffener Ring (where used)
4 9-21669 Handrail Kneebrace
2 60 5 9-21666 Handrail Tube - SHORT 30°
6 9-21667 Handrail Tube - MEDIUM 30°
1
7 or 17 varies Handrail Tube - LONG
11 varies Stiffener, WR Bracket
18 39-20020 Nut, Hex 5/16''
19 * 19 39-20155 *Washer, Weatherseal 5/16''
22 39-20072 Bolt, HHBS 5/16 x 3/4'' Gr. 8.2
22 23* 39-20070 Bolt, HHBS 5/16 x 1'' Gr. 8
60 varies Roof Ladder Panel
Detail A 18
64 Manhole
77 varies Roof Ladder Rung
18 * Required between Brackets and Roof Rib at these
connection points (Bolts used to fasten Mounting
Brackets to Roof are included in the Roof package.

1 26

18
2 23 19 22

26
2
18

Detail B

Figure 3.
Handrail Post Mounting Bracket to Roof Rib

8 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Assembly

Tubes, Posts and Kneebraces


1. Bolt the Handrail Kneebrace (Item 4) to the Roof Rib behind both Bottom
Handrail Posts.See Detail D.
2. Bolt Handrail Tubes (Item 5) SHORT, (Item 6) MEDIUM and (Item 7 or 17)
LONG, to the Handrail Posts (Item 1). See Detail C. There should be 24'' [610]
between the upper and lower Tubes.
3. See pages 40-41 for attachment to the Eave Platform.

Detail C TUBES VARY


5 6 7 17 Detail C

1
22
18

1
11
1
TUBES VARY
Detail A,
3
facing page Detail D

23
19

4
18

4
19

4 77 Detail E

TUBES VARY
Detail D 64
77
18 22

4
1
Figure 4.
Handrail Assembly Overview;
See Item Table on facing page. (48' shown. See Diagrams on pp. 14-15 for side view.)

MLD2028B 9
Handrail Assembly BROCK® Roof Handrail, 30° Roof

Connections at the Fillhole Platform


(Farm Bins 18'- 48' [5 486 - 14 630] Diameter)
If your Grain Bin is an 18' [5 486] diameter through 48' [14 630] diameter Farm
Roof with a Fillhole Platform, bolt the Outside Tube (Item 12) to the Fillhole Plat-
form Post (Item 15A). See Figure 5. Then slide the Inside Tube (Item 8) into the
Outside Tube (Item 12) and bolt them to Handrail Post (Item 1).
Install a Drill Screw (Item 20) through the Outside Tube (Item 12) and the Inside
Tube (Item 8) on the bottom side of the Tubes.
Refer to BROCK® Manual MCB1395 (left) for Fillhole Platform installation
instructions.

22

8
22 12
20
18
18
15A
1

Item Part No. Description


1 9-21663 Handrail Post
15A 8 9-15626 Tube-INSIDE
9 9-26191 Tube-OUTSIDE
10 9-26196 Tube-OUTSIDE
12 9-26337 Tube-OUTSIDE
15A* 9-22517 Fillhole Platform Post
15B* 9-24818 Guardrail Post
9-24821
16* 9-25119 Guardrail Kneebrace 1 3/16'' Ø
9-37849
27* varies Roof Top Panel
28* varies Transition Ladder Rung
18 39-20020 Nut, Hex 5/16''
20 39-20126 Screw, Self-Drilling 3/4''
22 39-20072 Bolt, HHBS 5/16 x 3/4'' Gr. 8.2
NOTE: Intermediate Rails are similar.
*These items shipped with other kits.

Figure 5.
Handrail-to-Fillhole Platform
Connection Detail;
18' - 48' [5 486 - 14 630] Dia. Farm Grain Bins

10 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Assembly

Connections at the Roof Guardrail


(Commercial Bins 48' - 156' [14 630 - 47 548] Diameter)
If your Grain Bin is a 48' [14 630] through 156' [47 548] diameter Commercial with a
10° Roof Top or a Flat Top Roof, make the following Handrail-to-Guardrail connections:
60' - 72' [18 288 - 21 946]] diameters: Attach the Outside Tube (Item 9) to the
Guardrail Post (Item 15B).
48' - 54' [14 630 - 16 459] and 75'to 156' [22 860 - 47 549] diameters: Attach the
Outside Tube (Item 10) to the Guardrail Post (Item 15B).
Next, slide the Inside Tube (Item 8) into the Outside Tube (Item 9 or 10) and bolt the
Inside Tube (Item 8) to the Handrail Post (Item 1). Install a Drill Screw (Item 20)
through the Outside Tube (Item 9 or 10) and the Inside Tube (Item 8) on the bottom
side of the Tubes.
Detail
9 10
9 or 10 or

8
8 1
Detail
15B
15B
20
20

28
28

15B
27

VIEW FROM FILLHOLE


Bend down 120°
*
9 or 10
22
8

20
22

15B
16
1
18
Detail
Figure 6.
Handrail-to-Guardrail Connection Detail
48' - 156' Dia. [14 630 - 47 548] Commercial Grain Bins
Item Table on facing page
MLD2028B 11
Handrail Assembly BROCK® Roof Handrail, 30° Roof

Connections at the Eave Platform


Whenever a Roof Stairway or Handrail is installed on a Farm or Commercial Roof,
an Eave Package (9-54375) MUST be installed. This package allows guarded access
to both the Roof Handrail and Manhole.
WARNING! DO NOT REMOVE any components from the Roof Handrail to gain
access to the Manhole. DO NOT attempt to crawl through or climb over
the Stairway side components to gain access to the Manhole. Failure to
properly install and/or use this Eave Platform-Manhole Surround
component could result in death or serious injury.

36
6

63 53

39
77


DO NOT modify, remove,
climb over/through or
disregard side rails installed
between the Manhole and 24
Roof Handrail/Stairway! WALK HERE
Always use the Eave
Platform to move between
the Roof Stairway/Handrail
and the Manhole!

Item Description
6 Manhole Surround
24 Platform Floor Plate
36 Tube, Ladder Rung (varies)
39 Spring Gate
53 Top Ladder Section
63 Manhole
77 Rung, Roof Ladder
Figure 7.
Eave Platform Alignment Under
Roof Handrail (or Stairway) and Manhole

12 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Assembly

This page left intentionally blank for your convenience.

MLD2028B 13
Handrail Connection Diagrams BROCK® Roof Handrail, 30° Roof

Handrail Connection Diagrams

Figure 8.
Roof Handrail (Side View)

IMPORTANT! Numbers indicate the Bolt holes along a Rib.


Roofs with Single Panels 15' - 60' [4 572 - 18 288]: Start the Bolt hole
count from the TOP.
Roofs with Upper and Lower Panels 72' - 105' [21 946 - 32 004]: Start the
Bolt hole count from the BOTTOM.
Roofs with Upper, Mid and Lower Panels 132' [40 234]: Start the Bolt
hole count from the BOTTOM of each Panel.
Roofs with Upper, Mid-Upper, Mid-Lower and Lower Panels 156'
[47 548]: Start the Bolt hole count from the BOTTOM of each Panel.

14 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Connection Diagrams

27'
8 12 8 12
7 [8 230]
5 18'
5
6 [5 486]
4 6

4 11A
1 1
8 12
6
11A 11A 30'
6 [9 144]

8 12 5
6
21' 4 11A
6 [6 401]

4
11A
1 Number indicates
1 Bolt holes along
11A a Rib.

8 12 Item Part No. Description


11A 6 1 9-21663 Handrail Post
24' 2 9-21662 Handrail Post Mounting Bracket
6 [7 315]
4 9-21669 Handrail Kneebrace
5 9-21666 Handrail Tube - SHORT 30°
6 6 9-21667 Handrail Tube - MEDIUM 30°
4 7 9-21668 Handrail Tube - LONG 30°
11A
2 8 9-15626 Tube INSIDE 1.163 Dia. x 16''
11 varies Stiffener/Walk Ring Bracket
1 12 9-26337 Tube - OUTSIDE 1 1/4'' x 22''
1 Refer to the PARTS CHART on Page 44-45.
#) Figure 9.
5 T H OL E Handrail Connection Diagrams
11A OL 30° Roof Handrail on 18' [5 486] through 30' [9 144] Dia. Grain Bins
(B

LADDER RUNG placement and length in this hole position from TOP
Roof Dia.
11th
10th 9th 8th 7th 6th 5th 4th 3rd
RR
18' [5 486] P 26'' [660] P P WR 4-Panel
34'' [864] 3-Panel
RR
21' [6 401] P 27'' [686] P SR P WR 4-Panel
35'' [890] 3-Panel
RR
24' [7 315] P 27'' [686] P SR P P WR 4-Panel
36'' [914] 3-Panel
RR RR
27' [8 230] P 27'' [686] P P SR 15'' [381] P WR 4-Panel
36'' [914] 19'' [483] 3-Panel
RR RR
30' [9 144] P 28'' [711] P P SR P 13'' [330] P WR 4-Panel
36'' [914] 17'' [432] 3-Panel
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung, 4-Panel length, followed by 3-Panel
MLD2028B 15
Handrail Connection Diagrams BROCK® Roof Handrail, 30° Roof

8 12
33'
7 [10 058]

6
5
11A
6
4

1
8 12

11A 7
36'
11A [10 973]

2
7

5 1
#)
E
6 7T H OL
O L
4 (B

Item Part No. Description


1 9-21663 Handrail Post
1 2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace
11A 5 9-21666 Handrail Tube - SHORT 30°
6 9-21667 Handrail Tube - MEDIUM 30°
Number indicates Bolt 7 9-21668 Handrail Tube - LONG 30°
holes along a Rib. 8 9-15626 Tube INSIDE 1.163 Dia. x 16''
11 varies Stiffener/Walk Ring Bracket
12 9-26337 Tube - OUTSIDE 1 1/4'' x 22''
Figure 10. Refer to the PARTS CHART on Page 44-45.
Handrail Connection Diagrams
30° Roof Handrail on 33' [10 058] and 36' [10 973] Diameter Grain Bins
Start the Bolt hole count from the TOP.

LADDER RUNG placement and length in this hole position from TOP

33' [10 058] Diameter Roof


13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd
RR RR RR
4-Panel P 28'' [711] P P SR P 15'' [381] 12'' [305] P WR
3-Panel 37'' [940] 20'' [508] 16'' [406]

36' [10 973] Diameter Roof


RR RR RR RR
4-Panel P 28'' [711] P P 21'' [533] SR P 14'' [356] 12'' [305] P WR
3-Panel 37'' [940] 27'' [686] 18'' [457] 15'' [381]
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung, 4-Panel length, followed by 3-Panel

16 MLD2028B
8 12 42'
6 [12 802]
MLD2028B

BROCK® Roof Handrail, 30° Roof


2 Detail
7

1 7
#) 11A
E
7 H OL
O LT 14
( B

4 8 12
FARM ROOF
Item Part No. Description 48'
1 9-21663 Handrail Post 7 [14 630]
11B
2 9-21662 Handrail Post Mounting Bracket 1
4 9-21669 Handrail Kneebrace 7
5 9-21666 Handrail Tube - SHORT 30° Field drill holes
6 9-21667 Handrail Tube - MEDIUM 30° 11A
7 9-21668 Handrail Tube - LONG 30°
8 9-15626 Tube INSIDE 1.163 Dia. x 16'' 7 Number indicates Bolt
11 varies Stiffener/Walk Ring Bracket holes along a Rib.
5 Detail
12 9-26337 Tube - OUTSIDE 1 1/4'' x 22''
14 9-54343 Tube 42'-48' BOTTOM 14
Refer to the PARTS CHART on Page 44-45.
4
1
Figure 11.
Handrail Connection Diagrams, 30° Roof Handrail 11B
on 42' [12 802] and 48' [14 630] Diameter Grain Bins
Start the Bolt hole count from the TOP. LADDER RUNG placement and length in this hole position from TOP
Field drill holes

Handrail Connection Diagrams


42' [12 802] Diameter Roof
17th 16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd
RR RR RR RR RR RR
P 29'' [737] 27'' [686] P 23'' [584] SR P 17'' [432] 15'' [381] P 11'' [279] P WR
37'' [940] 34'' [864] 29'' [737] 21'' [533] 18'' [457] 13''[330]

48' [14 630] Diameter Farm Roof


RR RR RR RR RR RR RR
P 29'' [737] 27'' [686] P P SR 20'' [508] P 17'' [432] 15'' [381] P 11'' [279] 10'' [254] P WR
17

37'' [940] 35'' [889] 26'' [660] 21'' [533] 19'' [483] 14'' [356] 12'' [305]
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung, 4-Panel length, followed by 3-Panel
8 10
2 15
18

Handrail Connection Diagrams


7 48'
11B
1 [14 630]
16
#) 7 COMMERCIAL
Commercial Roofs: E ROOF
7 TH
OL
Roof Stiffener Rings may/may not OL
be provided, based on Bin model. (B
6
Roof Stiffener Rings are shown Detail 15
8 10
for existing Roofs. If they are not 7
provided for your model, use the 11A
6 7 54'
appropriate Ladder Rung instead. [16 459]
4 16
7
1
7

7 8 9 15
11A
5
7 60'
6 [18 288]
4 16
7
11C
1
7
11A
Detail

BROCK® Roof Handrail, 30° Roof


7
6
4
11C

1 Figure 12.
Handrail Connection Diagrams
Number indicates Bolt 30° Roof Handrail on 48' [14 630], 54' [16 459] and 60' [18 288] Diameter
MLD2028B

holes along a Rib. COMMERCIAL Bins


Start the Bolt hole count from the TOP.
MLD2028B

BROCK® Roof Handrail, 30° Roof


Item Part No. Description
1 9-21663 Handrail Post
2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace
5 9-21666 Handrail Tube - SHORT 30°
6 9-21667 Handrail Tube - MEDIUM 30°
7 9-21668 Handrail Tube - LONG 30°
8 9-15626 Tube - INSIDE 1.163 Dia. x 16''
9 9-26191 Tube - OUTSIDE 1 1/4'' x 72''
10 9-26196 Tube OUTSIDE 1 1/4'' x 36''
11 varies Stiffener/Walk Ring Bracket
15 9-24818 Fillhole Platform Post
16 varies Kneebrace
Refer to the PARTS CHART on Page 44-45.
LADDER RUNG Placement and Length in this Hole Position from TOP

48' [14 630] Diameter Commercial Roof


17th 16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd
P RR P RR RR P RR P RR RR P WR RR
4-Panel 28'' [711] 25'' [635] 24'' [610] 20'' [508] 16'' [406] 14'' [356] 9'' [229]

54' [16 459] Diameter Roof


17th 16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd
RR RR RR RR RR RR RR RR
P P P P P P WR
4-Panel 28'' [711] 24'' [610] 22'' [559] 19'' [483] 18'' [467] 14'' [356] 13'' [330] 8'' [203]

60' [18 288] Diameter Roof


17th 16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd

Handrail Connection Diagrams


RR RR RR RR RR RR RR RR
4-Panel P 29'' [737] P 26'' [660] 25'' [635] P 22'' [559] 20'' [508] P 18'' [457] 16'' [406] P 13'' [330] WR
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung
19
20

Handrail Connection Diagrams


8 9
2 15
7 72'
16 [21 946]
1
7
#)
7 T H OL E
OL 7
(B

8 10
7 11A
15
7 75'
16 [22 860]
7
5 7
6
4 12

1 7
11C
11A
7

6
4

BROCK® Roof Handrail, 30° Roof


11C
1
Number indicates Bolt
holes along a Rib.
Figure 13.
Handrail Connection Diagrams
30° Roof Handrail on 72' [21 946] and 75' [22 860] Diameter Grain Bins
Start the Bolt hole count from the BOTTOM.
MLD2028B
MLD2028B

BROCK® Roof Handrail, 30° Roof


Item Part No. Description
1 9-21663 Handrail Post
2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace
5 9-21666 Handrail Tube - SHORT 30°
6 9-21667 Handrail Tube - MEDIUM 30°
7 9-21668 Handrail Tube - LONG 30°
8 9-15626 Tube - INSIDE 1.163 Dia. x 16''
9 9-26191 Tube - OUTSIDE 1 1/4'' x 72''
10 9-26196 Tube OUTSIDE 1 1/4'' x 36''
11 varies Stiffener/Walk Ring Bracket
15 9-24818 Fillhole Platform Post
16 varies Kneebrace
Refer to the PARTS CHART on Page 44-45.

LADDER RUNG placement and length in this hole position from BOTTOM
72' [21 946] Diameter Roof
Upper Panel 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th Lower Panel
P RR P P RR RR P RR RR P RR RR P RR RR P RR WR P
29'' [737] 26'' [660] 24'' [610] 22'' [559] 21'' [533] 19'' [483] 18'' [467] 15'' [381] 14'' [356] 12'' [305]

75' [22 860] Diameter Roof


Upper Panel 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th Lower Panel
RR RR RR RR RR RR RR RR RR RR RR
P 29'' [737] P 27'' [686] P 24'' [610] 23'' [584] P 21'' [533] 20'' [501] P 18'' [467] 17'' [432] P 14'' [356] 13'' [330] P 11'' [279] WR P
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung, 4-Panel length, followed by 3-Panel

Handrail Connection Diagrams


21
22

Handrail Connection Diagrams


8 10
15
7 16
78'
[23 774]

7
11A
7

Number indicates
7
Bolt holes along
a Rib.
7
4 6

1 11C

BROCK® Roof Handrail, 30° Roof


1
Figure 14.
#) Handrail Connection Diagrams
6T HOLE 30° Roof Handrail on 78' [23 774] Diameter Grain Bins
OL Start the Bolt hole count from the BOTTOM.
(B
MLD2028B
MLD2028B

BROCK® Roof Handrail, 30° Roof


Item Part No. Description
1 9-21663 Handrail Post
2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace
5 9-21666 Handrail Tube - SHORT 30°
6 9-21667 Handrail Tube - MEDIUM 30°
7 9-21668 Handrail Tube - LONG 30°
8 9-15626 Tube INSIDE 1.163 Dia. x 16''
10 9-26196 Tube OUTSIDE 1 1/4'' x 36''
11 varies Stiffener/Walk Ring Bracket
15 9-24818 Fillhole Platform Post
16 varies Kneebrace
Refer to the PARTS CHART on Page 44-45.

LADDER RUNG placement and length in this hole position from BOTTOM

78' [23 774] Diameter Roof


Upper Panel 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th
1st
2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th Lower Panel
P 29''RR
RR RR RR RR RR RR RR RR RR RR RR
[737] P 27'' [686] 26'' [660] P 24'' [610] 22'' [559] P 20'' [508] 19'' [483] P 17'' [432] 16'' [406] P 14'' [356] 13'' [330] P 11'' [279] WR P
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung

Handrail Connection Diagrams


23
24

Handrail Connection Diagrams


8 10 15
6 90'
7 16 [27 432]

7 8 10 15
11C
7 7 105'
16 [32 004]
7 11A 7

7 7
17 11A
7
4 6 7

1 6
7
Item Part No. Description
11C 1 9-21663 Handrail Post
7 2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace
4 6 6 9-21667 Handrail Tube - MEDIUM 30°
2 7 9-21668 Handrail Tube - LONG 30°
11C
1 1 8 9-15626 Tube INSIDE 1.163 Dia. x 16'' [406]
10 9-26196 Tube OUTSIDE 1 1/4'' x 36'' [914]
#) 11 varies Stiffener/Walk Ring Bracket

BROCK® Roof Handrail, 30° Roof


Number indicates 6T HOLE 15 9-24818 Fillhole Platform Post
Bolt holes along OL
a Rib. (B 16 varies Kneebrace
17 9-38103 Handrail Tube - LONG 30° (105', 132', 156')
Start the Bolt hole count from the BOTTOM. Refer to the PARTS CHART on Page 44-45.

Figure 15.
Handrail Connection Diagrams
MLD2028B

30° Roof Handrail on 90' [27 432] and 105' [32 004] Diameter Grain Bins
MLD2028B

BROCK® Roof Handrail, 30° Roof


LADDER RUNG placement and length in this hole position from BOTTOM
90' [27 432] Diameter Roof
Upper Panel 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th Lower Panel
RR RR RR RR RR RR RR RR RR RR RR RR RR RR
P 29'' P 28'' P 26'' 25'' P 23'' 22'' P 20'' 19'' P 17'' 16'' P 14'' 13'' P 12'' 11'' P WR P
[737] [711] [660] [635] [584] [559] [508] [483] [432] [406] [356] [330] [305] [279]
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung

105' [32 004] Diameter Roof


Upper Panel 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th Mid Panel
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th Lower Panel
RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR
P 29'' P 28'' P 26'' 26'' P 24'' 23'' 22'' 21'' P 20'' 19'' P 17'' 17'' P 15'' 14'' P 23'' 21'' P 18'' 17'' P WR 12'' P
[737] [711] [660] [660] [610] [584] [559] [533] [501] [483] [432] [432] [381] [356] [584] [533] [467] [432] [305]
WR - Walk Ring P - Post SR - Stiffener Ring RR - Roof Ladder Rung

Handrail Connection Diagrams


25
Handrail Connection Diagrams BROCK® Roof Handrail, 30° Roof

132' Overview

Page 26 Page 27

132' LOWER Roof Panel


Roof Rib Hole
up from Ladder Rung
Bottom/Eave Part No. 17
14 MID ROOF PANEL:
13 Twelve (12) Ladder Rungs attach.
12 9-19823
or Stiffener Ring**
11 9-19824
10 9-19824
9 9-19825
8 9-19825
7 9-19826
6 9-19827
5 9-19827
7 11C
4 9-19828
3 9-19829
2 9-19829
1 9-19830
**Existing Models

6 The two (2) top holes #13 and #14 align under
the bottom two holes in the MID Roof Panel.
4 11C LOWER ROOF PANEL:
Eleven (11) Ladder Rungs attach.

1
**Existing Models

26 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Connection Diagrams

132' MID Roof Panel


Roof Rib Hole Ladder Rung Part
up from
Bottom/Eave No.
15
14
13 9-19815
12 9-19815 UPPER ROOF PANEL:
or Stiffener Ring**
Thirteen (13) Ladder Rungs attach.
11 9-19816
Do NOT attach a Ladder Rung in the third hole
10 9-19816
9 9-19817
down (tenth hole from the bottom), where the
8 9-19818 Walk Ring/Bracket attaches.
7 9-19818
6 9-19819 8 10
5 9-19820 7
4 9-19820 15
3 9-19821
2 9-19822 6 16
1 9-19822

11A

17 1

132' UPPER Roof Panel


Item Part No. Description Roof Rib Hole
Ladder
1 9-21663 Handrail Post up from Rung Part
Bottom/Eave No.
2 9-21662 Handrail Post Mounting Bracket 14 9-19810
4 9-21669 Handrail Kneebrace 13 Walk Ring
6 9-21667 Handrail Tube - MEDIUM 30° 12 9-19812
7 9-21668 Handrail Tube - LONG 30° 11 9-19813
8 9-15626 Tube INSIDE 10 9-19815
9 9-19816
10 9-26196 Tube OUTSIDE
8 9-19817
11A 9-23987 7 9-19819
Stiffener Ring Bracket*
11C 9-12798 6 9-19820
13 U-23779 Ladder Locking Clip Assembly 5 9-19821
14 U-24316 Ladder Extension Brace Bracket 4 9-19823
15A* 9-24818 Fillhole Platform Post 3 9-19824
2 9-19825
16C* 9-25119 Kneebrace 1 3/16'' Ø 1 9-19826
17 9-38103 Handrail Tube - LONG 30°
(105', 132', 156')
Refer to the PARTS CHART on Page 44-45.

Figure 16.
HANDRAIL LOCATION DIAGRAMS
30° Handrail for 132' [40 234] Dia.
Commercial Roofs

MLD2028B 27
Handrail Connection Diagrams BROCK® Roof Handrail, 30° Roof

156' Overview

Page 28 Page 29

156' MID-LOWER Roof Panel


Roof Rib Hole
up from Ladder Rung
Bottom/Eave Part No.
14
13
12 9-19818 or
Stiffener Ring**
11 9-19819
156' LOWER Roof Panel 10 9-19819
Roof Rib Hole 9 9-19820
up from Ladder Rung
Bottom/Eave Part No. 8 9-19820
13 7 9-19821
12 6 9-19821
9-19825 or 5 9-19822
11 Stiffener Ring** 4 9-19822
10 9-19825 3 9-19823
9 9-19826 2 9-19823 7
8 9-19826 1 9-19824
7 9-19827
6 9-19827
5 9-19828
4 9-19828
3 9-19829
2 9-19829
1 9-19830
11C
6
MID-LOWER ROOF
7 PANEL: The two (2)
**Existing Models top holes #13 and #14
align under the bottom
6 two holes in the MID-
4 UPPER Roof Panel.

11C LOWER ROOF PANEL:


The two (2) top holes #12 and #13 align under the
bottom two holes in the MID-LOWER Roof Panel.
1 **Existing Models
28 MLD2028B
BROCK® Roof Handrail, 30° Roof Handrail Connection Diagrams

156' UPPER Roof Panel


Roof Rib Hole Ladder
up from Rung Part
Bottom/Eave No. UPPER ROOF PANEL:
12
Do NOT attach a Ladder Rung in
11 9-19808
the third hole down (tenth hole
10 Walk Ring from the bottom), where the
9 9-19811 Walk Ring/Bracket attaches.
8 9-19812
7 9-19813
6 9-19814 8 10
5 9-19815
4 9-19816 7 15
3 9-19817 16
2 9-19818 6
1 9-19819
7

7
11A
17
MID-UPPER ROOF PANEL
7

7
Item Part No. Description
1 9-21663 Handrail Post
2 9-21662 Handrail Post Mounting Bracket
11C 4 9-21669 Handrail Kneebrace
6 9-21667 Handrail Tube - MEDIUM 30°
**Existing Models 7 9-21668 Handrail Tube - LONG 30°
8 9-15626 Tube INSIDE
156' MID-UPPER Roof Panel 10 9-26196 Tube OUTSIDE
Roof Rib Hole Ladder Rung
up from 11A 9-23987
Part No. Stiffener Ring Bracket
Bottom/Eave 11C 9-12798
15 13 U-23779 Ladder Locking Clip Assembly
14 14 U-24316 Ladder Extension Brace Bracket
13 9-19811 15A* 9-24818 Fillhole Platform Post
12 9-19812 or
Stiffener Ring** 16C* 9-25119 Kneebrace 1 3/16'' Ø
11 9-19812 17 9-38103 Handrail Tube - LONG 30°
(105', 132', 156')
10 9-19813
9 9-19813 Refer to the PARTS CHART on Page 44-45.
8 9-19814
7 9-19814
6 9-19815
5 9-19815
4 9-19816
Figure 17.
3 9-19816
2 9-19817 HANDRAIL LOCATION DIAGRAMS
1 9-19817 30° Handrail for 156' [47 548] Dia.
Commercial Roofs

MLD2028B 29
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Eave Platform and Manhole Surround

Figure 18.
Eave Platform and Manhole Surround
with Roof Ladder
90' [27 432] Roof shown
30 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

Eave Platform/Manhole Surround Are Required


with the Roof Handrail
WARNING! Whenever a Roof Stairway is installed on any Farm or Commercial Roof
18' [5 486] through 156' [47 548], this Eave Platform/Manhole Surround
package MUST be installed. This package allows guarded access to
both the Roof Stairway and Manhole. DO NOT REMOVE any
components from the Roof Stairway to gain access to the Manhole. DO
NOT attempt to crawl through or climb over the Stairway side
components to gain access to the Manhole. See also Figure 2 on page
6. Failure to properly install and/or use this Eave Platform/Manhole
Surround package in conjunction with a Roof Stairway could result in
death or serious injury.
IMPORTANT! Refer to your Roof Manual for proper installation of ALL Roof
components BEFORE an Eave Platform is installed. Use all Eave
Platform Brackets shown.
All Eave Platforms with Outside Ladders span three Roof Panels. The Eave
Platform Plate (Item 24) aligns directly under the Roof Ladder Panel (Item 77) and
the Roof Manhole Panel (Item 64) to its right.

All Eave Platforms and their Outside Ladders


span three Roof Panels.
The Platform aligns under the Roof Ladder Panel
(1) and the Roof Manhole Panel (2) to its right.
77 64 The Ladder-and Cage aligns with the standard
Roof Panel to the right of the Manhole Panel (3).

1 2 3
66
53

24

Figure 19.
Top View
90' [27 432] Roof shown
The Eave Platform floor is installed under both the Roof Ladder and Manhole
Panels, with the Floor Plate even with the Eave. To ensure proper fit, do not install
with the Floor level one Body Sheet below the Eave.
The Top Ladder section is located to the right of the Eave Platform. (Bins with side
Ladders and Rest Platforms not using this Manhole-Eave Package will follow the
standard layout in BROCK® Platform Manual MLD2026. If there is no Eave
Platform the top Ladder starts in line with the Roof Ladder Panel.)
A Spring Gate assembly must be installed between the right (open) end of the Eave
Platform and the Ladder-and-Cage access.
A Manhole Surround is installed on the right side and Fillhole (upper) end of the
Manhole, and is connected to the Stairway vertical Posts.
While Platform assembly is the same for all diameters, on 42' and 48' models,
Platform connection to the Manhole Surround differs from other diameters. If you
are installing this Platform package to a 42' or 48' Roof, follow the additional
instructions on pages 34-35.
MLD2028B 31
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Eave Platform Overview


1 TOP VIEW
Item 36 is included with other Roof Ladder
Rungs. For each model, this will be the Rung
36 for this typical height position (Item 65) in
62 the Ladder Panel to the left. Refer to your
61 Roof Manual for your diameter Roof for
specific Rung lengths and Part Numbers.
2

60 4
51

26 26
55
6 35
56
6

37 39
65 52
4

2
30
4
31 64
54
30
26
26

24 55

56
25
25
66
27

53

63
29
33
25
27
Figure 20.
28 Roof Handrail at Eave Platform and
Manhole Surround
90' [27 432] Roof shown

32 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

Item Part No. Description


1 9-21663 Roof Handrail (Vertical) Post
2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace Tube
6 9-21667 Handrail Tube - MEDIUM 30°
13 U-24316 Bracket, Extension Rail Brace
18 39-20020 Nut, 5/16'' Hex 26
19 39-20155 Washer, 5/16'' Weatherseal
21 39-20152 Nut, Flange 5/16-18
22 39-20072 Bolt, Hex Head Bin Seal 5/16 x 1'' Gr. 8.2 13
23 39-20070 Bolt, Hex Head 5/16-18 x 1'' Gr. 8 27
33
24 9-53944 Plate, Eave Platform
25 4-24448 Post, Landing Platform Outer
26 4-24447 Post, Landing Platform Inner 78'' [1981.2] 25
27 4-24449 Kneebrace
28 9-32426 LEFT Bracket, Mounting Corr.
29 9-32427 RIGHT Bracket, Mounting Corr.
30 9-53943 Handrail, Eave Platform Front 67
31 4-24451 Handrail, Eave Platform SHORT
32 9-53946 Brace, Cross
33 9-53945 Brace, Platform Reinforcing
34 19-24922 CAUTION Decal
35 9-53629 Bracket, Manhole Guard
36 varies Tube, Ladder Rung
37 9-12831 90° Multipurpose Bracket
39 9-54366 Platform Spring Gate Assembly
51 9-42654 Tube, Ladder Extension Back Brace
52 9-42655 Tube, Ladder Extension Side Brace
53 U-00005 5' [1 524] Top Ladder Section
54 292878 Cage Channel 45'' [1 143] 29 28
55 9-23777 Hoop, Ladder Cage Half
56 9-32021 Cage Connector
57 U-23788 Bracket, Ladder Standoff LEFT
58 U-23789 Bracket, Ladder Standoff RIGHT 35
60 varies Roof Ladder Panel
61 varies Roof Manhole Panel
62 varies Roof Panel (Standard)
63 varies Sidewall Stiffener
64 Manhole and Lid 31
65 varies Ladder Rung here 34
66 varies Top Body Sheet Ring/Tier
67 U-23779 Ladder Locking Clip
68 39-20297 Bolt, Hex Head 5/16-18 x 3/4'' Gr. 5
52

39
51

30

32 Figure 21.
Eave Platform
Parts Identification

MLD2028B 33
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Additional Installations for 42' [12 802] and


48' [14 630] Diameter Farm Roofs

The Manhole Surround on 42' and 48' Farm Roofs requires an additional vertical
Post (Item 1) * to the right of the Manhole. Upper and Lower Surround Tubes
(Items 74 and 75) are sized specifically for these diameter models. See Fig. 22.
A large L-shaped, slotted Platform-to-Post Bracket (Item 35) is used to connect the
Eave Platform to the bottom vertical Post. On 42' and 48' Farm Roofs, the Bracket
is attached to the left side of the bottom Post. See Fig. 23 on facing page.

36
4
1

1 *

74

35
For the 42' and 48'
Handrail side diagram, 6
see page 17.
75

24

Figure 22.
Roof Handrail at Eave Platform and
Manhole Surround 48' [1 630] Diameter

34 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

Install Post-to-Post Bracket (Item 35) as shown in Figure 23 below. An additional


hole (one or more) will need to be field-drilled below the hole at the top of the Post.

TOP VIEW

1
24
75
21 26
23

35
23
21
26 39

23 FIELD
DRILL
21

Figure 23.
Detail, Platform Inner Post Connection to
Manhole Surround Bottom, 42' 35

Item Part No. Description


1 9-21663 Roof Handrail (Vertical) Post
2 9-21662 Handrail Post Mounting Bracket
4 9-21669 Handrail Kneebrace Tube
14 9-54343 Tube 42’-48’ BOTTOM
21 39-20152Nut, Flange 5/16-18
23 39-20070Bolt, Hex Head 5/16-18 x 1'' Gr. 8
24 9-53944 Plate, Eave Platform
26 4-24447 Post, Landing Platform Inner 78'' [1981.2]
35 9-53629 Bracket, Manhole Guard
60 varies Roof Ladder Panel
61 varies Roof Manhole Panel
62 varies Roof Panel (Standard)
64 Manhole and Lid
74 9-21666 Handrail Tube, SHORT
75 9-54344 Tube, Manhole Surround 42' and 48' LOWER

MLD2028B 35
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Eave Platform Spacing and Attachment to the Sidewall


IMPORTANT! Refer to your Roof Manual for proper installation of ALL Roof
components BEFORE an Eave Platform is installed. Use all Eave
Platform Brackets shown.
Attach LEFT and RIGHT Platform Mounting Brackets (Items 28 and 29) to the
TOP Sidewall Body Sheets as shown. Locate the Brackets vertically as shown in
Figure 25 on the facing page.
Align the first hole in the Mounting Bracket with the top row of Bolt holes in the top
Ring/Tier. Use 5/16 x 1" Bin Seal Bolts (Item 22) with the head inside and Washer
and Nut (Items 18 and 19) outside. This requires drilling holes on 14 ga. and lighter
Body Sheets. Body Sheets 13 Ga. and heavier have horizontal holes spaced 4 11/16"
[119] apart and do not require field drilling.
Attach the Crossbrace (Item 32) to the inside of each Platform Mounting Bracket
with 5/16 x 3/4" Hex Head Gr. 5 Bolts (Item 68) and Hex Nuts (Item 21). See Detail
B on page 38.
Attach the Inner Post (Item 26) to both LEFT/RIGHT Brackets as shown in Details
B and C on page 39.
Assemble the Platform Floor Plate (Item 24) and Platform Kneebraces (Item 27)
to the Inner Posts (Item 26).

61

32
60 64

59
24

53
66
27
27

28 29
B
A

.73'' [19]
A
Corr. Bracket LEFT-to-RIGHT holes, center to center
4.1'' [104]
B
Corr. Bracket holes to Ladder Bracket holes, center to center

Figure 24.
Eave Platform and Top Ladder
Aligned with Three (3) Roof Panels

36 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

Eave Platform Height


Platform Top Rails are 39.2'' [996] higher than the Eave. The Side Ladder must be even
with or higher than the Platform Top Rails, 39.2'' [996] to a maximum of 54'' [1 372]
above the Eave. See page 31.
The Side Ladder
must be even with 55
or higher than the
Platform Top
Rails, 39.2'' [996]
to a maximum of 6
54'' [1 372] above 1

39.2'' [996] to 54'' [1 372] max


the Eave.
39
Platform Top Rails are
39.2'' [996] higher
than the Eave.
39.2'' [996]

24

A
EAVE
59
EAVE

SIDE VIEW 22
18
55 53 29
19
27

66

Figure 25.
Eave Platform and Top Ladder-and-Cage
Section on Sidewall, Top Ring/Tier

Item Description Item Description


1 Roof Handrail Vertical Post 53 Top Ladder Section
6 Handrail Tube, Medium 30 55 Hoop, Ladder Cage Half
24 Platform Floor Plate 59 Eave
27 Kneebrace 60 Roof Ladder Panel
29 RIGHT Bracket, Mounting 61 Roof Manhole Panel
32 Brace, Cross 64 Manhole and Lid
39 Platform Spring Gate Assy. 66 Top Body Sheet Ring/Tier
MLD2028B 37
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Assembly
LONG and SHORT (Upper/Lower) Handrails (Items 30 and 31) are bolted to
vertical Posts with 5/16 x 1'' Hex Head Bolts and Flange Nuts (Items 21 and 23),
heads inside. OUTER Posts are shorter than INNER Posts, which bolt to the Bin
sidewall. Bolt the single, LEFT OUTER Post (Item 25) to the Handrails as shown in
Detail A. On the front right corner of the Platform, use a pair of OUTER Posts (Items
25/25). See Detail C.

24
21
23 31 30
66
21 68 21
21 32 23
21 23
30 23 25
26 28 25
25 26

Detail A Detail B Detail C

26
31
26 26 26

31 30
21 23

21
25 23
32
30
21
23

24
27 29
Floor Plate: Be sure the
lip turns UP at the
LEFT (closed) end of 21
the Floor Plate. 28 33
23
21 23
25 27
Connect all Posts to the Platform 25
Plate (Item 51) corners with the
same hardware.

Figure 26.
Floor Plate: Be sure the lip turns
Manhole Surround and Details DOWN at the RIGHT open/
Details on facing page Ladder side of the Platform.
38 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

26 26
25
25
26 26 33 24
30

39
21 23 66
25 31 Detail A 32
30

29
33
24

27 27
63
21 23
32
27

28 66

29
63
66

26 26
63
Detail B

Item Part No. Description


18 39-20020 Nut, 5/16'' Hex
19 39-20155 Washer, 5/16'' Weatherseal
26 26 21 39-20152 Nut, Flange 5/16-18
22 39-20072 Bolt, Hex Head Bin Seal 5/16 x 1'' Gr. 8.2
23 39-20070 Bolt, Hex Head 5/16-18 x 1'' Gr. 8
22 19 18 24 9-53944 Plate, Rest Platform
25 9-24448 Outer Post
27 26 4-24447 Post, Landing Platform Inner 78'' [1981.2]
27 4-24449 Kneebrace
29
28 9-32426 LEFT Bracket, Mounting Corr.
29 9-32427 RIGHT Bracket Mounting Corr
30 9-53943 Handrail, Eave Platform Front
21 23 66 31 4-24451 Handrail, Eave Platform SHORT
32 9-53946 Brace, Cross
Detail C 33 9-53945 Brace, Platform Reinforcing
39 9-53615 Platform Spring Gate Assembly
Figure 27. 63 varies Sidewall Stiffener
Eave Platform Underside
66 varies Top Body Sheet
68 39-20297 Bolt, Hex Head 5/16-18 x 3/4'' Gr. 5
MLD2028B 39
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Top Ladder-and-Cage Section


Connect the Top Ladder Section (Item 53) to the bin sidewall using LEFT and
RIGHT Top Ladder Standoff Brackets (Items 57/58) under the eave. See Figure 26
on page 37. Refer to your Outside Ladder Manual MLD1538 for Ladder-and-Cage
basic assembly and connections to the Bin sidewall.
The Cage is begun by attaching a Hoop Half (Item 55) to the outside right edge of
the top Ladder (Item 53) with a Locking Clip Assembly (Item 13).

57 58 59
53

13

Item Part No. Description


54 67 13 U-23779 Ladder Locking Clip Assembly
51 9-42654 Tube, Ladder Extension Back Brace
52 9-42655 Tube, Ladder Extension Side Brace
56 53 U-00005 5' [1 524] Top Ladder Section
54 292878 Cage Channel 45'' [1 143]
55 9-23777 Hoop, Ladder Cage Half
56 9-32021 Cage Connector
57 U-23788 Bracket, Ladder Standoff LEFT
58 U-23789 Bracket, Ladder Standoff RIGHT
59 U-23778 Bracket, Ladder Standoff
67 U-24316 Extension Rail Brace Bracket
55

52 Figure 28.
Parts Identification
51

Cage to Platform Connection


The top Hoop Half connects to the Eave Platform OUTER Post (Item 25) with a Cage
Connector (Item 56) as shown in Figure 29 on the facing page. The next Hoop down
is a full Hoop made with two (2) Hoop Halves. This Hoop also connects to the front
of the Eave OUTER Post with a Cage Connector. Use the 5/16 x 1'' Bolts and Flange
Nuts (Items 21 and 23) on the Platform vertical Post connections.
Top Ladder Section Bracing to the Roof
Bolt the flatter ends of two (2) Ladder Back Brace Tubes (Item 51) to the top of the
Ladder Section as shown in Detail C on the facing page.
Bolt the single Ladder Side Brace Tube (Item 52) to the Ladder Section as shown in
Detail E on the facing page.
Secure tops ends of Braces with a Flange Nut (Item 21) on a Brace Bracket (Item 67)
and Locking Clip (Item 13) as shown in Detail F.
Bottom ends of Back Braces will connect to a Roof rib.
The Bottom end of the Side Brace will connect to the Roof panel near the eave; field
drill if necessary.
To connect Brace bottom ends to the Roof, use a 5/16 x 1'' HHBS Bolt (Item 22) on
top, with a Weatherseal Washer (Item 19) between the Brace and Roof/rib, and a Hex
Nut (Item 18) under the Rib. See Detail D on the facing page.
40 MLD2028B
MLD2028B

BROCK® Roof Handrail, 30° Roof


Detail A

39 21
30 56 56

51 67
21 51 13
23 53
51 Back Brace Detail C
33
25 25
22
Detail B
56 54 35 19
51 18
51 52
24 54

55 Brace-Rib Detail D

21 55
53
21

Eave Platform and Manhole Surround


23
13
56 67
Item Part No. Hardware Description Figure 29.
18 39-20020 Nut, Hex 5/16''-18 Top Ladder-and-Cage Section
19 39-20155 Washer, Weatherseal 5/16'' Connection and Bracing Details
(Item Table on facing page) 53 52
21 39-20152 Nut, Flange 5/16''-18 53
Detail F
22 39-20072 Bolt, HHBS 5/16-18 x 1'' Gr. 8.2 Side Brace
23 39-20070 Bolt, Hex Head 5/16'' x 1'' Gr. 8 Detail E
13 67
41
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Manhole Surround
IMPORTANT! 42' and 48' Dia. Bins require an extra Post and different Handrails. See Pages 34
and 35.
Build the right side of the Manhole Surround. Use two (2) 90° Multipurpose
Brackets (Item 37) to attach the bottom ends of two (2) Vertical Posts (Item 1) to the
Roof rib. See Detail A.
Attach a Kneebrace (Item 4) to the back of the upper right Post (Item 1) and to the
Bin roof. See Details B and C on facing page.
Between the righthand Posts, attach an upper and lower Medium Handrail Tube
(Item 6). See Detail D on facing page.
Close the back (Fillhole) end of the Surround with a Ladder Rung Tube (Item 36)
connected between the tops of the Vertical Posts.

22
19
18 1
1
23 21
4
6
36
6 37
Detail A
37

37

Figure 30.
Eave Platform and Manhole Surround
Item table on facing page
42 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

36

21
37
1 23
6

4 Item Part No. Description


1 9-21663 Roof Handrail (Vertical) Post
4 9-21669 Handrail Kneebrace Tube
6 9-21667 Handrail Tube - MEDIUM 30°
21 39-20152 Nut, Flange 5/16-18
23 39-20070 Bolt, Hex Head 5/16-18 x 1'' Gr. 8
*36 varies Tube, Ladder Rung
37 9-12831 90° Multipurpose Bracket
*included with other Roof Ladder Rungs. For each
model, this will be the Rung for this typical height
position in the Ladder Panel to the left. Refer to your
Roof Manual for your diameter Roof for specific Rung
lengths and Part Numbers.
Figure 31.
Manhole Surround Parts Identification

Detail B Detail D
22 23
19 21
18 1
23 21 6

4 1
4 37
1
Detail C

Assemble and Install the Spring Gate to the Platform


Locate and follow instructions in the Spring Gate
Supplement, MLD2027.

Figure 32.
Spring Gate Manual MLD027

MLD2028B 43
Eave Platform and Manhole Surround BROCK® Roof Handrail, 30° Roof

Connect the Eave Platform to the Manhole Surround-


Stairway Bottom
Install the Spring Gate to the Platform. See the previous page.
IMPORTANT! 42' and 48' Dia. Bins require a different connection. See Pages 34 and 35.
Locate the Manhole Guarding Angle (Item 35). Using 5/16'' x 1'' Hex Head Bolts and
Flange Nuts (Items 21 and 23), attach the Angle to the Eave Platform Inner Post
(Item 26) in the Post top hole. Attach the other Angle flange to the Post (Item 1) on
the right eave side of the Manhole Surround.

FRONT VIEW
26 26

39
35

OUTSIDE TOP VIEW

39

39
53

21 1
23 35

53
Item Part No. Description
21
1 9-21491 Stairway Post
21 39-20152 Nut, Flange 5/16'' 26 23
26
23 39-20070 Bolt, Hex Head 5/16'' x 1''
26 9-24447 Platform Inner Post
35 9-53629 Manhole Guarding Angle Figure 33.
39 9-54366 Spring Gate Assembly Connection Detail, Manhole Guarding Angle to Platform
53 U-00005 Top Ladder Back Post Pair and Stairway Vertical Post

44 MLD2028B
BROCK® Roof Handrail, 30° Roof Eave Platform and Manhole Surround

This page left intentionally blank for your convenience.

MLD2028B 45
MLD2028B

BROCK® Roof Handrail, 30° Roof


Parts Chart for 30° Roof Handrail

Roof Handrail with Eave Platform and Manhole Surround


Farm Roof Commercial Roof
Item Part No. Description Dimensions 18' 21' 24' 27' 30' 33' 36' 42' 48' 48 54' 60' 72' 75' 78' 90' 105' 132' 156'
1 9-21663 Handrail Post 35 3/4'' x 6'' w 8 8 10 10 12 12 12 12 14 14 16 14 18 18 18 22 26 32 38
2 9-21662 Handrail Post Mounting Bracket 3 3/16'' x 6 1/2'' w 3 3 4 4 5 5 5 5 6 6 7 6 8 8 8 10 12 15 18
4 9-21669 Handrail Kneebrace 31 11/16'' x 1 1/4'' dia. 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
5 9-21666 Handrail Tube - SHORT 30° 21 13/16'' [554] 4 4 4 4 4 4 4 4 4
6 9-21667 Handrail Tube - MEDIUM 30° 42 15/32'' [1 079] 6 10 10 6 14 10 6 10 6 10 6 6 6 10 6 14 14 14 18
7 9-21668 Handrail Tube - LONG 30° 63 5/32'' [1 604] 4 4 8 8 12 12 16 16 20 20 24 24 28 40 48
8 9-15626 Tube INSIDE 1.163'' Dia. x 16'' [406] 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
9 9-26191 Tube OUTSIDE 1 1/4'' Dia. x 72'' [1 829] 4 4
10 9-26196 Tube OUTSIDE 1 1/4'' x 36'' [914] 4 4 4 4 4 4 4 4
12 9-26337 Tube OUTSIDE 1 1/4'' Dia. x 22'' [559] 4 4 4 4 4 4 4 4 4
13 U-23779 Ladder Locking Clip Assembly 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
14 9-54343 Tube 42'-48' BOTTOM 2 2
9-24818 41 5/8'' [1 057] 8 6 8 8 10 13 10 14 11 13
15* Fillhole Platform Post
9-22517 57 3/4'' [1467] 7 7 7 7 7 7 7 7 7
9-24821 52 5/8'' [1 337] 8 6 8 8
16* 9-25119 Kneebrace 1 3/16'' Ø 53 7/8'' [1 368] 10 13 10 11 13
9-37849 53 3/32'' [1 349] 14
Handrail Tube -
17 9-38103 64.737'' O.A. [1 679] 4 4 4
LONG 30° (105', 132', 156')
18 39-20020 5/16'' Hex Nut 51 51 59 59 67 67 67 67 75 75 83 75 91 91 91 107 123 147 171
19 39-20155 5/16'' Weatherseal Washer 6 6 8 8 10 10 10 10 12 12 14 12 16 16 16 20 24 30 36
20 39-20126 3/4'' Self-Drilling Screw 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
21 39-20152 5/16'' Flange Nut

Parts Chart for 30° Roof Handrail


22 39-20072 Bolt, Hex Head B.S. 5/16 x 3/4'' Gr. 8.2 47 47 55 55 63 63 63 63 71 71 79 71 87 87 87 103 119 143 167
23* 39-20070 Bolt, Hex Head B.S. 5/16 x 1'' Gr. 8 varies
*These items shipped with other Kits.
35 9-54076 Bracket, Manhole Guard 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
37 9-12831 90° Multipurpose Bracket 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
9-54375 Eave Platform Assembly 30'' x 64'' [762 x 1625.6] 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
53 U-00005 Top 5' Ladder Section w/ Cage 5' [1 572] 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
46
BROCK® Roof Handrail, 30° Roof Parts Chart for 30° Roof Handrail

Eave Platform Assembly 9-54375


Item Part No. Description Qty.
21 39-20152 Nut Flange 5/16''-18 45
23 39-20070 Bolt, HHTP 5/16-18 x 1'' Gr. 8 45
24 9-53944 Plate, Rest Platform 30'' x 64''
9-37747 Package, Eave Platform w/o P 1
25 4-24448 Post, Eave Platform Outer 3
26 4-24447 Post, Eave Platform Inner 2
27 4-24449 Brace, Eave Platform Kneebrace 2
28 9-32426 Bracket, Platform Mounting Corr LEFT 1
29 9-32427 Bracket, Platform Mounting Corr RIGHT 1
30 9-53943 Handrail, Eave Platform Front 2
31 4-24451 Handrail, Eave Platform SHORT 2
32 9-53946 Brace, Eave Platform Cross 1
33 9-53945 Brace, Platform Reinforcing 1
36 varies Tube, Ladder Rung 1
56 9-32031 Connector, Eave Platform Cage 2
71 39-20058 Washer, 5/16'' .0003 ZC 4
MLD2026 Instruction, Platform (Flat-Bottom Bins) 1
MLD2030 Instruction, Platform CHB Supplement 1
MLD2027 Instruction, Spring Gate Supplement 1
9-32368 Bag, Hardware Eave Platform Corr 1
39-20114 Nut, Hex 3/8''-16 .0003 ZY (Bin Hardware) 4
39-20323 Bolt, HHBS 3/8-16 x 1 1/2'' Gr. 8 (Bin Hardware) 4

30° Handrail Complete


Farm Roof Commercial Roof
Roof Dia. Part No. Roof Dia. Part No.
18' 9-54638 48' 9-54647
21' 9-54639 54' 9-54648
24' 9-54640 60' 9-54649
27' 9-54641 72' 9-54650
30' 9-54642 75' 9-54651
33' 9-54643 78' 9-54652
36' 9-54644 90' 9-54653
42' 9-54645 105' 9-54654
48' 9-54646 132' 9-54655
156' 9-54656

MLD2028B 47
Different by Design™
BROCK GRAIN SYSTEMS
A Division of CTB Inc.
P.O. Box 2000 • Milford, Indiana 46542-2000 • U.S.A.
Phone (574) 658-4191 • Fax (574) 658-4133
e-mail: brock@brockgrain.com • Internet: http://www.brockgrain.com
and
1750 W. State Road 28 • Frankfort IN 46041
Phone (765) 654-8517 • Fax (765) 654-8510
Toll Free (800) 541-7900
e-mail: dryers@graindryers.com • Internet: www.ctbworld.com or www.graindryers.com
and
7400 East Thirteenth Street • Kansas City, Missouri 64126 • U.S.A.
Phone (816) 968-6101
Fax (816) 968-6272 TLX: 6841105
Printed in the U.S.A.
In the pursuit of LEADERSHIP THROUGH INNOVATION®, Brock Grain Systems reserves the right
to change specifications without prior notice.

All specifications subject to change without notice.


Changes this issue:
An Eave Platform package is now standard with the Roof Handrail. A Manhole Surround and Top Side Ladder section
are standard with the Eave Platform package. Part Numbers changed for the Roof Handrail Complete.
Eave Platform Top Rails are 39.2'' [996] higher than the Eave. Where the Eave Platform Floor was formerly located at the
top horizontal seam (one Body Sheet Ring/Tier down from the Eave), the Floor is now installed level with the eave (same
height).
The Top Side Ladder section is now located to the right of the Eave Platform. It was formerly to the left of an Eave Platform.
Ladder Extension Rails (which formerly extended above the Eave for the Top Ladder section), have been discontinued. The
top Cage Hoop attaches directly to this Ladder Rail. The top of this Ladder section must be even with or higher than the
Platform Top Rails, 39.2'' [996] to a maximum of 54'' [1 372] above the eave.
There is a supplement MLD2027 to this Manual, for the Spring Gate assembly required between the Eave Platform and the
Top Ladder section.
Changes at the eave and Bottom Step: Handrail Bracing and Roof Ladder Rung locations have changed. Handrail Posts have
been added at the eave. The Grabrail has been discontinued.
The Roof Stiffener Ring has been discontinued on some larger Structural Roofs. It is shown in this Manual for retrofit on
existing Roofs pre-2013.
This Manual was formerly MLD1365H.
The Roof Stairway Manual changed from MLD1367H to MLD2029A.
The Flat-Bottom Platform Manual changed from MLD1352 to MLD2026.
The Commercial Hopper Bin Platform Manual changed from MLD1951 to MLD2030.
The Fillhole Platform (9-22600) Manual for 15' - 48' [4 572 - 14 630] Diameter Roofs changed from MCB1395 to MLD1395.
Changes last issue:
The 132' [40 234] Roof Handrail was added. There were miscellaneous additions.

April 2013 MLD2028B

You might also like