Table of Contents
Review & Endorsement Records .............................................................................................. 2
Revision Log Register ............................................................................................................... 3
Table of Contents...................................................................................................................... 4
Table of Figures ........................................................................................................................ 4
1. Introduction .......................................................................................................................... 5
1.1 Background .................................................................................................................. 5
1.2 Objectives .................................................................................................................... 5
1.3 Scope ........................................................................................................................... 5
1.4 Associated Documents ................................................................................................ 5
1.5 Pipeline Reference....................................................................................................... 6
1.6 Abbreviation ................................................................................................................. 6
2. References ........................................................................................................................... 7
2.1 Applicable Code & Standards ...................................................................................... 7
2.2 Company Document .................................................................................................... 7
2.3 Project Document ........................................................................................................ 7
3. Pipeline Design Parameter .................................................................................................. 8
3.1 Pipeline design life ....................................................................................................... 8
3.2 Pressure and Temperature .......................................................................................... 8
3.3 Pipeline and Riser Mechanical Properties ................................................................... 8
3.4 Fluid Data..................................................................................................................... 9
3.5 Corrosion Allowance .................................................................................................... 9
3.6 Offshore Environmental Parameter ............................................................................. 9
3.6.1 Water Depth ...................................................................................................... 9
3.6.2 Tidal Range ....................................................................................................... 9
3.6.3 Seawater Properties ........................................................................................10
3.6.4 Wave Parameters ............................................................................................10
3.6.5 Current Data ....................................................................................................10
3.6.6 Soil Parameters ...............................................................................................10
4. Design Criteria and Methodology ....................................................................................... 11
4.1 Internal Pressure Containment .................................................................................. 11
4.2 Collapse due to External Pressure ............................................................................ 11
4.3 Buckling due to Combined Bending and External Pressure ...................................... 12
4.4 Propagation Buckling ................................................................................................. 12
4.5 Pipeline design factor................................................................................................. 12
5. Results and Conclusions ................................................................................................... 13
5.1 Calculation Results .................................................................................................... 13
5.2 Conclusions ............................................................................................................... 13
6. Appendices ........................................................................................................................ 14
Appendix A. Wall Thickness Calc. – Pipeline (Zone 1) ........................................................... 15
Appendix B. Wall Thickness Calc. – Riser (Zone 2) ............................................................... 16
Table of Figures
Figure 1.UL Field Location ......................................................................................................... 5
1. Introduction
1.1 Background
PT. Timas Suplindo and PT Bakrie Construction consortium has been nominated by PHE-
ONWJ to perform onshore and offshore works including Detailed Engineering, Procurement,
Construction, Installation and Commissioning of the UL Development Project.
The UL field is located within the Uniform fields approximately 6.1 km North-West of the
existing UW platform and 14 km West of the existing UPRO platform. The figure below shows
the location of the UL field:
UL
The new UL field is a gas and oil reserve and will require facilities and pipelines for gathering,
subsequent export and processing with initial rate of 2200 BOPD and 10 MMSCFD. The new
development facility is required to sustain oil and gas production of PHE ONWJ which is
scheduled to be on-stream by first quarter of 2014.
1.2 Objectives
The objective of this document is to determine nominal wall thickness and material grade
selected for 12 Inch subsea pipeline from ULA to UW as a part of UL Field Development. The
minimum wall thickness required for pressure containment, external collapse and propagation
buckling is calculated in accordance with ASME B31.4 and API 1111.
1.3 Scope
The scope of this report is 12 Inch ULA-UW pipeline for both pipeline zone 1 and pipeline
zone 2 including riser.
Pipeline OD
Description Origin Termination Service
(mm)
12-inch submarine
323.9 ULA UW Three phase fluid
pipeline
1.6 Abbreviation
CA Corrosion Allowance
ERW Electric Resistance Welding
HAT Highest Astronomical Tide
LAT Lowest Astronomical Tide
LRFD Load Resistance Factor Design
MSL Mean Sea Level
NPS Nominal Pipe Size
PHE ONWJ Pertamina Hulu Energi Offshore North West Java
SMTS Specified Maximum Tensile Strength
SMLS Seamless
SMYS Specified Minimum Yield Strength.
2. References
Internal Corrosion
Location Remarks
Allowance (mm)
All section pipeline/Riser 3.0 Note 1
Note:
1. The internal corrosion allowance is based on Chemical Injection Requirement Study Report [Ref 2.3.(5)].
Return Period
Item Units
1-Year 100-Year
Storm Tide (Surge) m 0.152 0.244
Highest Astronomical Tide (HAT) m 1.158 1.158
Current velocity
Return Period
(m/s)
1-year 0.366
100-years 0.518
The corresponding nominal wall thickness is calculated with considering the corrosion
allowance.
The hoop stress due to difference between internal and external pressure shall not exceed
the value below:
S h F1 S
P Pe D
Sh i
2 tm
tr tm C A
Where:
Sh = Hoop stress
Pi = Internal design pressure
Pe = External pressure
D = Pipe outside diameter
S = Specified minimum yield strength, SMYS
F1 = Design factor, table A402.3.5 of ASME B31.4
tr = Required wall thickness
tm = Pressure design minimum wall thickness
CA = Corrosion allowance
( Po Pi ) f o Pc
t
Py 2 S n
D
3
tn
Px 2 E 2
D
1
Where:
fo = Collapse factor ( 0.70 for ERW pipe and 0.60 for DSAW pipe)
( Po Pi )
g ( )
b Pc
Where:
ε = bending strain in the pipe
εb = buckling strain under pure bending
Po = external Pressure (psi)
Pi = internal Pressure (psi)
g(δ) = collapse reduction factor
Po Pi f p Pp
2.4
t
Pp 24 S n
D
Where:
fp = propagating buckle design factor = 0.8
Pp = buckle propagation pressure (psi)
PIPELINE RISER
(ZONE 1) (ZONE 2)
Wall Thickness (mm) (mm)
Installation Operating Installation Operating
Required Thickness excluding the Allowance:
- Internal Pressure Containment 6.94 6.94 6.94 8.33
- Hydrostatic Collapse 3.32 3.32
- Buckling Propagation 5.20 5.20
- Buckling due to combined bending
4.69 4.69
and external pressure
Allowance:
- Corrosion Allowance 0.0 3.0 0.0 3.0
- Mill Tolerance 0.70 0.70
- Construction Allowance 0.8 0.8
Minimum Required Wall Thickness 8.44 11.44 8.44 12.83
Wall Thickness Selected 12.70 14.27
The pipeline wall thickness selected is also checked for buckling caused by combined
bending and external collapse and calculation also show the inequality check is satisfied for
installation and operating condition.
The full detailed calculation & results are contained in attachment of this report
5.2 Conclusions
Based on the calculation results, which are summarized in Table 14 above, the selected
nominal wall thickness that required for 12” NPS Subsea Pipeline are shown in table below:
6. Appendices
Appendix – A : Wall Thickness Calculation – Pipeline (Zone 1)
Appendix – B : Wall Thickness Calculation – Riser (Zone 2)
DATA INPUT
Pipe Data
5
Young's Modulus E1 := 2.07 10 MPa Poisson's Ratio ν := 0.3
Environmental Data
kg
Seawater Density ρseawater := 1025
3
m
LAT refer to CD LAT := 0.5m HAT refer to CD HAT := 1.158m
Min. Water Depth Wd min := 22.8m Max. Water Depth refer to Wd max := 26.70m
refer to CD CD - (UNIFORM-G-DBS-0001)
Maximum Wave Height Hmax_1yr := 5.09m Maximum Wave Height Hmax_100yr := 8.63m
(1 year RP - (100 years RP -
UNIFORM-G-DBS-0001) UNIFORM-G-DBS-0001)
1 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Pipeline Zone-1
Design Factor
Pressure Calculation
2
Max. Water Depth (1 year RP) dmax_1yr := Wd max + HAT + surge_1yr + Hmax_1yr
3
dmax_1yr = 31.4 m
2
Max. Water Depth (100 year RP) dmax_100yr := Wdmax + HAT + surge_100yr + Hmax_100yr
3
dmax_100yr = 33.86 m
Min. External Pressure at at Wdmin Po_min := Wd min ρseawater g Po_min = 0.2 MPa
Hmax_100yr
Min. External Pressure at at Wdmax Po_max := Wd max - ρseawater g Po_max = 0.2 MPa
2
(
Internal Pressure During Operation Pi_wdmax := Pd + ρmax g EL DP + Wd max ) Pi_wdmax = 11.3 MPa
at Wdmax
(
Internal Pressure During Operation Pi_wdmin := Pd + ρmax g EL DP + Wd min ) Pi_wdmin = 11.3 MPa
at Wdmin
2 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Pipeline Zone-1
Hydrotest Pressure at ( )
Pdh_wdmax := Phydro + ρseawater g ELDP + Wdmax Pdh_wdmax = 14.2 MPa
Wd max
Hydrotest Pressure at ( )
Pdh_wdmin := Phydro + ρseawater g ELDP + Wdmin Pdh_wdmin = 14.1 MPa
Wd min
Pressure Calculation
Pressure Containment
PD dh OD
Required Wall Thickness for thydr := thydr = 6.94 mm
Pressure Containment - Hydrotest 2 SMYS fh
(A402.3.5)
Pressure Containment
Hydrostatic Collapse
tco
Yield pressure ( )
Py tco := 2 SMYS
OD
3
tco
OD
Elastic critical pressure ( )
Pe tco := 2 E1
( 1 - ν 2)
( )
Py tco Pe tco ( )
Collapse pressure ( )
Pc tco :=
(
Py tco ) 2 + Pe ( tco) 2
Required wall thickness ( ( )
tcoll := root Pc tco fo - Po_100 , tco ) tcoll = 3.31 mm
Hydrostatic Collapse
3 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Pipeline Zone-1
Propagating Buckling
Propagating Buckling
t
Buckling Strain Under Pure εb ( t) :=
2 OD
( )
εb tbuck = 0.2 %
Bending
-1
Collapse Reduction gδ := ( 1 + 20 δ) gδ = 0.77
Factor
4 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Pipeline Zone-1
(
max 3.7 mm , 0.1 tnom ) otherwise
if Mf = "welded HFW/ERW"
0.4 mm if tnom 6 mm
1.0 mm otherwise
"check" otherwise
tmill = 0.70 mm
5 of 5
PT. PHE ONWJ Pipeline Wall Thickness Calculation
DATA INPUT
Pipe Data
5
Young's Modulus E1 := 2.07 10 MPa Poisson's Ratio ν := 0.3
Environmental Data
kg
Seawater Density ρseawater := 1025
3
m
LAT refer to CD LAT := 0.5m HAT refer to CD HAT := 1.158m
Min. Water Depth Wd min := 22.6m Max. Water Depth refer to Wd max := 26.80m
refer to CD CD - (UNIFORM-G-DBS-0001)
Maximum Wave Height Hmax_1yr := 5.09m Maximum Wave Height Hmax_100yr := 8.63m
(1 year RP - (100 years RP -
UNIFORM-G-DBS-0001) UNIFORM-G-DBS-0001)
1 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Riser/Pipeline Zone-2
Design Factor
Pressure Calculation
2
Max. Water Depth (1 year RP) dmax_1yr := Wd max + HAT + surge_1yr + Hmax_1yr
3
dmax_1yr = 31.5 m
2
Max. Water Depth (100 year RP) dmax_100yr := Wdmax + HAT + surge_100yr + Hmax_100yr
3
dmax_100yr = 33.96 m
Min. External Pressure at at Wdmin Po_min := Wd min ρseawater g Po_min = 0.2 MPa
Hmax_100yr
Min. External Pressure at at Wdmax Po_max := Wd max - ρseawater g Po_max = 0.2 MPa
2
(
Internal Pressure During Operation Pi_wdmax := Pd + ρmax g EL DP + Wd max ) Pi_wdmax = 11.3 MPa
at Wdmax
(
Internal Pressure During Operation Pi_wdmin := Pd + ρmax g EL DP + Wd min ) Pi_wdmin = 11.3 MPa
at Wdmin
2 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Riser/Pipeline Zone-2
Hydrotest Pressure at ( )
Pdh_wdmax := Phydro + ρseawater g ELDP + Wdmax Pdh_wdmax = 14.2 MPa
Wd max
Hydrotest Pressure at ( )
Pdh_wdmin := Phydro + ρseawater g ELDP + Wdmin Pdh_wdmin = 14.1 MPa
Wd min
Pressure Calculation
Pressure Containment
PD dh OD
Required Wall Thickness for thydr := thydr = 6.94 mm
Pressure Containment - Hydrotest 2 SMYS fh
(A402.3.5)
Pressure Containment
Hydrostatic Collapse
tco
Yield pressure ( )
Py tco := 2 SMYS
OD
3
tco
OD
Elastic critical pressure ( )
Pe tco := 2 E1
( 1 - ν 2)
( )
Py tco Pe tco ( )
Collapse pressure ( )
Pc tco :=
(
Py tco ) 2 + Pe ( tco) 2
Required wall thickness ( ( )
tcoll := root Pc tco fo - Po_100 , tco ) tcoll = 3.32 mm
Hydrostatic Collapse
3 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Riser/Pipeline Zone-2
Propagating Buckling
Propagating Buckling
t
Buckling Strain Under Pure εb ( t) :=
2 OD
( )
εb tbuck = 0.2 %
Bending
-1
Collapse Reduction gδ := ( 1 + 20 δ) gδ = 0.77
Factor
4 of 5
Project : EPCI for UL Development Project Prepared by: AFR/IM
Company : PT. PHE ONWJ Checked by: AB
Contractor : PT. TIMAS-PT BAKRIE CONSORTIUM Approved by: MB/RB
Subject : 12" ULA-UW Pipeline Wall Thickness Calculation
Case : Riser/Pipeline Zone-2
(
max 3.7 mm , 0.1 tnom ) otherwise
if Mf = "welded HFW/ERW"
0.4 mm if tnom 6 mm
1.0 mm otherwise
"check" otherwise
tmill = 0.70 mm
tconst := 0.8mm
Construction Allowance
API STD 1104
5 of 5