1.
2.
2.1 Full wave lightning impulse test (LI) on HV, LV and TERT line terminals;
2.2 Applied voltage test (AV) on HV, LV and TERT side;
2.3 Induced voltage test with partial discharge measurement (IVPD);
2.4 Dissolved gas in oil analysis (DGA);
3.
3.1 Heat run test HV/LV, 31.5MVA and 40MVA (with 25% redundant cooling equipment
not operating);
3.2 Cooling system power consumption;
3.3 Dissolved gas in oil analysis (DGA);
3.4 Noise level measurement ONAN/ONAF;
3.5 Tank vibration measurement;
3.6 Frequency response analysis test (FRA).
Note(s): 3.1, 3.2, 3.4 and 3.5 only to be performed on the first unit.