The purpose of this initial operational check is to: insure that the engine has been assembled
properly; determine if proper pressures and temperatures are maintained in the lubrication, cooling,
and fuel systems; correct any leaks; perform necessary adjustments (such as valve clearance,
governor high and low idle speeds, etc.); check the set point.
To provide a safe, uniform initial operational check, the following procedure is recommended:
3. Operate engine for 15 minutes at half-load and 3/4 rated engine speed.