1.Introduction.Objective ,scope ,purpose of the project to be mention separately. 2.HIP description. 3.Table Of content 3.Hazard classification A,B,C must include in the Activity 4.Activity should be added - Blasting and painting, Chemical handling and storage, Communication and emergency response, Dust control, work at height ,Scaffolding, Fire prevention and firefighting, FA/Medical facility, Heat Stress, Heavy equipment operation, Housekeeping, H2S,Hydrotesting,NDT ( ionizing radiation, Material handling, Steel erection. 5.If any demolition activity please specify. 6.Pipe line cleaning 7.Precommissioning and commissioning. 8.House keeping 9.PPE hazard Assessment chart