UPGRADATION OF KHULNA 150 MW PPP TO 225 MW CCPP PROJECT
Comment Sheet
Our Transmittal Ref: [ 3114007/31/08(071) Date: | 2014.08.11
EPC Transmittal Ref: Date: | 2014.03.23,
Doc/Dwg, RefNo: | 351-F248C-S01-06 Rev: [0
Doc./Dwe Layout of C.W pump shed
Reference PMC’s Comments
i | GENERAL 1) The location of CW pump house structure shall not interfere /block the flow of free cool a
tower. Hence it shall be relocated in order to allow free flow of cool ait in to cooling tower.
2) Cooling water pump house structure shall be concrete for weather protection.
3)_S8_Wire mesh screen shall be added for the intake pipe
EPC comments dD
(1) As we know, cooling tower with one side air intake is often used in many projects. In order to reduce the influence
to the cooling tower, the C.W pump shed is design in this project. According to the calculation of cooling tower
‘manufacturers, the cooling tower nearby the C.W pump shed can meet the cooling requirements. The detail heat
exchange calculation will be provided at detail design stage.
(2) For the weather protection, the C.W pump, motor, and other equipments with outdoor protection grade are
installed in the C.W pump shed
(3) As we know, there are some shed-type buildings in the simple cycle power plant, such as fuel oil pump shed,
2) See the above reply.
3) Agree.
‘Conclusion! 1) Referto plot pan.
2). Refer to plot civil.
3) Agreed.
e
Jyer-rork
Page 1of |