You are on page 1of 1
UPGRADATION OF KHULNA 150 MW PPP TO 225 MW CCPP PROJECT Comment Sheet Our Transmittal Ref: | 3114007/31/08(067) Date: [ 2014.04.11 EPC Transmittal Ref: Date: | 2014.03.23 Doc./Dwg. Ref. No. 351-F248C-S01-02 Rev: 0 Doc./Dwg Title: Diagram Of Water Balance Reference PMC’s Comments ] 1 | GENERAL 1) The water from Raw water pool to water treatment can be indicated as WATER REATMENT PLANT instead of CHEMICAL WATER. 2) Explain the concentration of circulating water indicated as 3.5, 3) EPC shall provide calculations to justify potable water could be branched from the exiting open eycle water system for quantity and for head availability. EPC comments. 1) Agree 2) According tothe river water quality report provided by owner , the chloride solubility of raw water is about 200-250 ‘mg/L between March to May . The material of condenser cooling water pipe and the main flow components of C.W pump is stainless steel, it can endure the chloride solubility is 1000 mg/L. So the concentration ratio of circulating, water is 100/250 = 4. In this project it is <4.0. 3)_Please see to “Design calculations for potable water” ‘Conclusion: 1) Agreed. 2) Acceptable. 3) Received and to review. dath—eeef Page of 1

You might also like