fixtures/fittings in the
Cargo or ballast
hazardous area
heating coils in a
workshop
Work on
plating)
Minimum
rooms
tanks
Requirements
cargo tank
Work planning
meeting to be held
and risk assessment
completed ü ü ü ü ü ü ü ü ü
Work in designated
space with shield or ü
curtain erected
Adequate ventilation
ü ü ü ü ü ü
Confirmation from
Master or designate ü
that work is OK to
proceed
Tank atmosphere
checks carried out ü ü ü
and entry permit
issued
Tank to be washed
and gas freed ü ü ü
Cargo tanks to be
purged and inerted to
ü ü ü ü ü
not more than 8% O2
and not more than
2% HC
Work to be carried
out further than 500
mm from the tank
deck or bulkheads ü ü ü
Work to be carried
out more than 500
mm from a fuel oil
tank deck or
bulkheads
ü ü ü ü
Local cleaning to be
carried out as per ü ü ü ü
requirements
All interconnecting
pipelines flushed and ü ü ü
drained
Tank valves isolated
ü ü ü
Hot Work permit to
be issued on board ü
Hot Work permit
issued in agreement ü ü ü ü ü ü ü
with Company
Hot Work permit
approved by Master ü ü ü ü ü ü ü ü
or Responsible
Officer
Can the task be achieved HOT WORK NOT
Yes PERMITTED!
without using Hot Work?
No
Yes