The Risk Priority Number is a measure of design risk calculated by multiplying the rankings of a design's Severity, Occurrence, and Detection, with the resulting number ranging from 1 to 1000 and used to prioritize concerns, with a higher focus on designs with high Severity rankings.
The Risk Priority Number is a measure of design risk calculated by multiplying the rankings of a design's Severity, Occurrence, and Detection, with the resulting number ranging from 1 to 1000 and used to prioritize concerns, with a higher focus on designs with high Severity rankings.
The Risk Priority Number is a measure of design risk calculated by multiplying the rankings of a design's Severity, Occurrence, and Detection, with the resulting number ranging from 1 to 1000 and used to prioritize concerns, with a higher focus on designs with high Severity rankings.
• Risk Priority Number is the product of Severity (S), Occurrence (O) and Detection (D) ranking • This is a measure of design risk • This value should be used to rank order the concerns in design (Pareto) • RPN will be between 1 and 1000 • In general, regardless of RPN, special attention when Severity is high 18