Measures for
Four/Six Lane
National Highways
Sudeshna Mitra
Associate Professor
Civil Engineering Department
IIT Kharagpur
National Highways in West
Bengal
2
Multilane Highways
5
Accessibility vs Mobility
6
Where does mobility conflict
with accessibility?
▪ Access points- driveways, intersections,
median openings, activities located
along the highway
▪ Primarily locations that generate high
pedestrian and bicyclist traffic
▪ Bus bays
▪ Schools
▪ Nearby villages
7
Access points- Driveways;
Junctions
8
Goals of Access Management
▪ Limit number of conflict points
through traffic
9
Safety v. Access Points &
Median Type
10
Goals of Access Management
▪ Increased Capacity
11
Goals of Access Management
▪ Increased Capacity
12
ROAD SAFETY AUDIT: Different
Stages
▪ Feasibility Stage
▪ Preliminary/ Draft Design
Stage
▪ Detailed Design Stage
▪ During Construction
▪ Pre-opening Stage
▪ Existing Roads
The early we take RSA the
better the countermeasure. The
constraints increase as we
move from Feasibility Stage to
Existing Roads.
13
ROAD SAFETY AUDIT:
Detailed Design
Stage
▪ Geometrics
▪ Intersection Details
▪ Safe Crossing Facility
▪ Signs and Markings
▪ Lightings (urban sections)
▪ Roadside Appurtenances
Unauthorised Openings -
Safety Issues
Illegal opening
15
Unauthorised Openings -
Safety Issues
Illegal opening
16
Illegal Openings and
Crossings
17
Illegal Openings and
Crossings
20
Issues at untreated openings
21
Median Opening-Safety Issues
22
Median Opening-Safety Issues
23
Median Opening-Safety Issues
24
Issues at Major Junctions
25
Issues at Major Junctions
(contd.)
26
Barrier- Safety Issues
27
Barrier- Safety Issues
Improper treatment of crash barrier with Barriers placed before a kerb to protect the
parapet wall kerb (Wrong Practice)
28
Barrier-Safety Issues
29
Barrier-Safety Issues
30
Edge Treatment Issues
31
Minor Road Issues
32
Maintenance
Improper Maintenance
33
Lack of Facility - Issues
Lack of facilities (bus stops) forces dangerous behaviour from vulnerable road users
34
Misuse of Pedestrian
Facility - Issues
35
Pedestrian Crossing issue at
untreated intersection
36
Pedestrian Crossing issue at
untreated intersection
37
Absence of cross pedestrian
facility near School
38
Issues
During Construction
Construction Zone-Issues
40
Construction Zone-Issues
Insufficient diversion signs and barriers NJB spaced too far apart which may led to
safety hazard(Top)
Insufficient barriers preventing entry to
construction zone (Bottom)
41
Construction Zone-Issues
42
Construction Zone-Issues
No Barrier around deep excavation NJB spaced too far apart which may led to
No delineation safety hazard
43
Construction Zone-Issues
Exposed Reinforcement near construction site Unprotected construction site/ deep excavation
44
Construction Zone-Issues
Working beyond work zones without delineator Conglomeration of signs creating confusion
cones
45
Construction Zone-Issues
46
Diversion related issues at
Six-Laning
47
reflectorized and absent at
high embankments (>3 m)
48
THANK YOU
Any questions?