You are on page 1of 1

APPENDIX 15

TRAINING

For the Preliminary Training Program, please refer to Appendix 11, 7.2 (k).

The final document shall be elaborated by the Contractor in accordance with the Contract, the Functional
Technical Specification (FTS), the Amendments and the Pre- and Post Bid Clarifications, during the
Design Stage, and shall be subject to Company’s / Company’s Engineer’s approval.

You might also like