WIP Control Account

B/d 0 Finished Goods


Direct material (100 x R25) 2500 Bal c/f
Direct Labour (80 x 3 x R14) 3360
Man. Oerheads (70000/2000 x 3 x 80) 8400

14260

Workings
Cost per unit
Direct material (100 x R25) 25
Direct Labour (3 x R14) 42
Man. Oerheads (70000/2000 x 3) 105 Closing WIP = unconverte
172
=
Finished goods (R172 x 80) 13760

or

Direct material (80 x R25) 2000


Direct Labour (80 x 3 x R14) 3360
Man. Oerheads (70000/2000 x 3 x 80) 8400

13760
13760
500

14260

Closing WIP = unconverted material

(20 x R25) = 500